Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7022 | — | Dam | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Tubaney | 0.4 | Community | 31/01/1964 | Webiyow | — | 4.012145 | 44.453766 | — | — | 2 | — | rural | yes | — | Yes | — | 2 | 200 | 50 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 4.0 | 2.0 | — | — | — | — | — | — | — | — | Other | 2.0 | Other | 2.0 | 2 | — | — | yes | — | 3.0 | No Pump | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | 19-Apr-22 | 4 | 2 | yes | 2 | yes | — | — | — | — | — | — | Fencing with a single inlet gate to control | — | — |
7356 | — | Borehole | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Bolowka | 5.0 | Former Government | 21/12/1996 | Ali moalim | — | 4.015676 | 44.511146 | — | — | — | — | urban | yes | — | Yes | — | 2000 | — | — | — | — | — | 72.0 | pvc | — | 50.0 | 10.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 4.0 | 300 | — | — | yes | — | — | Submersible Pump | — | 10.0 | 40.0 | Electricity Grid | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | 3 | 3 | yes | — | no | — | — | — | — | — | — | Replacement of Gipipes and new pump installation | — | — |
8642 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bay | bur_hakaba | Isneb lawiga | — | Agency not specified | 01/01/2013 | Lowiga | — | 2.792974 | 44.095485 | 0.0 | — | 2 | — | rural | no | — | Yes | — | 240 | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Improve - Quick rehabilitation (Complete Solar system with small Pump is needed, constructing water troughs) | — | — |
8648 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bay | bur_hakaba | Luta | — | Agency not specified | 01/01/2006 | Wejid | — | 2.871825 | 43.86613 | 0.0 | — | 10 | — | rural | no | — | Yes | — | 300 | — | — | — | — | — | — | — | — | — | — | — | — | — | 10.0 | 9.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Improve - Development (Deeping and fencing is needed) | — | — |
7346 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 19, 2022 | Sanaag | ceerigaabo | Balibusle | 5.0 | — | — | Balibusle borehole | — | 10.0501626 | 48.586565 | 1023.0 | — | 1 | — | urban rural | yes | — | Yes | — | 10800 | 1500 | — | 6000 | — | — | 350.0 | pvc | 8.0 | 300.0 | 8.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | — | — | — | 2 | yes | 7 | 9.0 | Submersible Pump | — | — | — | Generator | LTG185G1 | 30.0 | — | — | fair | The village has no water supply system. No water kiosks in the village | no | — | 32.1 | 7.1 | 3930.0 | 1977.0 | — | Communal | no | — | — | — | yes | 0.04 | yes | — | — | — | GUMCO | 13/02/2021 | Replacement of distribution pipe line | 1: Amergrncy replacement of main raising pipes and submersible pump 2: Generator 3: Solar 4: Construction of another elevated water tank. 5: Construction of 2 animal water troughs. 6: Replacement of rusted distribution pipes. 7: Construction of caretaker room. 8: Construction of another borehole due to water demand | — | — |
7023 | — | Dam | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Bulo jadiid | 3.0 | Community | 04/11/1997 | Yogordiid | — | 4.012506 | 44.443272 | — | — | 2 | — | rural | yes | — | Yes | — | 50 | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 5.0 | 6.0 | 1.0 | — | — | — | — | — | — | — | — | Steel tank | 2.0 | ABS | 4.0 | 140 | — | — | no | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | 5 | — | yes | 2 | yes | — | — | — | SWALIM | — | — | Cannel rehabilitation and expanding | — | — |
7375 | — | Dam | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Tumaalka | 4.0 | Community | 01/03/1976 | Tumaalka | — | 4.076635 | 44.518057 | — | — | 1 | — | rural | yes | — | Yes | — | 2 | — | 2 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 4.0 | 1.0 | — | — | — | — | — | — | — | — | Other | — | ABS | 2.0 | 2 | — | 1 | yes | 2 | 1.0 | No Pump | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | 4 | 2 | yes | 2 | no | — | — | — | — | — | — | Deeping and fencing | — | — |
7036 | — | Dam | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Misqala | 5.0 | Community | 20/12/1982 | Misqala | — | 4.078896 | 44.517324 | — | — | 1 | — | rural | yes | — | Yes | — | 4 | 2 | 3 | 2 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1.0 | 2.0 | — | — | — | — | — | — | — | — | Other | 2.0 | Other | 2.0 | 300 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 5 | 2 | no | — | yes | — | — | — | — | — | — | Expanding and fencing | — | — |
7378 | — | Borehole | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Tieglow | 2.0 | Community | — | Biyooley 2 | — | 3.9375 | 44.3409 | — | — | — | — | rural | no | 5 | Abandoned | — | — | — | 1 | 0 | 1.0 | — | 120.0 | gi | 0.0 | 80.0 | 6.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Other | 10.0 | — | — | — | yes | — | — | Submersible Pump | — | — | — | Solar | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 6 | — | yes | 2 | no | — | — | — | — | — | — | Rehabilitation(Deeping and fencing is needed) | — | — |
8210 | — | Dam | Somaliland MoWRD | April 19, 2022 | Woqooyi Galbeed | hargeisa | Kaabada settlement | 0.1 | ASAL ORG. | 16/05/2019 | Kaabada galbeed Dam | — | 9.0550129 | 43.955035 | 1299.0 | — | 0 | — | rural | no | 11 | Yes | — | 20000 | 1000 | 500 | 10000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 54.0 | 45.0 | — | — | — | — | — | — | — | — | — | — | — | — | 300 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | fair | No supply system becouse it has no infrustracture. | no | — | 32.0 | 8.0 | 183.0 | 13.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | All infrastructure | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France