Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8352 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Salaama 2 | — | Community | 28/03/2017 | Salaama 2 | — | 8.5915196 | 49.0676655 | 467.0 | — | 2 | — | rural | yes | — | Yes | — | 150 | 1500 | — | 3000 | 0.0 | — | 76.0 | pvc | 8.0 | — | 16.0 | 12.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | PVC | — | 2 | 2 | 2 | yes | 0 | — | Submersible Pump | 7.5 | 7.5 | 45.0 | Solar | — | — | — | 10.8 | good | — | yes | Colorless and odorless | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | Community | 17/04/2020 | 1. Solar installation | 1. Replacement of generator. 2. Replacement of pump. | — | — |
8774 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | ubax | 5.0 | Community | 28/03/2022 | ceel dhagarcad | — | 6.2467117 | 46.23598 | 385.0 | — | 3 | — | urban rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7868 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Cuun | 0.0 | Community | 28/03/2000 | Cuun dug well | — | 8.8180342 | 48.8915942 | 468.0 | — | 1 | — | urban | yes | — | Yes | — | 1162 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 3.0 | 6.0 | 8.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 600.0 | 0 | 2 | 0 | yes | 2 | 8.0 | Submersible Pump | Lowara | 4.0 | 8.0 | Solar | — | — | — | 5.0 | fair | Some rehabilitation needed | yes | Colorless and odorless | 32.8 | 7.8 | 2920.0 | 1460.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Rehabilitation of pipelines 2. Construction of koisks 3. Extension of pipelines. | — | — |
7396 | — | Borehole | FGS Ministry of Energy and Water Resources | March 28, 2022 | Lower Shabelle | afgooye | Xaawo taako | 1.5 | Zam zam foundation | 24/02/2013 | Danab Water Supply | — | 2.1402088 | 45.1201973 | 72.0 | — | 5 | — | rural | yes | — | Yes | — | 3500 | 0 | 0 | 0 | 3.0 | — | 120.0 | pvc | 8.0 | 90.0 | 100.0 | 24.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 480.0 | PVC | 8000.0 | 800 | 0 | 0 | yes | 2 | 14.0 | Submersible Pump | Italy | 20.0 | 3.0 | Generator | England | 50.0 | — | — | good | We provide somtel, Hormuud, Afgooye hospital | no | — | 0.0 | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 0.26 | no | — | — | — | Private | 21-Dec-21 | Provision of pipeline, maintaining generator | Generator reservor, pump reserves l, pipeline reserves and rehabilitation | — | — |
8165 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Bari | iskushuban | Ufayn sare | 4.0 | Community_ | 22/06/2012 | Ufayn sare spring | — | 10.7955108 | 49.6675304 | 692.0 | — | 1 | — | rural urban | yes | — | Yes | — | 4800 | 500 | — | 1000 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 25.0 | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 3000.0 | — | — | 1 | yes | 4 | 6.0 | Submersible Pump | Lowara | — | — | — | — | — | — | — | — | — | no | — | 31.1 | 8.0 | 750.0 | 375.0 | — | Communal | yes | 20/06/2012 | 2 | 1 | no | — | no | — | — | — | Community_e | 21/08/2019 | Extention of distribution pipe lines | 1: extention of distribution pipe line to the village, now water does not reach to village. 2: Construction water kiosks in the village. 3: Construction of columns which holds the distribution pipe line when they crosses to the rivers, now pipes become disconnected floods occurs. 4: pipe lines as safety. 5: Construction of elevated water tank. | — | — |
8307 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | PWDA | 27/03/2020 | Madaxtooyo BH 2 | — | 8.4128335 | 48.4650113 | 435.0 | — | 1 | — | urban | yes | — | Yes | — | 120 | — | — | — | — | — | 240.0 | pvc | 8.0 | — | 18.0 | 10.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 700.0 | 5 | 0 | 0 | no | — | — | Submersible Pump | — | 15.0 | 220.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | — | good | — | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Fancing of borehole | — | — |
8507 | — | Borehole | FGS Ministry of Energy and Water Resources | March 27, 2022 | Gedo | luuq | Banmudule | 10.0 | IOM | 22/01/2016 | River Juba | — | 3.75823164 | 42.554493 | — | — | 3 | — | rural | no | 5 | Yes | — | 179 | 20 | 53 | 72 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 52 | 0 | 0 | no | — | — | — | — | — | — | — | — | — | — | — | fair | — | yes | Yellow | — | — | — | — | — | Communal | yes | 21-Jul-19 | 4 | 3 | no | — | no | — | — | — | NCA | 18-Jul-19 | Rehabilitation | Rehabilitation | — | — |
7514 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | 2.0 | NUWACO Water Company | 27/03/2019 | Ligle BH 1 | — | 8.3646775 | 48.4496099 | 453.0 | — | 4 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 160.0 | pvc | 8.0 | 11.0 | 40.0 | 24.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | 5000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 22.0 | 60.0 | Generator | Parkins, Iveco | 250.0 | — | — | good | — | yes | Colorless and odorless | 31.8 | 7.6 | 3230.0 | 1613.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7498 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2017 | Jillab BH 1 | — | 8.3921872 | 48.5132857 | 446.0 | — | 10 | — | urban | yes | — | Yes | — | 2100 | — | — | — | — | — | 350.0 | pvc | 8.0 | 120.0 | 8.0 | 8.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2000.0 | 105 | 11 | — | no | — | — | Submersible Pump | Lowara | 15.0 | 216.0 | Solar | — | — | RP300M-72 | 27.0 | good | — | yes | Colorless and odorless | 30.3 | 7.28 | 5730.0 | 2860.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | NUWACO Water Company | 27/03/2017 | 1. Installation of solar power | — | — | — |
7812 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2015 | Agoonta BH | — | 8.4038832 | 48.4710416 | 437.0 | — | 1 | — | urban | yes | — | Yes | — | 150 | — | — | — | — | — | 300.0 | pvc | 8.0 | 80.0 | 12.0 | 8.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 34.0 | PVC | 400.0 | 5 | 5 | 0 | no | — | — | Submersible Pump | Lowara | 15.0 | 210.0 | Hybrid - Solar/Generator | Parkins | 65.0 | PN60-255-STD | 26.7 | good | — | yes | Colorless and odorless | 35.8 | 7.61 | 4270.0 | 2125.0 | — | Private-Public-Partnership | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France