Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8178 | — | Dug Well | Somaliland MoWRD | April 14, 2022 | Woqooyi Galbeed | hargeisa | Geedka dheenta village | 2.0 | UNICEF | 12/06/2015 | Geedka dheenta dug well | — | 9.7362084 | 44.4094061 | 1069.0 | — | 15 | — | urban rural | yes | — | No | 4 months becouse of the pump | 14000 | 500 | 0 | 10000 | 30.0 | — | — | — | — | — | — | — | — | — | 10.0 | 4.0 | 20.0 | 5.0 | 1.0 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 1500.0 | 2000 | 2 | 0 | yes | 4 | 9.0 | Submersible Pump | Unknown | 40.0 | 0.0 | Solar | — | — | Bp solar | 1.6 | poor | The supply system was good before 4 months but after pump failure the supply condition become poor. | yes | Whiteness | 28.0 | 7.5 | 610.0 | 475.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | Pump replacement | — | — |
1431 | BHNGBU013 | Borehole | Puntland_PWDA | Oct. 24, 2019 | Nugaal | Burtinle | Jalam | 5.0 | IR - Islamic Relief Somalia | 07-09-16 | Jalam Bh | — | 7.8376 | 48.0108 | 617.0 | 4.9 | 1 | 1572161827813.jpg | Rural | Yes | — | No | 4 months ago, because of pump broken | — | 6000 | 1000 | 20000 | — | — | 400.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 300.0 | — | 1 | 2 | Yes | 10 | 6.0 | Submersible Pump | Lowara 15.5kVA | — | 360.0 | Hybrid - Solar/Generator | Perkins JP69 | 45.0 | — | 28.0 | Good | Repair GI pipe, kiosks. | No | — | — | — | — | — | — | Communal | — | 28-10-16 | 10 | 0 | No | — | Yes | — | — | — | — | GI Pipe repair | 2018-06-28 | Submersible Pump 15.5 KW and raised pipes | — | Strategic Water Sources Survey – WSS_NATl |
8495 | — | Dam | FGS Ministry of Energy and Water Resources | June 10, 2022 | Gedo | belet_xaawo | Arabo | 2.0 | Community | 01/01/2013 | Arabo dam | — | 3.9522045 | 41.9263609 | 191.0 | — | 2 | — | rural | no | 2 | No | 3 years because of lack of adequate rain | 2010 | 50 | 124 | 3148 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 100.0 | 50.0 | — | — | — | — | — | — | — | — | Other | 10.0 | — | 0.0 | 350 | 0 | 0 | no | — | — | — | — | — | — | — | — | — | — | — | good | — | no | — | — | — | — | — | — | Communal | yes | 1-Jan-13 | 4 | 2 | no | — | no | — | — | — | Community | 5-Mar-17 | Just human digging | Digging | — | — |
8561 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 21, 2022 | Middle Shabelle | jowhar | Baareey | 0.0 | PAH | 21/07/2019 | Baareey | — | 2.8217044 | 45.5353323 | 128.0 | — | 12 | — | rural | yes | — | No | 3 months ago it become dry | 2860 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 7.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 98 | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | Its not working | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | no | — | no | — | — | — | IMC | 21-Jun-20 | Rehabilitation | Deepening and installation of Solar system | — | — |
8607 | — | Dam | FGS Ministry of Energy and Water Resources | March 21, 2022 | Gedo | cel_waq | Qubawana | 10.0 | CARE Somalia | 21/03/2022 | Qubawana dum | — | 2.830119 | 41.004279 | 116.0 | — | 1 | — | rural | no | 12 | No | 3 months ago due to the Drought | 2000 | 125 | 2855 | 25485 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 100.0 | 100.0 | — | — | — | — | — | — | — | — | Other | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ADESO | 21-Mar-22 | Rehabilitation of the dam | To expand the dam and make water havesting | — | — |
1627 | BHSNCR004 | Borehole | Somaliland_MoWRD | Oct. 17, 2019 | Sanaag | Ceerigaabo | Lanqaciye | 4.0 | Uk | 12-10-56 | Lanqaciye one | — | 10.661 | 47.2979 | 1931.0 | 4.3 | 0 | 1571318405262.jpg | Rural | No | 8 | No | 2month ago broking .the pump is stop and generator is not functiojing also risen pipe | — | 150 | 500 | 1500 | 15.0 | — | 105.0 | GI | 6.0 | 28.0 | 5.0 | 5.0 | 24.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 400.0 | — | 2 | 4 | No | — | — | Submersible Pump | Grundfos | 12.0 | 102.0 | Generator | Perkins | 45.0 | — | — | Poor | Generator fair and pump stop | No | — | — | — | — | — | — | Communal | — | 13-07-93 | 5 | 2 | Yes | 0.05 | Yes | — | — | — | CARE Somalia | Construction of water tank and one generator room | 2018-04-07 | New Pump 7.5kw generator 45kva and solar system also replaced risen pipe or New borehole | — | Strategic Water Sources Survey – WSS_NATl |
8673 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Bari | qardho | Yakayaka | 3.0 | UNICEF | 28/12/2021 | Yakayaka borehole | — | 9.2174467 | 49.1000864 | 720.0 | — | 1 | — | — | yes | — | No | 29/Dec/2021 New borehole No accessories such as storage tank, pipe lines, animal troughs. | — | — | — | — | — | — | 400.0 | pvc | 8.0 | 168.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | The piplines are Not yet installed Water tank is still under construction | yes | Yellowish color and there is odor that smells like rotten egg. | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | 1. The to be investigated and determined if its suitable for human consumption. | — | — |
7101 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Mindhicir | 3.0 | SHF | 01/01/2019 | Mindhicir Borehole | — | 10.1218743 | 48.4115493 | 1058.0 | — | 1 | — | rural urban | yes | — | No | 28 March 2022 Submersible pump has stopped functioning | 3600 | 2000 | — | 4000 | — | — | 352.0 | pvc | 8.0 | 160.0 | 5.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 1400.0 | — | 2 | 3 | no | — | — | Submersible Pump | — | — | 300.0 | Generator | Perkins | 45.0 | — | — | poor | Submersible pump need replacement Elevated water tank can't supply the settlement The solar is not functioning and needs a repair. | no | — | — | — | — | — | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | Somaliland MoWRD | 01/07/2021 | Replacement of submersible pump | 1.Argent Replacement of submersible pump 2.Solar-power system improvement 3.Another elevated water tank that provides the settlement, more troughs& Kiosks. 4.construction of a care taker room and a storage room 6.development of small farm that provides for the caretaker in order to benefit it from. N.B At this hard time people can't afford to buy the water so both the animals and the people drink for free. | — | — |
7407 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Bari | bossaso | Qaw | 4.0 | Red Crescent Society for United Arab Emirates | 03/01/2014 | Qaw Borehole 2 | — | 11.2090933 | 48.9855167 | 1.0 | — | 2 | — | urban | yes | — | No | 27/02/2022 Due to the increased fuel prices | 420 | — | — | — | — | — | 68.0 | pvc | 8.0 | — | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Stainless Steel | 4000.0 | 80 | — | — | no | — | — | Submersible Pump | Lowara | — | 60.0 | Generator | Perkins | 30.0 | — | — | poor | Distribution pipes are rusted. | no | — | 34.0 | 7.8 | 1580.0 | 790.0 | — | Communal | yes | 03/01/2013 | 4 | 3 | yes | 0.2 | — | — | — | — | CARE Somalia | 01/03/2021 | 1.Rehabilitation of the Generator rooms 2.Generator, cable, submersible 3.GI Pipes 4.Access Road construction 5.Construction of elevated tank, | 1: Solar 2: Rehabilitation of water supply pipes 3: Replacement of main raising pipes and submersible pump 4: Caretaker room | — | — |
7166 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Qodax | 1.5 | Community_ | 27/02/2020 | Qodax borehole | — | 9.6397862 | 49.8325483 | 560.0 | — | 1 | — | rural urban | yes | — | No | 25/12/2021 The pump doesn't work | 2100 | 1500 | — | 5000 | — | — | 320.0 | pvc | 8.0 | 202.0 | 13.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 6.0 | Galvanised Steel | 1000.0 | — | 4 | 2 | yes | 15 | 6.0 | Submersible Pump | Lowara | — | 300.0 | Hybrid - Solar/Generator | Perkins | 45.0 | JCNS-M36V390W | 23.4 | good | — | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | yes | — | — | — | KAALO Relief and Development | 27/04/2021 | Provision of generator Construction of animal troughs Construction of Solar power installation Construction of kiosks Distribution of water into the village Construction of ground tank which gives water into the village | Construction of elevated water tank Replacement of pump Replacement of main raising pipes Electric cable which connect to the generator and pump Construction of animal troughs Construction of extra solar power installation Construction of toilet and caretaker hause. Cleaning of the solar. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France