Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7308 Borehole Galmudug Ministry of Energy and Water Resources March 20, 2022 Galgaduud dhusa_marreb Toon -Guriel 2.0 PAH 20/07/2021 Toon 5.1930692 45.8302261 303.0 0 rural yes Yes 5700 5000 0 6000 1.5 130.0 pvc 6.0 90.0 15.0 18.0 Concrete/Masonry tank 20.0 Galvanised Steel 60.0 0 2 1 yes 5 9.0 Submersible Pump Franklin 10.0 104.0 Generator Duotz 40.0 poor Water supply performance interms of rural use is very good , but facilities are not good though facilities including solar system and Troughs not exist. no 35.2 6.74 2501.0 1249.0 Private/Individual yes 0.02 yes PAH No Intervention after constructing and drilling 2021-06-20
7218 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Juurile 1.5 Former Somali Government 16/11/1986 Juurile borehole 10.3962938 49.0667047 682.0 2 rural urban yes Yes 1200 1500 5000 0.5 126.0 gi 6.0 117.0 10.0 12.0 Concrete/Masonry tank 120.0 Galvanised Steel 1700.0 8 2 yes 5 8.0 Submersible Pump Grundfos 126.0 Hybrid - Solar/Generator IVECO 32.0 SZYL-P325-36 24.7 poor The borehole has 3 water storage. two elevated water tank in the village and other one is located at the borehole site. The capacity of three tanks is 120 meter cubic. The pipe line connection b/n the village and borehole is been destroyed by floods. And the village has no water supply. Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. no 26.6 8.06 1740.0 865.0 Communal yes 17/09/2016 7 8 no yes NRC 13/11/2018 Installation of solar power system. Replacement of main raising pipes and submersible pump. Construction of two toilets. Widening of animal troughs. 1: Placement of pipe lines which distribute water to the village. 2: Replacement of main raising pipe lines and pump. 3: Construction of another borehole. 4: Construction of one elevated water tank.
2034 BHWGBE039 Borehole Somaliland_MoWRD Oct. 10, 2019 Woqooyi Galbeed Berbera Gobare 12.0 IR - Islamic Relief Somalia 23-10-14 Gobarebh 10.443 45.3467 166.0 4.7 1570710860038.jpg Rural No No Last 10 month The pump was stoped 2000 2400 104.0 GI 6.0 60.0 6.0 12.0 Concrete/Masonry tank 16.0 PVC 4.0 4 6 No Poor The pipe line broken No Communal No No Canadian High Commission Rehabilitation pipeline and pumb Strategic Water Sources Survey – WSS_NATl
1648 BHSNCR025 Borehole Somaliland_MoWRD Oct. 19, 2019 Sanaag Ceerigaabo Shacab 3.0 Ministry of Somalia 11-07-70 WD1Borehole 10.6309 47.3626 1796.0 4.3 0 1571472795645.jpg Urban Yes Abandoned Since 2012 the borehole is became fillback send 60.0 GI 6.0 0.0 0.0 0.0 0.0 Steel tank 27.0 PVC 6000.0 400 6 0 No No Pump Fair None No Utility/Local Authority No No Action Aid Generator and pump 1995-06-15 New drilling borehole Strategic Water Sources Survey – WSS_NATl
1545 BHSLLA003 Borehole Somaliland_MoWRD Oct. 20, 2019 Sool Laas Caanood Tukaraq BH1 0.0 Chinese Government 20-10-72 Tukaraq BH1 8.5446 47.7936 557.0 3.2 0 Urban Yes Yes 40.0 GI 6.0 3.0 6.0 9.0 Submersible Pump Grundfos 5.5kW 30.0 Public Full rehabilitation and fishing Strategic Water Sources Survey – WSS_NATl
2259 BHWGHA152 Borehole Somaliland_MoWRD Oct. 12, 2019 Woqooyi Galbeed Hargeisa Banadarwanag Private 12-11-09 Badarwanagbh 9.5987 44.3927 1158.0 4.7 1570882493632.jpg Rural Yes Abandoned Without generator and pump 300 1000 290.0 GI 6.0 Concrete/Masonry tank 15.0 Galvanised Steel 15.0 1 2 Fair No Other Strategic Water Sources Survey – WSS_NATl
114 BHAWZE001 Borehole Somaliland_MoWRD Dec. 17, 2019 Awdal Zeylac Xarirad SC - Save the Children 17-12-19 Team3 10.3159 42.8293 992.0 4.9 1576564260594.jpg Urban Yes Yes 185.0 GI 6.0 20.0 20.0 8.0 2.0 4.0 Concrete/Masonry tank 45.0 Galvanised Steel 1000.0 380 5 Yes 2 16.0 Good No 28.0 7.6 3600.0 1800.0 Utility/Local Authority Yes 0.03 No Replacement 3.5km pipeline and drilling news borehole Strategic Water Sources Survey – WSS_NATl
115 BHAWZE002 Borehole Somaliland_MoWRD Dec. 18, 2019 Awdal Zeylac Habas 3.0 Amoud faloundation 21-12-17 Habas 10.4259 42.8214 846.0 4.9 1576666285413.jpg Rural Urban Yes Yes 800 8000 20.0 90.0 PVC 6.0 30.0 20.0 11.0 Concrete/Masonry tank 24.0 Galvanised Steel 500.0 4 3 No Good No 28.0 8.0 1900.0 1300.0 Private/Individual No No Strategic Water Sources Survey – WSS_NATl
2027 BHWGBE032 Borehole Somaliland_MoWRD Oct. 9, 2019 Woqooyi Galbeed Berbera Tuulo barwaqo Ewada 23-10-14 Tulobarwaqobh 10.2824 45.1119 329.0 4.9 1570605463668.jpg Rural Urban Yes Yes 200 2000 70.0 PVC 6.0 40.0 35.0 12.0 2.0 1.0 Concrete/Masonry tank 35.0 Galvanised Steel 1.0 2 1 Yes 10 8.0 Good No 31.1 7.6 3330.0 670.0 Private/Individual Yes 0.3 No Strategic Water Sources Survey – WSS_NATl
7223 Borehole Puntland Ministry of Energy Minerals and Water Feb. 26, 2022 Mudug jariban Godobjiiran BH 1 0.0 Chinese Government 26/02/1986 Godobjiraan BH 1 7.5139859 49.4103095 123.0 2 rural urban yes Yes 28000 1500 10000 0.0 210.0 gi 6.0 20.0 10.0 1.5 Concrete/Masonry tank 36.0 Galvanised Steel 180.0 4000 6 3 yes 4 24.0 Submersible Pump Gran fos 11.0 150.0 Hybrid - Solar/Generator Parkins 45.0 SZYL_P300_36 15.0 fair Needs rehabilitation yes Colorless and odorless 31.6 7.7 2800.0 1876.0 Communal yes 26/02/1986 4 1 yes 0.15 yes KAALO Relief and Development 26/02/2017 Rehabilitation of elevated water tank 1. Drilling new borehole. 2.fancing borehole areas. 3. Rehabilitation of generators and caretaker rooms. 4. Needs to help fuel. 5. Construction of new kiosks. 6. Rehabilitation of kiosks. 7. Rehabilitation of animal thoughts.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors