Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1526 | BHSLCA006 | Borehole | Somaliland_MoWR | Jan. 28, 2014 | Sool | Caynabo | Wadamogoo | — | Chinese Government | 01-06-74 | Wadamogoo BH1 | — | 8.9309 | 46.2668 | 828.0 | — | — | — | Rural Urban | Yes | — | Yes | — | 1000 | 500 | — | 5000 | — | — | 60.0 | — | — | 10.0 | 9.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 18.0 | — | 2500.0 | — | — | — | — | — | — | — | Grundfos 11kW | — | 36.0 | — | — | — | — | — | — | — | — | — | — | 7.7 | 2540.0 | 1690.0 | — | Public | — | — | — | — | — | — | — | — | — | — | Caritas Switzerland | Extension of pipeline system to the town and repairing of troughs | 2012-07-04 | New panel board, pump and pipeline extension to the town | — | Strategic Boreholes Survey – BHS |
7127 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Sool | taleex | Qalwo | 2.0 | UNICEF | 03/04/2020 | Qalwo BH | — | 8.9263499 | 48.2875784 | 513.0 | — | 1 | — | urban rural | yes | — | Yes | — | 2450 | 1200 | — | 2300 | 0.0 | — | 200.0 | pvc | 8.0 | 23.0 | 7.4 | 12.0 | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 2000.0 | — | 3 | 3 | yes | 20 | 8.0 | Submersible Pump | Lowara | 11.0 | 180.0 | Generator | Parkins | 45.0 | — | — | good | — | no | — | — | — | — | — | — | Communal | yes | 17/08/2020 | 4 | 0 | yes | 0.1 | yes | — | — | — | — | — | — | 1. Extension pipelines 2. Construction of new kiosks 3. Water supply | — | — |
8125 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Sool | caynabo | Caynabo | 8.0 | Somaliland MoWRD | 01/03/2022 | Caynab borehole2 | — | 9.0172064 | 46.3884904 | 798.0 | — | 2 | — | rural urban | yes | — | Yes | — | 50000 | 10000 | 0 | 20000 | 0.0 | — | 200.0 | pvc | 8.0 | 160.0 | 7.0 | 8.0 | 180.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 150.0 | 5000 | 1 | 0 | yes | 5 | 8.0 | Submersible Pump | Laura | 5.0 | 90.0 | Generator | NEF45SM1A.S500 Italy | 60.0 | — | — | good | The supply system is under construction | no | — | 36.0 | 7.9 | 1057.0 | 740.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | UNICEF | 01/03/2022 | Construction of new borehole and Construction of Water reservoir and installation of pipelines | Solar system and construction of caretaker room | — | — |
8124 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Sool | caynabo | Canabo3 | 8.0 | Somaliland MoWRD | 11/02/2022 | Cannabo3 | — | 9.0144131 | 46.3876899 | 787.0 | — | 2 | — | rural urban | yes | — | Yes | — | 50000 | 10000 | 0 | 20000 | 0.0 | — | 180.0 | pvc | 8.0 | 70.0 | 6.0 | 5.0 | 130.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | 150.0 | 50000 | 0 | 0 | yes | 5 | 40.0 | Submersible Pump | Shared with other canabo2 borehole | 6.0 | 70.0 | Generator | Same as the canabo borehole2 | 60.0 | — | — | good | The borehole is under construction | no | — | 36.0 | 7.9 | 1058.0 | 740.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | UNICEF | 01/03/2022 | Construction of new borehole | Construction of kiosks animal troughs and Construction of machine room and borehole caretaker room and fence | — | — |
1579 | BHSLLA037 | Borehole | Somaliland_MoWR | Jan. 28, 2014 | Sool | Laas Caanood | Dhunyo Xusho | — | Private | 01-06-06 | Dhunyo Xuusho BH2 | — | 8.5296 | 47.3298 | 652.0 | — | — | — | Rural Urban | Yes | — | Yes | — | — | 300 | — | 2000 | — | — | 270.0 | — | — | — | 20.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 10.0 | — | 200.0 | — | — | — | — | — | — | — | Grundfos | — | 216.0 | — | — | — | — | — | — | — | — | — | — | 7.4 | 6690.0 | 4480.0 | — | Private | — | — | — | — | — | 0.2 | — | — | — | — | Private | Pump replacement | 2013-07-05 | — | — | Strategic Boreholes Survey – BHS |
8111 | — | Borehole | Somaliland MoWRD | April 7, 2022 | Sool | las_caanood | Higlo | 1.5 | Private | 07/04/2015 | Geel caseeye | — | 8.5646566 | 47.6841849 | 539.0 | — | 2 | — | rural | yes | — | Yes | — | 0 | 40 | 0 | 0 | 3.0 | — | 65.0 | pvc | 8.0 | 40.0 | 10.0 | 8.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 48.0 | Galvanised Steel | 100.0 | 0 | 0 | 0 | yes | 2 | 8.0 | Submersible Pump | Luwara | 13.0 | 30.0 | Solar | — | — | Szyl-p300- 36 | 300.0 | good | Two solar panels damaged and need to be changed | no | — | 32.0 | 6.8 | 1150.0 | 810.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | Oxfam GB | 07/04/2019 | Constructed water tank of capacity 48 qubic meter | Supply system disconnected due to pipes damage and Water cannot go to water tanks. 2 solar panels also not working | — | — |
1519 | BHSLBH001 | Borehole | Somaliland_MoWRD | Oct. 19, 2019 | Sool | Buhoodle | Yagoori | 9.0 | — | 10-01-45 | Siixawle | — | 8.6891 | 47.0227 | 668.0 | 3.2 | 0 | 1571400887682.j | Rural | Yes | — | Yes | — | — | 800 | 0 | 3000 | 50.0 | — | 65.0 | GI | 12.0 | 31.0 | 16.6 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 4.0 | Galvanised Steel | 100.0 | 0 | 1 | 4 | Yes | 6 | 4.0 | Submersible Pump | Grundfos | 25.0 | 65.0 | Hybrid - Solar/Generator | Perkins | 45.0 | 320w | 45.0 | Good | — | No | — | 29.0 | 8.03 | 1640.0 | 1160.0 | — | Communal | — | 12-06-18 | 6 | 5 | No | — | No | — | — | — | Oxfam Novib | Construction of elevated water tank | 2018-12-12 | It needs construction masonry tank Construction of New animal troughs | — | Strategic Water Sources Survey – WSS_NATl |
8092 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Sool | las_caanood | Dhidinka | 0.0 | Private | 01/03/2007 | Dhidinka 2 | — | 8.529631 | 47.3298653 | 623.0 | — | 2 | — | rural | yes | — | Yes | — | 20 | 0 | 0 | 0 | 2.0 | — | 250.0 | pvc | 8.0 | 60.0 | 2.0 | 1.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | 30.0 | 0 | 0 | 0 | no | — | — | Submersible Pump | Luwara | 15.0 | 180.0 | Generator | Perkins | 30.0 | — | — | good | The supply system disconnected | no | — | 34.0 | 7.7 | 1200.0 | 800.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | ADRA | 11/04/2018 | Construction of water tank | Supply system replace and animal troughs are also needed | — | — |
8084 | — | Borehole | Somaliland MoWRD | April 14, 2022 | Sool | las_caanood | Yigoori | 8.0 | UNICEF | 14/04/2017 | Sixawle 4 | — | 8.7228551 | 47.0288079 | 623.0 | — | 4 | — | rural urban | yes | — | Yes | — | 5000 | 20 | 0 | 800 | 0.0 | — | 70.0 | pvc | 8.0 | 21.0 | 24.0 | 8.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | 6500.0 | 150 | 7 | 4 | yes | 40 | 9.0 | Submersible Pump | Ground fost | 15.0 | 60.0 | Hybrid - Solar/Generator | Perkins | 45.0 | M2 | 300.0 | good | — | no | — | 33.0 | 8.0 | 1260.0 | 900.0 | — | Communal | yes | 14/04/2016 | 8 | 0 | no | — | no | — | — | — | UNICEF | 14/04/2020 | Solar installed generator pipelines | The pipelines system requires replacement as they old and has damages in many parts of the system | — | — |
8083 | — | Borehole | Somaliland MoWRD | April 9, 2022 | Sool | las_caanood | Saahdheer | 0.6 | NPA | 09/04/2014 | Saaxdheer borehole | — | 8.0068544 | 47.1039935 | 605.0 | — | 1 | — | rural urban | yes | — | Yes | — | 5000 | 2100 | 0 | 1200 | 0.0 | — | 370.0 | pvc | 8.0 | 324.0 | 12.0 | 6.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 72.0 | Galvanised Steel | 650.0 | 20 | 5 | 7 | yes | 30 | 8.0 | Submersible Pump | Luwara | 45.0 | 320.0 | Hybrid - Solar/Generator | Perkins | 45.0 | BR-M300W | 300.0 | good | All the system are working properly | no | — | 31.0 | 7.4 | 1260.0 | 960.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | CARE Somalia | 09/05/2020 | Construction of generator room. Pipeline extension 2 meters kiosks Construction . Supply of riding pipes and fencing 110 m wires | Rehabilitation of water tank that has leakage and fencing the location of the borehole to protect from an authorised personnel. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France