Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1531 | BHSLCA011 | Borehole | Somaliland_MoWRD | Nov. 11, 2019 | Sool | Caynabo | Gadhka | 6.0 | Hargesia Voluntary Youth Committee | 11-07-03 | Gadhka | — | 9.3079 | 46.3555 | 706.0 | 3.2 | 0 | 1573448518534.jpg | Rural | Yes | — | Yes | — | — | 500 | 0 | 700 | 0.0 | — | 160.0 | PVC | 8.0 | 80.0 | 10.0 | 2.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | 100.0 | 0 | 0 | 4 | No | — | — | Submersible Pump | Grundfos | 11.0 | 140.0 | Solar | — | — | Photovoltaic | 16.5 | Good | — | No | — | 22.0 | 9.22 | 1180.0 | 7680.0 | — | Communal | — | — | — | — | No | — | No | — | — | — | S/N/N | — | — | #NAME? | — | Strategic Water Sources Survey – WSS_NATl |
1538 | BHSLCA017 | Borehole | Somaliland_MoWRD | Nov. 11, 2019 | Sool | Caynabo | Qori dheere | 2.5 | UNICEF - United Nations Children's Fund | 11-06-17 | Qoridheere | — | 9.2022 | 46.6665 | 673.0 | 3.2 | 0 | 1573455381672.jpg | Rural | Yes | — | Yes | — | — | 800 | 0 | 1000 | 10.0 | — | 133.0 | PVC | 8.0 | 60.0 | 10.0 | 6.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 400.0 | 0 | 1 | 4 | Yes | 3 | 6.0 | Submersible Pump | Grundfos | 11.0 | 100.0 | Hybrid - Solar/Generator | Perkins | 45.0 | Photovoltaic | 15.6 | Good | — | No | — | 30.0 | 8.27 | 2960.0 | 2170.0 | — | Communal | — | — | — | — | No | — | No | — | — | — | Oxfam Novib | Solar installation Construction of animal troughs Pipe line extention | 2019-10-03 | #NAME? | — | Strategic Water Sources Survey – WSS_NATl |
1555 | BHSLLA013 | Borehole | Somaliland_MoWRD | Oct. 20, 2019 | Sool | Laas Caanood | Gambadha BH2 | 1.0 | — | 20-04-19 | Gambadhe BH2 | — | 8.5722 | 47.5965 | 567.0 | 3.2 | 1 | 1571569491005.jpg | Rural | Yes | — | No | The water source stopped since 2019,there is no pipe line and solar system. | — | 0 | 0 | 0 | 0.0 | — | 65.0 | PVC | 8.0 | 6.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | 0 | 0 | 0 | No | — | — | No Pump | — | — | — | — | — | — | — | — | Poor | There is no connection water supply system | No | — | 31.0 | 7.9 | 1961.0 | 1350.0 | — | Communal | — | — | — | — | No | — | No | — | — | — | — | No intervention | — | #NAME? | — | Strategic Water Sources Survey – WSS_NATl |
7943 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | Save the children | 13/02/2021 | Cagaraan BH | — | 7.0347377 | 47.4901695 | 284.0 | — | 2 | — | urban rural | yes | — | Yes | — | 700 | — | — | — | — | — | 180.0 | pvc | 8.0 | 95.0 | 25.0 | 12.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2500.0 | — | 4 | 2 | yes | 7 | 8.0 | Submersible Pump | — | 11.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 45.0 | PV800-4T30G | 30.0 | good | — | yes | Colorless and odorless | 35.2 | 8.05 | 2235.0 | 1115.0 | — | Communal | yes | 13/03/2021 | 3 | — | no | — | no | — | — | — | Save the children | 13/01/2021 | 1 . Installation of solar power | Fuel supporting. Rehabilitation pipelines | — | — |
7818 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Samansamdho | 0.5 | Community | 02/04/2021 | Samansabdho BH | — | 6.9928077 | 47.6915199 | 295.0 | — | 2 | — | rural | yes | — | Yes | — | 1050 | 15000 | — | 20000 | 0.0 | — | 146.0 | pvc | 8.0 | — | 16.7 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 150.0 | — | 2 | 2 | yes | 12 | 72.0 | Submersible Pump | — | — | 120.0 | Generator | Parkins | 55.0 | — | — | fair | — | yes | Colorless and odorless | 37.5 | 8.37 | 4050.0 | 1990.0 | — | Communal | yes | 02/08/2021 | 5 | 1 | yes | — | yes | — | — | — | KAALO Relief and Development | 02/12/2021 | Construction of generator room Animal thoughts Koisks | Fuel supporting Extension pipelines Water committees training Fancing Installation of solar power. | — | — |
8350 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 26, 2022 | Nugaal | garowe | Isku faruuran | 0.5 | Community | 26/03/2022 | Iskufaruuran BH | — | 8.4692287 | 48.6500911 | 378.0 | — | 2 | — | urban | yes | — | Yes | — | 120 | — | — | — | — | — | 70.0 | pvc | 8.0 | — | 12.0 | 6.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Stainless Steel | 500.0 | 10 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 7.5 | 55.0 | — | — | — | — | — | poor | Absolutely needed full rehabilitation | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | No | 1. Installation of Solar power 2. Insstallation Genetor 3. Construction Koisks 4.Fence around borehole. | — | — |
8802 | — | Borehole | — | — | Bay | Baydhaba | Bonkay | 0.0 | — | 13/09/2022 | Bonkay Borehole | — | 3.14507 | 43.63505 | 475.0 | — | — | — | Rural | — | — | Yes | — | 0 | — | — | — | — | — | 151.8 | uPVC | 7.5 | 62.16 | 10.5 | — | — | 1.167 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | 7.5kw/10HP | — | 131.62 | Generator | Generator | 30.0 | Polycrystalline | 445.0 | Good | Polycrystalline Solar panel 445w with maximum power voltage of 41.30v, and maximum system voltage DC1500V. 32pcs was installed. | No | — | — | 7.6 | 1820.0 | 900.0 | — | — | — | — | — | — | — | 0.0 | — | 0.0 | — | — | — | — | — | — | Suitable for both livestock and human consumption | — |
8835 | — | Borehole | UNICEF | Jan. 1, 2023 | Sanaag | — | Baran | 0.0 | UNICEF | 2023-01-01 00:00:00 | Baran | — | 10.75641 | 48.41082 | — | — | — | — | Rural | — | — | Yes | — | 0 | — | — | — | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.0 | — | 0.0 | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France