Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
1918 BHTGBC150 Borehole Somaliland_MoWR Jan. 30, 2014 Togdheer Burco Kurta Siibakhti Mahamed Curyan 01-06-07 Deero Company 9.5133 45.6338 1001.0 Rural Yes No 100.0 30.0 5.0 10.0 Lowara 2.2kW 97.0 Private Deero Company Solar system 2013-07-05 Strategic Boreholes Survey – BHS
1920 BHTGBC152 Borehole Somaliland_MoWR Jan. 30, 2014 Togdheer Burco Barqodharag Farm Ahmed Dirir (Owner) 01-06-07 Barqodharag 9.4566 45.6341 993.0 Rural Yes No 10 20 15.0 120.0 50.0 10.0 5.0 Lowara 7.5kW 100.0 Private Ahmed Dirir (Owner) Pump replacement and rising pipe 2012-09-01 To drill new borehole Strategic Boreholes Survey – BHS
1864 BHTGBC098 Borehole Somaliland_MoWR Jan. 30, 2014 Togdheer Burco Plaza Mahamoud Ahmed Bihi (Owner) 01-01-14 Mahamed Ahmed Bihi 9.5107 45.555 1028.0 Urban Yes No 90.0 7.9 530.0 996.0 Private Strategic Boreholes Survey – BHS
2008 BHWGBE013 Borehole Somaliland_MoWR Jan. 30, 2014 Woqooyi Galbeed Berbera Berbera ALharbi company 01-01-14 Ina Xarbi 10.3977 45.0394 83.0 Urban No No 42.0 38.0 Lowara 7.5 40.0 Private Strategic Boreholes Survey – BHS
1522 BHSLCA002 Borehole Somaliland_MoWR Jan. 29, 2014 Sool Caynabo Wadamogoo Cawil Cunaaye ( Owner ) 01-06-94 Cawil Cunaaye 8.9302 46.2202 847.0 Rural Yes Yes 400 2000 15000 2.0 110.0 30.0 40.0 6.0 50.0 450.0 Submersible Pump Lowara 27kW 96.0 7.4 4770.0 3180.0 Private 0.2 SC-UK - Save the Children UK Construction of water tank 2013-07-05 Construction of elevated Water tank, rehabilitation of animal troughs, pipeline system (riser pipe and distribution system 600m) and fast moving parts Strategic Boreholes Survey – BHS
2007 BHWGBE012 Borehole Somaliland_MoWR Jan. 29, 2014 Woqooyi Galbeed Berbera Jiifto ICRC - International Committee of The Red Cross 01-06-05 Jiifto 10.3254 44.9511 163.0 Rural No No 300 800 185.0 24.0 400.0 Solar Pump Solar Public ICRC - International Committee of The Red Cross Changed solar system 2009-07-01 Cleaning of the borehole Strategic Boreholes Survey – BHS
1925 BHTGBC157 Borehole Somaliland_MoWR Jan. 29, 2014 Togdheer Burco Qoryaale Caritas Switzerland 01-06-11 Qoryaale BH2 9.0827 45.9738 896.0 Rural Urban No No 320.0 238.0 25.0 2100.0 Submersible Pump Grundfos 7.5 242.0 Public Caritas Switzerland 1800m pipeline, two kiosks, borehole development, 3 animal troughs, latrine and 11kw submersible pump 2012-07-04 Replace+AU426:AU650ment borehole Strategic Boreholes Survey – BHS
2005 BHWGBE010 Borehole Somaliland_MoWR Jan. 29, 2014 Woqooyi Galbeed Berbera Xabaalo Tumaalood IR - Islamic Relief Somalia 01-06-13 Xabaalo Tumaalood 10.2156 44.8844 419.0 Rural Yes Yes 200 100 300 75.0 40.0 2.5 6.0 30.0 10.0 Solar Pump 56.0 Solar 7.4 7380.0 4940.0 Public Strategic Boreholes Survey – BHS
1579 BHSLLA037 Borehole Somaliland_MoWR Jan. 28, 2014 Sool Laas Caanood Dhunyo Xusho Private 01-06-06 Dhunyo Xuusho BH2 8.5296 47.3298 652.0 Rural Urban Yes Yes 300 2000 270.0 20.0 6.0 10.0 200.0 Grundfos 216.0 7.4 6690.0 4480.0 Private 0.2 Private Pump replacement 2013-07-05 Strategic Boreholes Survey – BHS
2258 BHWGHA151 Borehole Somaliland_MoWR Jan. 28, 2014 Woqooyi Galbeed Hargeisa Bandarwanaag Former Somali Government 01-06-83 Bandarwanaag 9.5985 44.392 1155.0 Rural Yes Yes 200 200 3000 220.0 160.0 5.0 5.0 25.0 2500.0 Submersible Pump SPI 11kW 188.0 8.3 4730.0 3170.0 Public NIS foundation Strategic Boreholes Survey – BHS

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, The World Bank, FCDO, AICS, SDC, Canada, Sweden and GCF

              ;