Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7157 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Ceelbuh | 4.0 | Community_ | 23/07/2021 | Qablan borehole | — | 10.2417282 | 48.3252435 | 1079.0 | — | 5 | — | urban rural | yes | — | Yes | — | 4800 | 600 | — | 7000 | — | — | 285.0 | pvc | 8.0 | 240.0 | 14.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | — | — | — | 2 | yes | 15 | 10.0 | Submersible Pump | Lowara | — | 264.0 | Generator | Perkins | 45.0 | — | — | fair | No sufficient water storage. No water kiosks. | no | — | 32.6 | 7.3 | 2230.0 | 1118.0 | — | Communal | yes | 19/08/2021 | 3 | 2 | yes | 0.3 | yes | — | — | — | UNICEF | 11/04/2022 | Construction of elevated water tank Construction of two rooms. Construction of 1 water kiosks | 1: Solar power system with battery. 2: Pump and pipe lines 3: Generator. 4: Fencing. 5: Construction of another elevated water tank due capacity of borehole. 6: Construction of animal water troughs. | — | — |
4494 | DWSLTA016 | Dug Well | Somaliland_MoWRD | Nov. 2, 2019 | Sool | Taleex | Buq dheer | — | Other | 6/28/1950 | Buqdheer | — | 9.1622 | 48.2718 | 675.0 | 4.288 | 0 | 1572673751231.jpg | — | yes | — | Yes | — | 500 | 300 | 0 | 1000 | 0.0 | Yes | — | — | — | — | — | — | — | — | 6.0 | 4.0 | 2.0 | 4.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | 600.0 | 0 | 2 | 2 | yes | 2 | 6.0 | — | Grundfos | 1.1 | 4.0 | Submersible Pump | — | — | Photovoltaic | 1.5 | — | The supply system needs maintenance | No | — | 29.0 | 8.15 | 3160.0 | 2240.0 | — | — | No | — | — | — | No | — | No | — | — | — | CARE Somalia | Construction of elevated water tank and solar system | 2018-04-10 | Replacement of inlet pipe Rehabilitation water tank Rehabilitation of water kiosks Replacement of pipe line | — | Strategic Water Sources Survey – WSS_NATl |
8051 | — | Borehole | Somaliland MoWRD | March 30, 2022 | Togdheer | buuhoodle | Faarah Bullay | 3.0 | UNICEF | 24/12/2010 | Farah Bullay Borehole | — | 8.2214527996257 | 46.3526437059045 | 625.0 | — | 1 | — | rural urban | yes | — | Yes | — | 85000 | 5000 | 0 | 6000 | 0.0 | — | 365.0 | pvc | 8.0 | 330.0 | 60.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | PVC | 4.0 | 36000 | 9 | 6 | yes | 20 | 20.0 | Submersible Pump | Laura | 6.0 | 330.0 | Hybrid - Solar/Generator | JP45 | 60.0 | BRM300W | 300.0 | good | The | no | — | 30.0 | 7.1 | 1400.0 | 2600.0 | — | Communal | yes | 14/04/2010 | 5 | 3 | no | — | no | — | — | — | UNICEF | 30/03/2022 | Rehabilitation of borehole | Hhsygssg | — | — |
7380 | — | Borehole | FGS Ministry of Energy and Water Resources | April 22, 2022 | Lower Shabelle | marka | Horseed | 1.0 | Community | 22/04/2022 | Horsed water supply | — | 1.7172351 | 44.7631426 | 37.0 | — | 4 | — | urban rural | yes | — | Yes | — | 580 | 2 | 40 | 50 | 0.63 | — | 86.0 | pvc | 3.0 | 2.0 | 1.0 | 2.0 | 2.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 1.0 | Stainless Steel | 4.0 | 1 | 1 | 1 | yes | 4 | 1.0 | Submersible Pump | Sumerso used | 2.0 | 1.0 | Electricity Grid | — | — | — | — | good | Its conditions are good | no | — | 34.0 | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 1 | no | — | — | — | Community | 22-Apr-22 | Type of intervention carried by people | Currently required for the water source are building | — | — |
7156 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Togdheer | buuhoodle | Qabri Hulul | 0.2 | IR | 01/01/2016 | Qabri Hull borehole | — | 8.685275 | 46.2782063 | 832.0 | — | 1 | — | rural | yes | — | Yes | — | 2400 | 400 | 0 | 2800 | 0.0 | — | 333.0 | pvc | 8.0 | 270.0 | 15.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 25.0 | 400 | 1 | 8 | yes | 4 | 8.0 | Submersible Pump | Luara | 15.0 | 300.0 | Hybrid - Solar/Generator | JP45 | 45.0 | GPM300 | 300.0 | good | The condition of the solar system and has spare parts | no | — | 36.0 | 7.3 | 1000.0 | 394.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | IR | 01/02/2016 | Construction of new borehole | Rehabilitation of reservoirs and animal trough installation | — | — |
7963 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 13, 2022 | Mudug | hobyo | Galqurun | 0.8 | Community | 10/02/2003 | Galqurun | — | 6.1321026 | 47.676927 | 175.0 | — | 0 | — | rural urban | yes | — | Yes | — | 4000 | 7400 | — | 46000 | — | — | 204.0 | pvc | 8.0 | — | — | 19.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 74.0 | Galvanised Steel | 452.0 | 250 | 1 | 3 | yes | 17 | 11.0 | Submersible Pump | grunfos | — | 171.0 | Generator | Eveco | 45.0 | — | — | — | Pipelines are old and needs rehabilitation. | no | — | 31.5 | 7.66 | 2040.0 | 1370.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | IOM | solar, water tank , pump | — | — | — | — |
8257 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 31, 2022 | Lower Shabelle | wanla_weyn | Awdiirow | 1.0 | Private | 31/03/2018 | Biru waalideyn | — | 2.626423 | 44.8987704 | 94.0 | — | 1 | — | urban | no | 2 | No | Civil | 100 | — | — | — | — | — | — | — | — | — | — | — | — | — | 60.0 | 10.0 | 10.0 | 1.0 | 3.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 20.0 | Other | 0.0 | 100 | 0 | 3 | yes | 3 | 3.0 | Submersible Pump | Italy | 2.0 | 2.0 | Generator | Jengify | 20.0 | — | — | poor | This water supply isn't completing well | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | Private | 30-Mar-19 | Remove the soul from the well and main the generator and pump | Maintaining of generator and pump of the well | — | — |
7155 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 0.0 | Community | 01/04/2012 | Farah Bulley BH 2 | — | 8.2213759 | 46.3526494 | 631.0 | — | 2 | — | urban rural | yes | — | Yes | — | 2100 | 2000 | 250 | 5200 | 0.0 | — | 374.0 | pvc | 8.0 | — | 8.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 4500.0 | 220 | 8 | 3 | yes | 12 | 8.0 | Submersible Pump | Lowara | 18.5 | 330.0 | Hybrid - Solar/Generator | Parkins | 65.0 | SZYL-M330-36 | 23.1 | fair | — | yes | Colorless and odorless | 32.6 | 8.15 | 3980.0 | 2388.0 | — | Communal | yes | 01/04/2012 | 3 | 2 | yes | 0.1 | yes | — | — | — | PWDA | 01/01/2022 | 1. Rehabilitation of pump | 1. Installation of submersible pump 22 kW and cables 2. Rehabilitation of riser pipes 3. Extension pipelines 4. Extension and installation extra solar power. 5. Construction of generator room 6. Fancing | — | — |
7371 | — | Berkad | FGS Ministry of Energy and Water Resources | April 20, 2022 | Lower Shabelle | marka | Janaale | 1.0 | Community | 20/04/2022 | Gawoo water supply | — | 1.8090767 | 44.6900043 | 79.0 | — | 5 | — | rural urban | yes | — | Yes | — | 250 | 2 | 2 | 2 | 22.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 8.0 | 7.0 | 6.0 | — | — | — | — | — | Concrete/Masonry tank | 2.0 | Stainless Steel | 2.0 | 2 | 2 | 2 | yes | 2 | 2.0 | Surface mounted Pump | Sumerso | 5.0 | — | Electricity Grid | — | — | — | — | good | It's condition are good | no | — | 5.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 2 | no | — | — | — | Community | 20-Apr-22 | Carried out by people | Currently required for this water source are building | — | — |
7191 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Mudug | goldogob | Taaloole | — | Kuwait charity | 09/03/2019 | Taaloole BH | — | 7.0519069 | 47.0863116 | 346.0 | — | 1 | — | rural urban | yes | — | Yes | — | 600 | 500 | — | 1500 | 10.0 | — | 245.0 | pvc | 8.0 | — | 35.0 | 6.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | PVC | 1000.0 | 13 | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | Lowara | 15.0 | 185.0 | Solar | — | — | AS-P60-270W | 17.28 | good | — | yes | Colorless and odorless | 28.6 | 8.28 | 1708.0 | 843.0 | — | Communal | yes | 09/03/2019 | 3 | 2 | yes | 0.05 | yes | — | — | — | — | — | — | 1. Installation of generator. 2. Rehabilitation of pump and riser pipes 3. Construction of new elevated tank 4. Construction of koisks. 5. Extension of pipelines. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France