Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7856 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 13, 2022 | Mudug | galkayo | Toore | 0.9 | Community | — | TooreBH | — | 6.0269633 | 47.7954 | 175.0 | — | 0 | — | rural | yes | — | Yes | — | 6500 | 420 | — | 66000 | — | — | 220.0 | pvc | 8.0 | — | 16.0 | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 90.0 | 20 | 1 | 3 | yes | 3 | 9.0 | Submersible Pump | lowara | — | 180.0 | Generator | DOUTZ | 45.0 | — | — | fair | not have water supply sytem | no | — | 31.7 | 7.6 | 3170.0 | 2180.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | CPD | motor & small water tank | — | — | — | — |
211 | BHBRBO015 | Borehole | Puntland_PWDA | Nov. 16, 2019 | Bari | Bossaso | Juurile | 7.0 | Community | 14-08-15 | Xaaji Warsame | — | 10.4162 | 49.0904 | 662.0 | 4.9 | 2 | 73896373065.jpg | Rural | Yes | — | Yes | — | — | — | — | — | 12.0 | — | 130.0 | — | — | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 124.0 | PVC | 400.0 | — | — | — | No | — | — | Submersible Pump | Lowara 15kW | 17.0 | 102.0 | Hybrid - Solar/Generator | Dauze 30 | 30.0 | Solar panel 250w | 20.0 | Good | Good | No | — | 27.0 | — | 1570.0 | 1051.0 | — | Communal | — | 12-08-15 | — | — | — | — | — | — | — | — | — | — | — | Generator50kva, PUMP 15kw, pipe class C 3 inch 20. | — | Strategic Water Sources Survey – WSS_NATl |
197 | BHBRBO002 | Borehole | Puntland_PWDA | Nov. 7, 2019 | Bari | Bossaso | Qaw | 5.0 | Kuwait Government | 04-08-12 | Qaw1 | — | 11.2097 | 48.9874 | 22.0 | 4.9 | 2 | 73108817572.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 36.0 | — | — | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 6000.0 | 170 | 4 | 1 | No | — | — | Submersible Pump | Lowara 7.5 | 12.0 | 30.0 | Generator | Dauze 35 | 35.0 | — | — | Good | Good | No | — | 29.0 | — | 3100.0 | 1390.0 | — | Communal | — | 03-05-12 | 9 | 2 | Yes | 0.026 | No | — | — | — | CARE Somalia | GI Class C. Pump 7.5 | 2018-07-03 | Solar power, Tank 60cbm, pipeline 2000, | — | Strategic Water Sources Survey – WSS_NATl |
1129 | BHMDGK017 | Borehole | Puntland_PWDA | Nov. 17, 2019 | Mudug | Galkacyo | NAJAX IDPs | 0.0 | Kuwait Government | 20-11-18 | NAJAX IDPs BH | — | 6.8134 | 47.3896 | 302.0 | 4.9 | — | 1573451075888.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 185.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 9.0 | — | — | — | 4 | — | — | — | — | Submersible Pump | Lowara 11 KW | — | 140.0 | Hybrid - Solar/Generator | Deutz | 30.0 | — | — | Good | — | No | — | 27.9 | — | 3000.0 | 1484.0 | — | Communal | — | — | 3 | 4 | No | — | No | — | — | — | Chinese Government | — | — | Water supply, 50m3 Elevated water tank, management training | — | Strategic Water Sources Survey – WSS_NATl |
328 | BHBRLA001 | Borehole | Puntland_PWDA | Nov. 16, 2019 | Bari | Laasqoray | Waaciye | 1.5 | UNDP - United Nations Development Programme | 14-05-09 | Waciye BH1 | — | 10.0226 | 49.039 | 915.0 | 4.9 | — | 73887307214.jpg | Rural Urban | Yes | — | Yes | — | — | 300 | — | 1500 | — | — | 380.0 | — | — | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 6000.0 | 333 | 5 | 2 | Yes | 15 | 8.0 | Submersible Pump | Lowara 18. 5 | 17.0 | 368.0 | Hybrid - Solar/Generator | Deutz 74kW | 74.0 | 250kw | 30.0 | Good | Good | No | — | 29.0 | — | 5020.0 | 33.0 | — | Private-Public-Partnership | — | — | — | — | Yes | 0.026 | Yes | — | — | — | IOM - International Organisation of Migration | Solar Power hyper. Pupm 18.5kw, animal troughs. | 2017-08-14 | Upvc Pipeline 2500m, generator 70kva, pump18. 5kw, pipe GI Class C 50pcs. | — | Strategic Water Sources Survey – WSS_NATl |
7285 | — | Borehole | Somaliland MoWRD | March 16, 2022 | Awdal | baki | Fadhixun | 2.0 | ACTED | 16/03/2021 | Fadhixun | — | 9.5490207 | 44.051944 | 1255.0 | — | 2 | — | rural | yes | — | Yes | — | 1 | 1000 | 200 | 10000 | — | — | 370.0 | gi | 10.0 | 240.0 | 15.0 | 6.0 | 9.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 50.0 | 250 | 5 | 3 | yes | 5 | 5.0 | Submersible Pump | Hfh | 22.0 | 280.0 | Hybrid - Solar/Generator | Dhhd | 250.0 | Dhdh | 200.0 | good | Dhjdidsossoso | yes | Red, with poor smell | 30.0 | 9.0 | 1000.0 | 110.0 | — | Communal | no | — | — | — | yes | 0.25 | yes | — | — | — | ARDO | — | Increasing | — | — | — |
7471 | — | Borehole | Somaliland MoWRD | April 23, 2022 | Woqooyi Galbeed | gebiley | Arabsiyo | 0.1 | Xays Mineral Water | 21/05/2020 | Xays borehole 2 | — | 9.6716784 | 43.7662609 | 1359.0 | — | 0 | — | urban | yes | — | Yes | — | 12000 | — | — | — | — | — | 80.0 | gi | 8.0 | 30.0 | 6.0 | 17.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | PVC | — | 1714 | 0 | 0 | yes | 18 | 10.0 | Submersible Pump | Grundfos | 10.0 | 40.0 | Hybrid - Solar/Generator | Diesel Generator | 50.0 | Dusol | 16.8 | — | This water source condition of supply is fair and water tankers from hargeisa take water day and night. | no | — | 29.0 | 8.2 | 1200.0 | 855.0 | — | Private/Individual | — | — | — | — | yes | 0.06 | no | — | — | — | — | — | — | — | — | — |
7467 | — | Borehole | Somaliland MoWRD | April 23, 2022 | Woqooyi Galbeed | gebiley | Arabsiyo | 1.0 | Hinda sh.yusuf sh.madar | 18/06/2018 | Hinda borehole | — | 9.6571185 | 43.7687795 | 1387.0 | — | 0 | — | urban | yes | — | Yes | — | 12000 | — | — | — | — | — | 146.0 | gi | 8.0 | 79.0 | 6.0 | — | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | — | 1714 | 0 | 0 | yes | 18 | 10.0 | Submersible Pump | Grundfos | 20.0 | 110.0 | Hybrid - Solar/Generator | Diesel generating set | 25.0 | Vackson | 12.6 | fair | This borehole condition of supply is fair becouse water tankers from hargeisa come | no | — | 29.0 | 7.5 | 1542.0 | 1090.0 | — | Private/Individual | — | — | — | — | yes | 0.06 | no | — | — | — | — | — | — | — | — | — |
8096 | — | Borehole | Somaliland MoWRD | April 23, 2022 | Woqooyi Galbeed | gebiley | Arabsiyo | 0.1 | Xays Mineral Water | 22/08/2019 | Xays borehole 1 | — | 9.6729253 | 43.7663488 | 1358.0 | — | 0 | — | urban | yes | — | Yes | — | 12000 | — | — | — | — | — | 80.0 | gi | 8.0 | 30.0 | 15.0 | 17.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 200.0 | 1714 | 0 | 0 | no | — | — | Submersible Pump | Grundfos | 10.0 | 40.0 | Hybrid - Solar/Generator | Diesel generator | 50.0 | Dusol | 17.43 | fair | This borehole condition of supply is fair becouse water tankers from hargeisa come. | no | — | 29.0 | 8.2 | 1200.0 | 855.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
7740 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Bari | bandar_beyla | Qoton | 0.4 | Community_ | 16/03/2004 | Qoton dug well 2 | — | 9.594538 | 50.4708793 | 241.0 | — | 2 | — | rural urban | yes | — | Yes | — | 1200 | — | — | — | — | — | — | — | — | — | — | — | — | — | 4.5 | 3.5 | 1.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 5.0 | Galvanised Steel | — | 1 | 8 | — | no | — | — | Submersible Pump | Lowara | — | 3.0 | Hybrid - Solar/Generator | Diesel generator | — | DS72310W | 1.8 | poor | The yield of a dug well is very low. The solar power system of qoton is 6 panels only. | no | — | 31.0 | 8.0 | 2220.0 | 1115.0 | — | Communal | yes | 20/09/2005 | 5 | 0 | yes | 0.005 | — | — | — | — | CARE Somalia | 07/08/2020 | 1:Supplied of diesel generator 2: Construction generator room. 3: Installation of solar power system which contain 6 panels. 4: Replacement of submersible pump. | 1: Digging deep of the well in order to increase its yield. 2: Replecement of all rusted distribution pipe lines. 3: Installation of extra solar panels. 4: Construction of caretaker room. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France