Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
1291 BHMDHO016 Borehole FGS_MoEWR Sept. 17, 2019 Mudug Hobyo Bitale 0.03 ICRC - International Committee of The Red Cross 13-04-11 Bitaale BH4 6.7054 47.8287 245.0 4026 0 1569595179191.jpg Rural Urban Yes Yes 1000 150 5000 0.02 210.0 PVC 8.0 80.0 12.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 1000.0 6000 0 0 Yes 4 16.0 Submersible Pump Franklin 11.0 150.0 Generator Perkins 63.0 Good No 31.7 7.2 3120.0 1530.0 Communal 18-04-96 6 2 No No IRC - International Rescue Committee Solar system 2011-05-01 New generator, pipelines, solar, animal troughs and kiosks Strategic Water Sources Survey – WSS_NATl
8037 Borehole Somaliland MoWRD May 5, 2022 Awdal borama Camuud Guure 02/03/2021 Guure 9.9406901 43.224795 1389.0 rural urban yes Yes 1400 500 300 1500 138.0 pvc 8.0 62.0 24.0 24.0 Concrete/Masonry tank 10.0 Galvanised Steel 100.0 150 1 1 no Submersible Pump Granfoc 20.0 87.0 Generator Perkin 250.0 fair no 31.0 7.0 1477.0 1040.0 Private/Individual no no
7994 Borehole Galmudug Ministry of Energy and Water Resources April 10, 2022 Mudug galkayo bandarqali 1.0 Bandarqali 6.6250625 47.851633 231.0 0 rural urban yes Yes 2400 250.0 pvc 9.0 20.0 9.0 Concrete/Masonry tank 52.0 Galvanised Steel 230.0 300 1 3 yes 6 10.0 Submersible Pump franglin 180.0 Solar gps 330 24.0 poor poor water supply system no 30.8 7.66 1800.0 910.0 Communal yes IRC solar
7546 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Caliyalle 1.0 SAACID 15/03/1996 Caliyalle BH 2.1793298 45.399509 122.0 rural yes Yes 2550 0 0 0 0.0 150.0 gi 8.0 115.0 8.0 Concrete/Masonry tank 25.0 Galvanised Steel 100.0 170 5 0 no Submersible Pump Mechanical pump 115.0 Generator LISTER-PETTER 30.0 fair It's in a good condition no Private-Public-Partnership yes 0.05 no No intervention since the establishment date Supply of Generator and construction of elevated water tank and pipeline extension.
1296 BHMDHO020 Borehole FGS_MoEWR Sept. 17, 2019 Mudug Hobyo Bitale 50.0 ICRC - International Committee of The Red Cross 14-04-11 Kulmiye 6.634 47.8401 235.0 3799 0 1568702551647.jpg Rural Urban Yes Yes 1500 150 2700 0.3 210.0 PVC 8.0 80.0 12.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 6000 0 0 Yes 4 10.0 Submersible Pump Franklin 11.0 150.0 Hybrid - Solar/Generator Perkins 63.0 250.0 Good Need kiosks, animal troughs, pipelines and tanks Yes 31.7 7.2 3120.0 1530.0 Communal 17-07-96 6 2 Yes 0.1 Yes IRC - International Rescue Committee Solar system 2017-09-22 New borehole, new generator, full rehabilitation Strategic Water Sources Survey – WSS_NATl
7881 Borehole Somaliland MoWRD April 9, 2022 Sool las_caanood Karin gorfood 0.8 IR 01/01/2014 Karin Garfood borehole 8.1271413 47.7511336 702.0 1 rural urban yes Yes 560 160 0 8000 0.0 290.0 pvc 8.0 246.0 40.0 12.0 4.0 2.0 Concrete/Masonry tank 48.0 Galvanised Steel 8000.0 250 0 2 yes 12 18.0 Submersible Pump Luwara 7.0 240.0 Hybrid - Solar/Generator Perkins 60.0 Photovoltiac module 300.0 good The supply is working good though the solar system is not functioning due to electrical shock that damage the entire soil panels. no 27.0 7.9 2700.0 1900.0 Communal no no no IR 09/04/2020 Installed new pump and and make maintenance to the pipelines Solar panels are not working and require either replacement or repairing
7986 Dug Well Galmudug Ministry of Energy and Water Resources April 16, 2022 Mudug galkayo Ceel Akhwaan 0.5 community CeeAkhwaan sw 6.6934195 47.3809678 275.0 1 rural yes Yes 2000 700 5230 18.0 15.0 Concrete/Masonry tank 0.0 Galvanised Steel 0.0 0 No Pump no 0.0 8.11 1855.0 956.0 Communal
7536 Borehole Puntland Ministry of Energy Minerals and Water April 10, 2022 Sanaag laasqoray Hadaftimo 4.0 Al manhal charitable organization 17/07/2009 Hadaaftimo borehole 1 10.7433336 48.110193 1286.0 2 rural urban yes Yes 12000 1000 500 6000 1.0 357.0 pvc 8.0 220.0 12.0 16.0 0.5 Concrete/Masonry tank 62.0 Galvanised Steel 150.0 2 3 yes 6 8.0 Submersible Pump Lowara 315.0 Hybrid - Solar/Generator Perkins 60.0 GPS-300-360 25.92 fair The borehole needs amergency replacement of pump and main raising pipes. The storage water tanks are old and makes water leaking. no 32.1 7.4 1419.0 707.0 Communal yes 22/09/2018 3 2 yes 0.05 no NRC 16/04/2020 1: Solar power system. 2: Rehabilitation of elevated water tank. 3: Construction of animal water troughs. 4: Replacement of main raising pipes and submersible pump. 1: Amergrncy construction of another borehole due to water demand 2: Amergency replacement of main raising pipes and submersible pump. 3: Replacement of electric cable. 4: Replacement of solar inverter. 5: Assessment of borehole yield in order to get problem related borehole yield reduction. 6: Construction of elevated water tank. 7: Generator and solar power storage ( battery)
1303 BHMDHO024 Borehole FGS_MoEWR Sept. 17, 2019 Mudug Hobyo Jillable 1.5 GSA - General Service Agency 13-04-09 Jillable BH1 6.4166 47.8557 188.0 1568779634414.jpg Rural Urban No 2 No 2009, high salinity and poor condition 0 0 0 0.0 117.0 PVC 8.0 Concrete/Masonry tank 40.0 Galvanised Steel 2000.0 No No Pump No Propose another borehole Strategic Water Sources Survey – WSS_NATl
7981 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 3.0 Somaliland MoWRD 07/04/2017 Higlo borehole 8.5553756 47.7281462 544.0 1 rural urban yes Yes 4500 17000 200 40000 12.0 65.0 pvc 8.0 45.0 16.0 12.0 0.0 0.0 Concrete/Masonry tank 16.0 Galvanised Steel 420.0 800 6 2 yes 5 8.0 Submersible Pump Laura 15.0 45.0 Hybrid - Solar/Generator Adpower 30.0 M2 300.0 good All the system are working no 30.0 7.4 1900.0 1200.0 Communal no no no Oxfam Novib 07/04/2020 Provision of generator construction water tank and extension pf pipelines The system is working well and no considerable isssu reported

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors