Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7981 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 3.0 Somaliland MoWRD 07/04/2017 Higlo borehole 8.5553756 47.7281462 544.0 1 rural urban yes Yes 4500 17000 200 40000 12.0 65.0 pvc 8.0 45.0 16.0 12.0 0.0 0.0 Concrete/Masonry tank 16.0 Galvanised Steel 420.0 800 6 2 yes 5 8.0 Submersible Pump Laura 15.0 45.0 Hybrid - Solar/Generator Adpower 30.0 M2 300.0 good All the system are working no 30.0 7.4 1900.0 1200.0 Communal no no no Oxfam Novib 07/04/2020 Provision of generator construction water tank and extension pf pipelines The system is working well and no considerable isssu reported
7403 Dug Well Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Waadi khayr 0.1 Community_ 20/03/1991 Waadi khayr dug well 11.128186 51.0563147 -26.0 1 urban rural yes Yes 900 500 1000 8.0 6.0 4.0 4.0 Concrete/Masonry tank 8.0 PVC 15 6 2 yes 3 2.0 Submersible Pump Lowara 7.0 Hybrid - Solar/Generator Diesel generator fair There is no good yield. The elevated water tank is very ismall no 27.8 8.0 1857.0 928.0 Communal yes 21/09/2019 3 2 yes 0.2 no CARE Somalia 20/10/2021 Installation of solar power system. Installation of pump and raising pipes. Construction 6 kiosks and it's distribution pipe line. Construction of generator room Construction of another kiosks in the village Digging the deep of the well in order to increase the yield Construction of another elevated water tank
7325 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Nugaal eyl Badey eyl 0.3 NCA 24/02/2021 Dug well 7.9626331 49.8442485 -26.0 2 urban yes Yes 4900 12.0 7.0 16.0 10.0 2.0 Concrete/Masonry tank 50.0 Galvanised Steel 230.0 700 6 0 no Submersible Pump Lowara 2.0 6.0 Hybrid - Solar/Generator Parkins 45.0 PS2-1800 1.8 good yes Colorless and odorless 29.3 7.51 2420.0 1210.0 Utility/Local Authority yes 0.3 yes NCA 24/02/2021 Construction of ground water tank Pipeline extension and water kiosks. Construction of caretaker room. Older dug well reconstruction Rehabilitation of pipelines and extensions. Solar power rehabilitation Rehabilitation of solar panels.
7224 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Bayra CEFA 07/03/2010 Bayra BH 1 6.9555135 47.3198792 300.0 1 urban rural yes Yes 8400 1000 50 2500 0.0 200.0 pvc 8.0 70.0 12.0 20.0 3.0 Concrete/Masonry tank 60.0 PVC 4000.0 250 6 2 yes 10 8.0 Submersible Pump Lowara 11.0 137.0 Hybrid - Solar/Generator Parkins 30.0 SG600-022GB 22.0 fair Needs construction of elevated water tank yes Colorless and odorless 29.7 7.41 3985.0 1935.0 Communal yes 07/03/1974 5 2 yes 0.05 yes USAID 07/03/2020 Installation of solar power 1. Rehabilitation of elevated water tank. 3. Rehabilitation of Groundwater monitoring equipment in the borehole. 4. Rehabilitation of animal thoughts. 5. Rehabilitation of caretaker room.
1926 BHTGBC158 Borehole Somaliland_MoWRD Oct. 4, 2019 Togdheer Burco Coodanle 1.0 Somaliland MoWRD - Ministry of Water Resources Development 04-10-17 Codanle Borehole 8.3353 46.0423 698.0 4.9 1 1570170980284.jpg Rural Urban No Yes 1000 380.0 PVC 8.0 330.0 14.0 0.0 Concrete/Masonry tank 25.0 PVC 6.0 1500 6 6 No Submersible Pump Lowara 14.0 330.0 Hybrid - Solar/Generator Perkins 65.0 1500.0 Fair No 32.7 7.58 291.0 1450.0 Utility/Local Authority No No Needs submersible pump including cable, GI pipes 70pcs Class C, grundfos 15kva generator 100 kw Strategic Water Sources Survey – WSS_NATl
3344 DWGDLU018 Dug Well FGS_MoEWR Oct. 1, 2019 Gedo Luuq Hilaac Community 6/29/2007 Rooble 3.7941 42.5449 155.0 5 3 1571131885406.jpg yes Yes 7350 No 12.0 5.0 12.0 12.0 2.0 Concrete/Masonry tank PVC 34.0 1050 6 yes 7 5.0 Grundfos 12.0 10.0 Submersible Pump Changfa 125.0 No 32.4 7.36 1240.0 620.0 Yes 0.05 Elavated concrete tank 40m3. 2013-04-27 Supply and distribution pipes 2000m, Concrete Tank 40M3, solar System 20 pannel, 1.5 flood protection wall, solar pump system controller lorentz and well head seal. Strategic Water Sources Survey – WSS_NATl
7138 Dug Well Puntland Ministry of Energy Minerals and Water April 3, 2022 Sool taleex Carooley 0.0 Community 03/04/2006 Carooley Dug well 8.85608 48.1468823 577.0 1 rural urban yes Yes 3150 1220 120 2000 0.0 7.0 3.0 4.0 15.0 3.0 Concrete/Masonry tank 20.0 PVC 2800.0 50 6 6 yes 10 8.0 Submersible Pump Lowara 1.5 6.0 Hybrid - Solar/Generator Parkins 30.0 fair Needed full rehabilitation yes Colorless and odorless 34.5 7.1 6080.0 4073.0 Communal yes 03/04/1977 4 2 no yes 1. Rehabilitation pipelines 2. Rehabilitation of elevated water tank
7529 Dug Well Somaliland MoWRD March 30, 2022 Awdal zeylac caasha caddo 0.25 DRC 30/12/2006 Aasha caddo 11.1747362 43.4406391 4.0 100 urban yes Yes 3500 8.0 4.0 1.5 10.0 1.5 7.0 Concrete/Masonry tank 8.0 PVC 950.0 500 6 2 no Submersible Pump Grundfoz 1.7 7.0 Solar Jt-200 1.2 good The supply is poor becouse the yeid of the dug well is low no 31.4 8.26 1908.0 1270.0 Communal yes 16/07/2016 4 3 yes 0.05 no UNICEF 23/11/2021 Bump replacement Exploration of new boreholes and drilling new boreholes
8060 Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Qori-lugud 1.0 Save the children 18/10/2020 Qori lugud Startegic borehole 8.56011182069778 46.2379563041031 741.0 1 rural urban yes Yes 12000 7000 0 15000 0.0 354.0 pvc 8.0 176.0 16.0 12.0 Concrete/Masonry tank 24.0 PVC 15000.0 24000 6 6 yes 20 8.0 Submersible Pump Laura 16.0 310.0 Hybrid - Solar/Generator JP45 45.0 DS72300W 300.0 good The system is well functioning no 38.0 7.0 1360.0 2500.0 Communal yes 06/08/2016 4 3 no no Somaliland MoWRD 11/11/2021 The MowRD changed and rehabilitated the pump of the borehole to new one in 2022 Currently the pipeline connecting to the reservoir needs change and to be replaced to new ones, also water extension to the animal troughs is necessary as the most animal troughs connected in this system aren't functioning.
1669 BHSNCR045 Borehole Somaliland_MoWRD Nov. 4, 2019 Sanaag Ceerigaabo Jiidali 2.5 IR - Islamic Relief 07-05-15 Jiidali Borehole 10.6874 47.6675 1407.0 3.2 0 1572843704497.jpg Urban No 12 Yes 160.0 PVC 8.0 82.0 20.0 10.0 15.0 1.0 Concrete/Masonry tank 60.0 PVC 3500.0 6 3 Yes 10 8.0 Submersible Pump Lowara 17.0 114.0 Hybrid - Solar/Generator Perkins 45.0 HSE'250-60p 250.0 Fair 1000m of upvc its makes likage No 19.2 7.4 997.0 705.0 Utility/Local Authority No No IOM - International Organisation of Migration Replaced pump and resing pipe cable 2018-08-08 Fitting of GI pipe 3inch gabion wire one tiolat New generator replacement of 1000m Upvc pipe Strategic Water Sources Survey – WSS_NATl

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors