Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
251 | BHBRBO054 | Borehole | Puntland_PSAWEN | Jan. 1, 2014 | Bari | Bossaso | Biyo kulule | — | Qatar Charity | 01-06-11 | Mogadisho University BH2 | — | 11.2598 | 49.1948 | 41.0 | — | — | — | Urban | Yes | — | No | — | 20 | — | — | — | — | — | 35.0 | — | — | 33.0 | 17.0 | 1.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20.0 | — | 100.0 | — | — | — | — | — | — | — | Lowara 2.5kW | — | 34.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Public-Private | — | — | — | — | — | — | — | — | — | — | — | — | — | Repairing the pump | — | Strategic Boreholes Survey – BHS |
1369 | BHMDXA001 | Borehole | SWALIM_GSA | June 6, 2018 | Mudug | Xarardheere | Hawl wadag | — | GTZ - German Agency for Technical Assistance | 01-01-86 | Wadajir BH | — | 4.6563 | 47.8577 | 228.0 | — | — | — | Urban | — | — | Yes | — | — | 150 | 500 | 2300 | — | — | 36.0 | — | — | 8.0 | 8.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | — | — | — | — | — | — | — | — | Submersible Pump | — | — | 26.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Community | — | 01-01-92 | — | — | — | — | — | — | — | — | ICRC - International Committee of The Red Cross | rehabilitation of generator room and water tank | 2013-01-01 | Rehabilitate | — | Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS |
1744 | BHSNLA005 | Borehole | Somaliland_MoWRD | Oct. 28, 2019 | Sanaag | Laasqoray | ULXEED | 0.5 | Qatar Charity | 21-02-17 | ULXED BOREHOLE | — | 11.1044 | 48.4938 | 198.0 | 4.3 | 0 | 1572243726383.jpg | Urban | No | 9 | No | Since October 2018 electric cable between generator and pump 50m | — | — | — | — | — | — | 36.0 | PVC | 8.0 | 24.0 | 10.0 | 5.0 | 5.0 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | 70.0 | 0 | 1 | 3 | Yes | 4 | 8.0 | Submersible Pump | Grundfos | 7.0 | 34.0 | Generator | Perkins | 22.0 | — | — | Good | Good | No | — | — | — | — | — | — | Communal | — | 24-03-17 | 5 | 2 | No | — | No | — | — | — | DRC - Danish Refugee Council (Regional Office) | — | — | Solar system New cable caretaker room single latrin fence pipeline system 800m and stam pipe of truck extra kiosk | — | Strategic Water Sources Survey – WSS_NATl |
1745 | BHSNLA006 | Borehole | Puntland_PSAWEN | Dec. 29, 2013 | Sanaag | Laasqoray | Buran | — | Conoco Oil company | 01-03-89 | Buran BH1 | — | 10.2111 | 48.7745 | 968.0 | — | — | — | Rural Urban | Yes | — | Yes | — | 2000 | 600 | — | 5000 | — | — | 36.0 | — | — | 8.0 | 6.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 30.0 | — | 3000.0 | — | — | — | — | — | — | No Pump | Grundfos 3.5 | — | 33.0 | — | — | — | — | — | — | — | — | — | — | 7.7 | 1830.0 | 1100.0 | — | Public | — | — | — | — | — | 0.5 | — | 0.25 | — | — | PSAWEN - Puntland State Agency for Water, Energy and Natural Resources/NRC - Norwegian Refugee Council | Risinp | 2010-08-01 | Solar system and water tank | — | Strategic Boreholes Survey – BHS |
7347 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 13, 2022 | Sanaag | ceerigaabo | Buraan | 0.5 | Kanoko | 01/01/1988 | Buraan borehole 1 | — | 10.2111741 | 48.7745235 | 942.0 | — | 5 | — | rural urban | yes | — | Yes | — | 4500 | 300 | — | 500 | — | — | 36.0 | pvc | 8.0 | 7.0 | 4.0 | 8.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | 300 | 1 | 4 | yes | 8 | 8.0 | Submersible Pump | — | — | 34.0 | Hybrid - Solar/Generator | Perkins | 33.0 | DS60250W | 9.0 | fair | Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes Both boreholes works same hours which is equal 8+8 = 16 hours. | no | — | 31.9 | 7.4 | 1581.0 | 775.0 | — | Communal | yes | 25/05/1989 | 4 | 2 | yes | 0.03 | yes | — | — | — | ACTED | 26/08/2020 | Construction of 1 room Generator Rehabilitation of 3 solar panels. Construction of storage water tank. Replacement of main raising pipes and submersible pump. | 1: Amergency replacement of main raising pipes and submersible pump 2: Generator. 3: Replacement of rusted distribution pipes 4: Construction of 1 elevated water tank. 5: Solar power storage (battery). | — | — |
280 | BHBRBO082 | Borehole | Puntland_PSAWEN | Dec. 31, 2013 | Bari | Bossaso | East Africa | — | East Africa university | 01-06-09 | East Africa University BH2 | — | 11.2392 | 49.2059 | 65.0 | — | — | — | Urban | Yes | — | Yes | — | 500 | — | — | — | 0.3 | — | 36.0 | — | — | 16.0 | 4.0 | 5.0 | 15.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | — | 200.0 | — | — | — | — | — | — | Submersible Pump | Lowara 1.5 | — | 35.0 | — | — | — | — | — | — | — | — | — | — | 7.0 | 1362.0 | 911.0 | — | Public-Private | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Strategic Boreholes Survey – BHS |
2002 | BHWGBE007 | Borehole | Somaliland_MoWRD | Oct. 12, 2019 | Woqooyi Galbeed | Berbera | Lafarug | 2.0 | Private | 12-10-07 | Calihaybebh | — | 9.9744 | 44.772 | 766.0 | 4.9 | — | 1570866433324.jpg | Rural | Yes | — | Yes | — | — | 100 | — | 500 | 15.0 | — | 36.0 | GI | 6.0 | 15.0 | 15.0 | 8.0 | 2.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 30.0 | Galvanised Steel | 200.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Fair | — | No | — | 27.1 | 7.65 | 1565.0 | 1510.0 | — | Private/Individual | — | — | — | — | No | — | No | — | — | — | — | — | — | — | — | Strategic Water Sources Survey – WSS_NATl |
197 | BHBRBO002 | Borehole | Puntland_PWDA | Nov. 7, 2019 | Bari | Bossaso | Qaw | 5.0 | Kuwait Government | 04-08-12 | Qaw1 | — | 11.2097 | 48.9874 | 22.0 | 4.9 | 2 | 73108817572.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 36.0 | — | — | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 6000.0 | 170 | 4 | 1 | No | — | — | Submersible Pump | Lowara 7.5 | 12.0 | 30.0 | Generator | Dauze 35 | 35.0 | — | — | Good | Good | No | — | 29.0 | — | 3100.0 | 1390.0 | — | Communal | — | 03-05-12 | 9 | 2 | Yes | 0.026 | No | — | — | — | CARE Somalia | GI Class C. Pump 7.5 | 2018-07-03 | Solar power, Tank 60cbm, pipeline 2000, | — | Strategic Water Sources Survey – WSS_NATl |
7408 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 7, 2022 | Bari | bossaso | Qaw | 5.0 | Kuwait charity | 01/01/2013 | Qaw borehole 1 | — | 11.2097018 | 48.9873742 | 1.0 | — | 1 | — | urban | yes | — | Yes | — | 420 | — | — | — | — | — | 36.0 | pvc | 8.0 | 20.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | 4000.0 | 80 | — | — | no | — | — | Submersible Pump | — | — | 33.0 | Hybrid - Solar/Generator | Perkins | 30.0 | — | — | poor | Distribution pipes are rusted | no | — | 33.0 | 7.8 | 1580.0 | 790.0 | — | Communal | yes | 06/01/2013 | 4 | 3 | yes | 0.2 | no | — | — | — | KAALO Relief and Development | 08/12/2021 | Solar | 1: Pipelines Rehabilitation 2: Caretaker room 3: Water tank Rehabilitation 4: Toilets | — | — |
2003 | BHWGBE008 | Borehole | Somaliland_MoWR | Jan. 28, 2014 | Woqooyi Galbeed | Berbera | Lafaruug | — | Private | 01-06-83 | Cali Haybe | — | 9.9743 | 44.7722 | 764.0 | — | — | — | Rural | Yes | — | Yes | — | 300 | — | — | — | 1.0 | — | 36.0 | — | — | 10.0 | 5.0 | 7.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 31.0 | — | 200.0 | — | — | — | — | — | — | — | Solar pump | — | 31.0 | Solar | — | — | — | — | — | — | — | — | — | 7.6 | 1650.0 | 1110.0 | — | Private | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Strategic Boreholes Survey – BHS |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France