Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
662 BHGLCD016 Borehole FGS_MoEWR Sept. 14, 2019 Galgaduud Cadaado Bakiin cadaado 1.0 Community 14-02-14 Farjano cadaado 6.13801 46.64638 310.0 3.2 1 68465456722.jpg Urban Yes Yes 181.0 73.0 20.0 12.0 2.0 Concrete/Masonry tank 174.0 PVC 1100.0 10166 6 0 Yes 15 18.0 No Pump Good 1. They need Solar system No 33.0 6.79 3328.0 2660.0 Private/Individual Yes 0.014 No CPD Motor change 2017-03-15 Construction Water tank Strategic Water Sources Survey – WSS_NATl
1347 BHMDHO062 Borehole Puntland_PWDA Nov. 25, 2019 Mudug Hobyo Towfiiq BH1 0.5 SSF - Somali Stability Fund 11-07-16 Towfiiq BH1 6.6138 48.8711 31.0 4.7 1 1573802571961.jpg Rural Yes Yes 1000 20000 80.0 10.0 Concrete/Masonry tank 35.0 PVC 1500.0 20 6 2 Yes 7 8.0 Submersible Pump Lowara 11 66.0 Hybrid - Solar/Generator Jp45 45.0 Good No 31.6 6790.0 3400.0 Communal 23-03-19 2 Yes 0.03 Yes CARE Somalia Generator room 2019-03-23 Full rehabilitation Fencing Strategic Water Sources Survey – WSS_NATl
123 BHAWZE010 Borehole Somaliland_MoWRD Dec. 6, 2019 Awdal Zeylac Toqoshi 18.0 IFAD - International Fund for Agricultural Development 07-12-14 Quudabh 11.3257 43.3771 17.0 4.9 1 1575615651103.jpg Rural Urban Yes Yes 3000 5000 40.0 GI 10.0 24.0 11.0 12.0 Concrete/Masonry tank 24.0 PVC 11000.0 175 6 2 No Poor Pipeline leaks No 36.8 7.4 2660.0 1300.0 Utility/Local Authority Yes 0.5 No Replacement casing and Resing pipe Strategic Water Sources Survey – WSS_NATl
7250 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug galkayo Roox Community 12/03/2016 Roox BH 7.2052439 47.4384682 341.0 2 rural urban yes Yes 4200 1500 2500 180.0 pvc 8.0 13.3 15.0 3.0 Concrete/Masonry tank 20.0 Galvanised Steel 1300.0 30 6 2 yes 2 8.0 Submersible Pump Lowara 11.0 150.0 Hybrid - Solar/Generator Doss 30.0 19.6 fair yes Colorless and odorless 34.5 7.61 2350.0 1171.0 Communal yes 12/03/2016 5 2 yes 0.05 yes NRC 12/03/2020 1. Installation of solar power. 2. Rehabilitation of pump. 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room.
7223 Borehole Puntland Ministry of Energy Minerals and Water Feb. 26, 2022 Mudug jariban Godobjiiran BH 1 0.0 Chinese Government 26/02/1986 Godobjiraan BH 1 7.5139859 49.4103095 123.0 2 rural urban yes Yes 28000 1500 10000 0.0 210.0 gi 6.0 20.0 10.0 1.5 Concrete/Masonry tank 36.0 Galvanised Steel 180.0 4000 6 3 yes 4 24.0 Submersible Pump Gran fos 11.0 150.0 Hybrid - Solar/Generator Parkins 45.0 SZYL_P300_36 15.0 fair Needs rehabilitation yes Colorless and odorless 31.6 7.7 2800.0 1876.0 Communal yes 26/02/1986 4 1 yes 0.15 yes KAALO Relief and Development 26/02/2017 Rehabilitation of elevated water tank 1. Drilling new borehole. 2.fancing borehole areas. 3. Rehabilitation of generators and caretaker rooms. 4. Needs to help fuel. 5. Construction of new kiosks. 6. Rehabilitation of kiosks. 7. Rehabilitation of animal thoughts.
2048 BHWGGE009 Borehole Somaliland_MoWRD Sept. 24, 2019 Woqooyi Galbeed Gebiley Botor 24.0 24-09-13 Wajaale2 9.6966 43.5203 1530.0 4.9 2 1569324393150.jpg Urban Yes Yes 210.0 GI 8.0 190.0 30.0 17.0 Concrete/Masonry tank 500.0 PVC 18.0 200 6 Yes 50 7.0 Good No 27.8 7.31 1330.0 670.0 Utility/Local Authority Yes Strategic Water Sources Survey – WSS_NATl
7988 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Tukaraq 0.0 Unknown by the operator 07/04/2022 Tukarq borehole 1 8.5386496 47.7905187 561.0 2 rural urban yes Yes 23000 0 0 0 0.0 30.0 pvc 8.0 24.0 18.0 11.0 0.0 0.0 Concrete/Masonry tank 80.0 Galvanised Steel 1.0 4000 6 0 yes 5 45.0 Submersible Pump Grounfunds 7.5 24.0 Solar Photovoltiac monocrystilline 360.0 good Several pipelines are connected to the households from the borehole no 32.0 6.9 1840.0 1200.0 Communal yes 07/04/2020 3 0 no no ACTED 01/01/2021 Wall fence construction and tank pipeline increased and change pump Pipelines are damaged specially the lowest once in the borehole. Animal troughs and Bury the pipes from borehole tob entire toen
1556 BHSLLA014 Borehole Somaliland_MoWRD Oct. 20, 2019 Sool Laas Caanood Gambadhe 1.0 Somaliland MoWRD - Ministry of Water Resources Development 20-10-16 Gambadhe BH1 8.5714 47.5967 571.0 3.2 0 1571567197448.jpg Urban Yes Yes 65.0 PVC 8.0 6.0 25.0 4.0 Concrete/Masonry tank 50.0 Galvanised Steel 15.0 0 6 7 Yes 4 8.0 Submersible Pump Grundfos 11.0 60.0 Hybrid - Solar/Generator Perkins/Photovoltaic 30.0 Photovaltaic 0.25 Good No 31.0 7.9 1961.0 1350.0 Communal 20-09-16 5 2 No No HAVOYOCO - Hargeisa Voluntary Youth Committee #NAME? 2019-10-15 Strategic Water Sources Survey – WSS_NATl
7822 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Samokaab 3.0 IR 14/04/2018 Samokaab borehole 8.6757978 47.0947488 636.0 1 urban rural yes Yes 3500 600 0 1460 0.0 158.0 pvc 8.0 96.0 20.0 10.0 0.0 0.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 300 6 3 yes 30 9.0 Submersible Pump Luwara 11.0 90.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 300.0 good Pipelines line problem exists no 29.0 7.5 4000.0 300.0 Communal yes 14/04/2018 4 2 no no ACTED 12/11/2021 Installed solar system and constructed two kiosk 500m pipelines require change due pipe weakness
7201 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Timirshe 0.15 Community_ 21/05/2000 Timirshe borehole 2 10.5613413 50.4252462 270.0 2 rural urban yes Yes 480 200 400 84.0 pvc 8.0 40.0 3.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 20 6 3 yes 3 6.0 Submersible Pump Lowara 63.0 Solar fair Yield is low. no 31.0 7.7 1732.0 860.0 Communal yes 21/07/2015 4 3 yes 0.03 yes CARE Somalia 01/02/2022 Replacement of main raising pipes and submersible pump 1: Generator 2: Rehabilitation of solar power system.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors