Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7156 Borehole Somaliland MoWRD March 31, 2022 Togdheer buuhoodle Qabri Hulul 0.2 IR 01/01/2016 Qabri Hull borehole 8.685275 46.2782063 832.0 1 rural yes Yes 2400 400 0 2800 0.0 333.0 pvc 8.0 270.0 15.0 2.0 Concrete/Masonry tank 40.0 Galvanised Steel 25.0 400 1 8 yes 4 8.0 Submersible Pump Luara 15.0 300.0 Hybrid - Solar/Generator JP45 45.0 GPM300 300.0 good The condition of the solar system and has spare parts no 36.0 7.3 1000.0 394.0 Communal no no yes IR 01/02/2016 Construction of new borehole Rehabilitation of reservoirs and animal trough installation
7130 Borehole Puntland Ministry of Energy Minerals and Water March 31, 2022 Togdheer buuhoodle Dandan 0.0 ADESO Dardan BH 8.2514136 46.5295534 653.0 1 urban rural yes Yes 4200 1500 500 5000 0.0 370.0 pvc 8.0 12.0 12.0 3.0 Concrete/Masonry tank 96.0 PVC 3000.0 30 4 5 yes 15 8.0 Submersible Pump Lowara 15.0 280.0 Hybrid - Solar/Generator Parkins 45.0 SZYL-M330-36 23.1 good yes Colorless and odorless 31.5 7.4 3550.0 2130.0 Communal yes 31/03/2018 3 2 yes 0.05 yes CARE Somalia 31/03/2021 1. Installation of submersible pump 15 kW and cables 2. Installation of riser pipes 3. Construction of elevated water tank 4. Rehabilitation of shoat troughts and water koisk. 5. Rehabilitation of pipelines system. 6. Supply and installation of solar inverter.
8124 Borehole Somaliland MoWRD March 31, 2022 Sool caynabo Canabo3 8.0 Somaliland MoWRD 11/02/2022 Cannabo3 9.0144131 46.3876899 787.0 2 rural urban yes Yes 50000 10000 0 20000 0.0 180.0 pvc 8.0 70.0 6.0 5.0 130.0 2.0 Other Galvanised Steel 150.0 50000 0 0 yes 5 40.0 Submersible Pump Shared with other canabo2 borehole 6.0 70.0 Generator Same as the canabo borehole2 60.0 good The borehole is under construction no 36.0 7.9 1058.0 740.0 Communal no no no UNICEF 01/03/2022 Construction of new borehole Construction of kiosks animal troughs and Construction of machine room and borehole caretaker room and fence
7763 Borehole Galmudug Ministry of Energy and Water Resources March 31, 2022 Galgaduud cabudwaaq 1 luuliyo 3.0 community 17/03/1977 Roob da ay 6.2470517 46.2194633 388.0 1 urban rural yes Yes 3000 150 34000 120.0 pvc 8.0 40.0 20.0 Concrete/Masonry tank 40.0 Galvanised Steel 68.0 1800 5 2 yes 4 10.0 Submersible Pump franglin 96.0 Hybrid - Solar/Generator perkin 32.0 300 16.0 poor 1. small water tank 2. small pipelines no Communal yes 3 2 yes 0.0015 pump and pipes
8125 Borehole Somaliland MoWRD March 31, 2022 Sool caynabo Caynabo 8.0 Somaliland MoWRD 01/03/2022 Caynab borehole2 9.0172064 46.3884904 798.0 2 rural urban yes Yes 50000 10000 0 20000 0.0 200.0 pvc 8.0 160.0 7.0 8.0 180.0 2.0 Concrete/Masonry tank 25.0 Galvanised Steel 150.0 5000 1 0 yes 5 8.0 Submersible Pump Laura 5.0 90.0 Generator NEF45SM1A.S500 Italy 60.0 good The supply system is under construction no 36.0 7.9 1057.0 740.0 Communal no no no UNICEF 01/03/2022 Construction of new borehole and Construction of Water reservoir and installation of pipelines Solar system and construction of caretaker room
7311 Dug Well FGS Ministry of Energy and Water Resources March 31, 2022 Lower Shabelle wanla_weyn Islaamoole 1.0 Private 17/02/2020 Daaru Salaam Water supply 2.5359568 44.8462623 -53.0 0 urban yes Yes 3000 78.0 6.0 60.0 12.0 2.0 0.2 Plastic tank 12.0 PVC 500.0 1000 1 2 yes 20 3.0 Submersible Pump Chinese 1.0 2.0 Generator Gancava 125 20.0 good It works good yes Good 0.0 Private/Individual yes 0.01 yes Private 29-Mar-22 Maintaining the well Solar system, generator, pumps, pipeline and reservoir and kiosks and one room for the generator
7343 Borehole Puntland Ministry of Energy Minerals and Water March 31, 2022 Sool las_caanood Karin korfood 0.7 ISRC 31/03/2012 Karinkarfood BH 8.1271024 47.7510983 698.0 1 urban rural yes Yes 6300 1200 500 13000 0.0 290.0 pvc 8.0 4.0 12.0 8.0 Concrete/Masonry tank 50.0 Galvanised Steel 1000.0 15 2 3 yes 30 8.0 Submersible Pump Lowara 7.5 260.0 Hybrid - Solar/Generator Parkins 60.0 300w 18.0 fair yes Colorless and odorless 27.8 7.5 4850.0 2423.0 Communal yes 31/03/2014 6 3 yes 0.1 yes Drilling new borehole during to trucking much. 1. Rehabilitation of solar panels 2. Rehabilitation of animal troughts 3. Trucking point. 4. Construction of new elevated tank. 5. Rehabilitation of generator and caretaker rooms 7. Pipelines rehabilitation. 7. Fancing of borehole
7728 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Lower Shabelle afgooye Waanjeele 3.0 Private 13/01/1998 AL NAJAX WATER SUPPLY 2.1514949 45.1228462 41.0 5 rural yes Yes 3500 0 0 0 1.0 20.0 6.0 10.0 19.0 2.0 1.0 Concrete/Masonry tank 36.0 PVC 1200.0 700 3 0 yes 2 10.0 Submersible Pump 4.5 KW 10.0 2.0 Generator Gancava China 125 25.0 poor In January, February, March and first 15 days of April there is a gab for our supply system yes Good 0.0 Communal yes 19-Nov-10 4 2 yes 0.01 no Zam zam foundation 18-Mar-08 Provision of new dug well, distribution of Chlorine Provision of two borehole , rehabilitation of reservior, provide of solar system, distribution of pipeline, provide pump and sumersible. Distribution of chlorine while january, february, march and april
7054 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Hiraan bulo_barde Dab iyo dhagax 3.0 Community 28/12/2014 Dab iyo dhagax water supply 3.8705912 45.566829 92.0 2 rural yes Yes 8000 200 100 300 0.0 10.0 5.0 10.0 12.0 2.0 1.0 Concrete/Masonry tank 31.0 PVC 2500.0 1115 1 2 no Submersible Pump Comoco Submersible pump 7.5 10.0 Generator Eveka 30.0 good This dug well is ok no Private/Individual yes 0.15 yes Community 26-Dec-15 Solar system Elevator water tanker
7729 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Lower Shabelle afgooye Damaleey 1.0 Private 29/11/2004 Towfiiq water supply 2.1418269 45.1153118 63.0 2 rural yes Yes 1600 0 0 0 0.0 22.0 2.0 2.0 24.0 2.0 2.0 Plastic tank 7.0 PVC 1000.0 400 1 0 no Submersible Pump 2.5 Italian 2.5 1.0 Electricity Grid poor After starting the work every thing was going good but after 2 years there was poor supply system yes Good 0.0 Private/Individual yes 0.01 no Private 18-Feb-22 Remove the soil from the well and replace the old pipeline Increase the depth of the well, rehabilitation of old well and increase the 3 Wells, provide additional pipeline, receive generator or solar system

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors