Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7325 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Nugaal eyl Badey eyl 0.3 NCA 24/02/2021 Dug well 7.9626331 49.8442485 -26.0 2 urban yes Yes 4900 12.0 7.0 16.0 10.0 2.0 Concrete/Masonry tank 50.0 Galvanised Steel 230.0 700 6 0 no Submersible Pump Lowara 2.0 6.0 Hybrid - Solar/Generator Parkins 45.0 PS2-1800 1.8 good yes Colorless and odorless 29.3 7.51 2420.0 1210.0 Utility/Local Authority yes 0.3 yes NCA 24/02/2021 Construction of ground water tank Pipeline extension and water kiosks. Construction of caretaker room. Older dug well reconstruction Rehabilitation of pipelines and extensions. Solar power rehabilitation Rehabilitation of solar panels.
8189 Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Gumbax 0.5 Community_ 24/05/2019 Xaajiyada dug well 10.8843349 51.1113377 -61.0 4 rural urban yes Yes 1800 200 3.0 2.0 yes 6 6.0 fair No storage tank No water kiosks. No distribution pipe lines no 28.2 8.1 508.0 254.0 Communal yes 19/06/2020 3 2 no no Community_e 25/08/2020 Cleaning the site of the dugwell Construction of animal water troughs.
7240 Dug Well Puntland Ministry of Energy Minerals and Water March 30, 2022 Sool las_caanood Boocame 0.0 Community 30/03/2003 Boocame dug well 8.3969708 47.9404117 488.0 1 urban rural yes Yes 10000 750 170 1700 0.0 9.0 9.0 15.0 2.0 Concrete/Masonry tank 20.0 PVC 2500.0 300 0 3 yes 15 8.0 Submersible Pump Lowara 4.0 8.0 Hybrid - Solar/Generator Parkins 13.0 15.0 poor Needs full rehabilitation yes Colorless and odorless 30.5 7.32 3110.0 2083.0 Utility/Local Authority yes 0.1 yes Agency not specified 30/03/2018 1. Installation of solar power 1. Construction of koisks. 2. Construction of new elevated tank.
7219 Dug Well Puntland Ministry of Energy Minerals and Water March 15, 2022 Bari bandar_beyla Biyo guduud 0.3 Puntland MoEMW 15/08/2014 Biyo guduud dug well 9.8131617 50.5917667 272.0 1 rural urban yes Yes 600 150 700 9.0 8.5 2.0 10.0 Concrete/Masonry tank 18.0 PVC 100.0 4 2 no Submersible Pump Lowara 6.0 Hybrid - Solar/Generator KINGMAN 11.5 poor The yield is low. The village has no water supply no 30.9 7.9 827.0 413.0 Communal no no yes IR 08/08/2021 1.Construction of two rooms, full rehabilitation of pipelines and kiosks and troughs, 2.Supplied solar power system and generator. 1.To digg the current well deep in order to increase its yield. 2. Another water tank, the current water tank is not enough. 3.the solar Fencing is plastic and they asked for a wire Fencing.
7095 Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xandha 0.2 Shilcon 22/07/2004 Xandha dug well 10.6524476 51.1366167 -27.0 1 rural urban yes Yes 3600 3000 7000 3.0 2.5 3.5 12.0 Concrete/Masonry tank 20.0 Galvanised Steel 500.0 4 4 3 yes 4 Submersible Pump Lowara 3.0 Hybrid - Solar/Generator KAMA poor The yield is low. The community that depend on are too much. The livestock that depend on are too much. no 33.5 8.3 1200.0 600.0 Communal yes 19/06/2004 4 3 yes 0.3 yes CARE Somalia 24/11/2019 1: Pipe line distribution. 2: Construction 3 kiosks and caretaker room and generator room. 3: Rehabilitation of water tank. 4: Supplied Generator 5: Installation of solar power system. 6: Construction of top cover protection of dug well. 1: Replacement of rusted iron pipes. 2: Replacement of submersible pump. 3: Construction of another elevated water tank. 4: Construction of remaining wall which protect the cover of the dug well. 5: Construction of another kiosks.
7115 Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Caano-yaskax 0.0 CEFA 28/03/2007 Caano yaskax dugwell 8.837375 48.7501967 452.0 1 urban rural yes Yes 1750 250 500 2000 0.0 9.0 2.0 2.0 8.0 4.0 Concrete/Masonry tank 30.0 PVC 700.0 1 4 2 no Submersible Pump Sara 4.0 8.0 Solar 2.0 good yes Colorless and odorless 30.5 7.8 3150.0 1570.0 Communal yes 28/03/2019 7 0 yes 0.05 yes NRC 28/03/2019 1. Installation of solar power 1. Extra depth of dugwell 2. Rehabilitation of pipelines 3. Extension pipelines 4. Construction of koisks.
7138 Dug Well Puntland Ministry of Energy Minerals and Water April 3, 2022 Sool taleex Carooley 0.0 Community 03/04/2006 Carooley Dug well 8.85608 48.1468823 577.0 1 rural urban yes Yes 3150 1220 120 2000 0.0 7.0 3.0 4.0 15.0 3.0 Concrete/Masonry tank 20.0 PVC 2800.0 50 6 6 yes 10 8.0 Submersible Pump Lowara 1.5 6.0 Hybrid - Solar/Generator Parkins 30.0 fair Needed full rehabilitation yes Colorless and odorless 34.5 7.1 6080.0 4073.0 Communal yes 03/04/1977 4 2 no yes 1. Rehabilitation pipelines 2. Rehabilitation of elevated water tank
8460 Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun Cuun dugwell 2 8.8162779 48.8932247 465.0 2 urban yes No A months , for power problems 750 9.0 7.0 3 no No Pump poor This dugwell and its water supply needs full rehabilitation no Communal yes 15/04/2007 3 2 no no 1. Rehabilitation of pipes 2. Rehabilitation of koisks 3. Replacement of pump. 4.
501 BHBYBA065 Borehole NRC Oct. 20, 2014 Bay Baydhaba Kormari 2.0 NRC - Norwegian Refugee Council Bayhaw two 3.1462 43.655 460.0 2.9 9 Rural Yes Yes 100 70 150 1.0 125.0 Concrete/Masonry tank 63.0 Stainless Steel 50.0 1400 1 No Submersible Pump 15.0 30.0 Solar 60 150.0 Good No 29.1 7.7 1150.0 570.0 Communal 1 2 No Yes Mator, room, fence, tailot, compum kiosk and truff Water Sources Data from Partners – WSD_Pat
1003 BHLSAF089 Borehole Islamic Relief Jan. 4, 2012 Lower Shabelle Afgooye Dabdamis 2.0567 45.2955 90.0 104.0 51.0 Submersible Pump Franklin 87.0 1900.0 IRC - International Rescue Committee Water Sources Data from Partners – WSD_Pat

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors