Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1132 | BHMDGK020 | Borehole | Puntland_PWDA | Nov. 13, 2019 | Mudug | Galkacyo | Galkacyo | 0.0 | Kuwait Government | 19-11-15 | GALWA BH7 | — | 6.7963 | 47.4105 | 293.0 | 4.9 | 7 | 1573282288042.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 220.0 | — | — | — | 26.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | Lowara 22kW | — | 150.0 | — | — | — | — | — | — | — | No | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | — | — | — | — | — | — | — | Repair of pump | 2017-11-19 | Solar source power, repair of pump and GI PIPES | — | Strategic Water Sources Survey – WSS_NATl |
1091 | BHMDGD028 | Borehole | Puntland_PWDA | Oct. 31, 2019 | Mudug | Galdogob | Roox | 0.1 | Puntland MoEMW - Ministry of Energy, Minerals and Water | 10-08-15 | Roox BH | — | 7.2052 | 47.4384 | 374.0 | 3 | 1 | 1572433829807.jpg | Rural | Yes | — | Yes | — | — | 12000 | 1000 | 150000 | — | — | 180.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | — | — | 5 | 2 | Yes | 5 | 8.0 | Submersible Pump | Lowara 11kW | — | 150.0 | Generator | LTG184GP | 35.0 | — | — | Good | — | No | — | 28.6 | — | 3000.0 | 1512.0 | — | Communal | — | — | — | — | Yes | 0.03 | Yes | — | — | — | Puntland MoEMW - Ministry of Energy, Minerals and Water | Repair pump and GI PIPES | 2018-04-06 | Solar system and caretaker and generator rooms rehabilitation | — | Strategic Water Sources Survey – WSS_NATl |
1094 | BHMDGD031 | Borehole | Puntland_PSAWEN | Dec. 27, 2013 | Mudug | Galdogob | Bacadweyn | — | IR - Islamic Relief Somalia | 01-06-07 | Bacadwayn Hospital BH | — | 7.1947 | 47.5198 | 365.0 | — | — | — | Urban | — | — | No | — | — | — | — | — | — | — | 180.0 | — | — | 130.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 8.0 | — | 200.0 | — | — | — | — | — | — | — | Grundfos 5.5kW | — | 160.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Public | — | — | — | — | — | — | — | — | — | — | — | — | — | Generator 40kva and Rissor pipes 170m and rehabilitation pipeline | — | Strategic Boreholes Survey – BHS |
1138 | BHMDGK026 | Borehole | Puntland_PSAWEN | Jan. 7, 2014 | Mudug | Galkacyo | Galkacyo | — | Private | 01-06-11 | Galkacyo GALWA BH6 | — | 6.7924 | 47.4138 | 292.0 | — | — | — | Urban | Yes | — | Yes | — | 2400 | — | — | — | — | — | 210.0 | — | — | 50.0 | 60.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20.0 | — | 40000.0 | — | — | — | — | — | — | — | Grundfos 22kW | — | 150.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Public-Private | — | — | — | — | — | 0.03 | — | — | — | — | — | — | — | — | — | Strategic Boreholes Survey – BHS |
5198 | DWWGBE027 | Dug Well | SWALIM_WSIS | June 21, 2008 | Woqooyi Galbeed | Berbera | Xagal | — | — | — | Xagal Dug Well | — | 10.2519 | 45.7372 | 382.0 | — | — | — | — | Yes | — | No | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 8.0 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Develop | — | Water Sources Inventory Survey – WSIS |
1304 | BHMDHO025 | Borehole | SWALIM_GSA | April 1, 2018 | Mudug | Hobyo | Hadile | — | SDRO | 01-01-01 | Ceelguule BH2 | — | 6.0116 | 47.8565 | 133.0 | — | — | — | Rural | No | — | No | Low Yield | — | — | — | — | — | — | 105.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Community | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS |
1152 | BHMDGK037 | Borehole | Puntland_PWDA | Nov. 14, 2019 | Mudug | Galkacyo | Galkacyo | 0.0 | UNICEF - United Nations Children's Fund | 14-11-03 | Galkacyo Hospital GMC | — | 6.7711 | 47.4274 | 289.0 | 4.7 | — | 1573479433305.jpg | Urban | No | — | Abandoned | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | No | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Full rehabilitation. It use GALWO water supply system | — | Strategic Water Sources Survey – WSS_NATl |
1119 | BHMDGK007 | Borehole | Puntland_PWDA | Nov. 17, 2019 | Mudug | Galkacyo | Terrage | 0.3 | Community | 20-11-14 | Terrage BH | — | 6.8594 | 47.3092 | 318.0 | 4.9 | — | 1573455403851.jpg | Rural | Yes | — | Yes | — | — | 5000 | 300 | 60000 | 1.0 | — | 100.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | PVC | 600.0 | 5 | 2 | 2 | Yes | 10 | 6.0 | Submersible Pump | SAH11 | — | 90.0 | Generator | Ltg184g1 | 34.0 | — | — | Good | — | No | — | 26.5 | — | 4150.0 | 2080.0 | — | Private/Individual | — | — | — | — | No | — | Yes | — | — | — | Community | Pump | 2019-10-04 | Solar system elevator tank Water supply system | — | Strategic Water Sources Survey – WSS_NATl |
1121 | BHMDGK009 | Borehole | Puntland_PWDA | Nov. 9, 2019 | Mudug | Galkacyo | Bayra | 0.4 | SC - Save the Children | 05-06-10 | Bayra BH | — | 6.9556 | 47.3199 | 327.0 | 4.7 | 1 | 1572951995699.jpg | Rural | Yes | — | Yes | — | — | 4000 | 50 | 160 | — | — | 185.0 | — | — | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 1000.0 | 30 | 7 | 3 | Yes | 2 | 6.0 | Submersible Pump | Lowara 7.5 | — | 132.0 | Generator | GCO32-11/4 | 50.0 | — | — | Fair | — | No | — | 26.3 | — | 5530.0 | 2760.0 | — | Communal | — | 09-11-11 | 3 | 0 | Yes | 0.03 | Yes | — | — | — | IRC - International Rescue Committee | Repair of generator | 2011-11-09 | Full rehabilitation (pump, GI pipes, generator), solar system installation, water supply to the village | — | Strategic Water Sources Survey – WSS_NATl |
1521 | BHSLCA001 | Borehole | Somaliland_MoWR | Jan. 12, 2014 | Sool | Caynabo | Xood | — | UAERC - United Arab Emirates Red Crescent | 01-03-12 | Xood | — | 9.3504 | 46.1793 | 731.0 | — | — | — | Rural | Yes | — | Yes | — | 200 | 600 | — | 2000 | — | — | 231.0 | — | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20.0 | — | 200.0 | — | — | — | — | — | — | — | — | — | 204.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Public | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Strategic Boreholes Survey – BHS |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France