Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
665 | BHGLCD019 | Borehole | FGS_MoEWR | Sept. 16, 2019 | Galgaduud | Cadaado | Galinsoor | 2.0 | UNICEF - United Nations Children's Fund | 14-04-11 | Galinsoor 2 | — | 6.4257 | 46.701 | 343.0 | 4.3 | 0 | 68613964602.jpg | Rural Urban | Yes | — | Yes | — | — | 800 | 150 | 306000 | 0.1 | — | 196.0 | — | — | 50.0 | 60.0 | 15.0 | 25.0 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 3000.0 | 3000 | 0 | 4 | Yes | 10 | 14.0 | No Pump | — | — | — | — | — | — | — | — | Good | Water tank construction very poor | No | — | 29.5 | 6.98 | 1805.0 | 1780.0 | — | Private-Public-Partnership | — | — | — | — | Yes | 0.1 | Yes | — | — | — | UNICEF - United Nations Children's Fund | — | — | They new tank , they have an old and about colupse | — | Strategic Water Sources Survey – WSS_NATl |
8731 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | — | PSAWEN | 10/03/2008 | Bursalax water company BH 2 | — | 7.1833919 | 47.2283962 | 374.0 | — | 3 | — | — | no | — | Abandoned | — | — | — | — | — | — | — | 196.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Other | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | Not functioning | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | Poor of yield so needs drilling of new borehole | — | — |
1074 | BHMDGD011 | Borehole | Puntland_PSAWEN | Dec. 30, 2013 | Mudug | Galdogob | Bursaalax | — | Community | 01-06-03 | Bursaalax BH2 Kuleejo | — | 7.1848 | 47.2331 | 399.0 | — | — | — | Rural Urban | Yes | — | Yes | — | 1200 | 400 | 80 | 2000 | 2.0 | — | 196.0 | — | — | 150.0 | 8.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 72.0 | — | 2000.0 | — | — | — | — | — | — | — | Lowara 11kW | — | 165.0 | — | — | — | — | — | — | — | — | — | — | 7.5 | 6063.0 | 3030.0 | — | Community | — | — | — | — | — | — | — | 0.2 | — | — | — | — | — | Stanby Generator 40Kva and pump 11Kw and pipes | — | Strategic Boreholes Survey – BHS |
1065 | BHMDGD006 | Borehole | Puntland_PWDA | Nov. 8, 2019 | Mudug | Galdogob | Malable | 1.0 | Community | 09-11-13 | Malable BH | — | 7.0061 | 47.1366 | 372.0 | 4.7 | 1 | — | Rural | Yes | — | Yes | — | — | 3000 | 50 | 70000 | 0.3 | — | 195.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 24.0 | — | — | — | — | — | — | — | — | Submersible Pump | — | — | 148.0 | — | — | — | — | — | — | — | — | — | 38.4 | 7.49 | 2400.0 | 1200.0 | — | Private | — | — | — | — | — | — | — | — | — | — | — | Elevated water tank construction | 2013-01-01 | Rehabilitate | — | Strategic Water Sources Survey – WSS_NATl |
7319 | — | Borehole | Somaliland MoWRD | March 30, 2022 | Awdal | zeylac | Laagta morohda | 0.2 | Somaliland MoWRD | 21/08/2006 | Laanta maroohda | — | 10.8467147 | 43.262019 | 208.0 | — | 0 | — | urban rural | yes | — | Yes | — | 1000 | 8000 | 0 | 20000 | 0.0 | — | 195.0 | pvc | 8.0 | 161.0 | 4.66 | 8.0 | 2.0 | 0.25 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 110.0 | PVC | 1100.0 | 150 | 0 | 0 | yes | 2 | 9.0 | Submersible Pump | Grundfoz | 5.5 | 90.0 | Hybrid - Solar/Generator | — | 55.0 | Vk-300P | 300.0 | poor | Completely have no supply system | no | — | 37.3 | 7.5 | 1440.0 | 1400.0 | — | Communal | no | — | — | — | yes | 0.08 | yes | — | — | — | DRC - Somaliland | 24/06/2019 | Concrete reservoir construction, and installation of new solar panels | This water have no kiosk, animal troughs and any other supply system so they require constraction of new kiosks and animal trouhgs | — | — |
7253 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | WDA | 13/03/1991 | Cagaaran BH 1 | — | 7.0618805 | 47.4853827 | 279.0 | — | 3 | — | rural urban | yes | — | Yes | — | 17500 | 9000 | 100 | 15000 | — | — | 195.0 | pvc | 8.0 | 105.0 | 18.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | Galvanised Steel | 2000.0 | 330 | 7 | 3 | yes | 6 | 8.0 | Submersible Pump | — | 16.0 | 150.0 | Hybrid - Solar/Generator | IM30 | 30.0 | GPS-300-360 | 16.2 | fair | Pipelines rehabilitation | yes | Colorless and odorless | 35.5 | 8.1 | 2543.0 | 1261.0 | — | Communal | yes | 13/03/1990 | 7 | 0 | yes | 0.1 | yes | — | — | — | DRC | 13/02/2021 | 1. Installation of solar power | 1. Rehabilitation of pump and riser pipes. 2. Rehabilitation of pipelines. 3. Extension of pipelines. 4. Rehabilitation and reconstruction of elevated water tank. 5. Construction of new kiosks. 6. Fancing. | — | — |
1831 | BHTGBC067 | Borehole | Somaliland_MoWR | Jan. 3, 2014 | Togdheer | Burco | Muruqmal | — | UNHABITAT - United Nations Human Settlements Programme | 01-01-04 | UNHABITAT BH1 | — | 9.5416 | 45.5286 | 1053.0 | — | — | — | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 195.0 | — | — | 104.0 | 30.0 | 18.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | Grundfos | — | 120.0 | — | — | — | — | — | — | — | — | — | — | 7.2 | 2320.0 | 1540.0 | — | Public | — | — | — | — | — | 0.2 | — | — | — | — | Buroa Water Agency | 2 New generators where installed 350KVA PERKINS | 2010-12-01 | Large Storage Tank,spare borehole generator 45KVA and spare submersible pump | — | Strategic Boreholes Survey – BHS |
1850 | BHTGBC084 | Borehole | Somaliland_MoWRD | Oct. 12, 2019 | Togdheer | Burco | Burco | 0.0 | Community | 12-10-07 | Indha dero borehole | — | 9.5358 | 45.5425 | 1041.0 | 4.9 | — | 1570867510198.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 195.0 | PVC | 8.0 | 153.0 | 16.0 | 24.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 6.0 | 1500 | 0 | 0 | No | — | — | Submersible Pump | Grundfos | 16.0 | 190.0 | Generator | Perkins | 45.0 | — | — | — | — | No | — | 29.6 | 8.01 | 3076.0 | 1880.0 | — | Private/Individual | — | — | — | — | No | — | No | — | — | — | — | — | — | Pipe and the pump, sanitation staff training | — | Strategic Water Sources Survey – WSS_NATl |
8312 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | galkayo | Najax IDP Galkacayo | — | Xisbulislaam | 07/03/2017 | Wadajir BH | — | 6.8134989 | 47.3897698 | 258.0 | — | 1 | — | urban | yes | — | Yes | — | 4550 | — | — | — | — | — | 195.0 | pvc | 8.0 | — | 4.0 | 12.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 5.0 | Galvanised Steel | 750.0 | 10 | 3 | 0 | no | — | — | Submersible Pump | — | — | 145.0 | Hybrid - Solar/Generator | — | 30.0 | SGY15KH | 15.0 | poor | Needs construction of new animal thoughts | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | Agency not specified | 07/03/2017 | 1. Installation of solar power | 1. Construction of new elevated tank 2. Rehabilitation of kiosks and 3.construction of new kiosks. | — | — |
648 | BHGLCD003 | Borehole | SWALIM_GSA | Jan. 30, 2016 | Galgaduud | Cadaado | Adaado | — | GTZ - German Agency for Technical Assistance | 30-01-86 | Wakaalada BH | — | 6.1419 | 46.6285 | 309.0 | — | — | — | Urban | Yes | — | Yes | — | 1800 | — | — | — | — | Yes | 195.0 | — | — | 40.0 | 20.0 | 24.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 62.0 | — | — | — | — | — | — | — | — | No Pump | — | — | 92.0 | — | — | — | — | — | — | — | — | — | 35.0 | 7.1 | 3820.0 | 1910.0 | — | Community | — | — | — | 3 | — | — | — | — | — | — | GSA - General Service Agency | Full rehabilitation | 2018-01-01 | Improve | Water tank construction, pump, wind power and water supply extension | Strategic Water Sources Survey in Galmudug State – WSS_GM |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France