Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7155 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 0.0 | Community | 01/04/2012 | Farah Bulley BH 2 | — | 8.2213759 | 46.3526494 | 631.0 | — | 2 | — | urban rural | yes | — | Yes | — | 2100 | 2000 | 250 | 5200 | 0.0 | — | 374.0 | pvc | 8.0 | — | 8.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 4500.0 | 220 | 8 | 3 | yes | 12 | 8.0 | Submersible Pump | Lowara | 18.5 | 330.0 | Hybrid - Solar/Generator | Parkins | 65.0 | SZYL-M330-36 | 23.1 | fair | — | yes | Colorless and odorless | 32.6 | 8.15 | 3980.0 | 2388.0 | — | Communal | yes | 01/04/2012 | 3 | 2 | yes | 0.1 | yes | — | — | — | PWDA | 01/01/2022 | 1. Rehabilitation of pump | 1. Installation of submersible pump 22 kW and cables 2. Rehabilitation of riser pipes 3. Extension pipelines 4. Extension and installation extra solar power. 5. Construction of generator room 6. Fancing | — | — |
7903 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Sool | las_caanood | Yeyle | — | British Protectorate | 05/04/1954 | Eyle shalow well | — | 8.6968279 | 46.6145572 | 764.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3500 | 1200 | 400 | 1800 | 0.0 | — | 15.0 | other | — | 4.0 | 6.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 1500.0 | 80 | 6 | 2 | yes | 10 | 8.0 | No Pump | — | — | — | — | — | — | — | — | fair | — | yes | This dug well is open well, easily contaminated, colorness and has some smell, needed water quality testing | 29.7 | 7.6 | 2540.0 | 1524.0 | — | Communal | yes | — | 4 | 2 | no | — | no | — | — | — | — | — | — | 1. Water quality testing 2. Full rehabilitation | — | — |
7289 | — | Borehole | FGS Ministry of Energy and Water Resources | April 1, 2022 | Lower Shabelle | wanla_weyn | Cagaboorey | 3.0 | Private | 01/04/2021 | Cagboorey well | — | 2.6273617 | 44.8847067 | 98.0 | — | 1 | — | urban rural | yes | — | Yes | — | 200 | 60 | 70 | 100 | 0.0 | — | 69.0 | pvc | — | 13.0 | 10.0 | 6.0 | 13.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 10.0 | PVC | 100.0 | 100 | 0 | 1 | yes | 3 | 10.0 | Submersible Pump | Italy | 5.0 | 2.0 | Generator | Jengafire | 20.0 | — | — | good | — | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.001 | yes | — | — | — | Private | 1-Apr-21 | Remove soil, mantance tank water | New solar, new generator, new pump and building tank water. | — | — |
8457 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Horufadhi | — | ICRC | 01/04/2019 | Horufadhi BH | — | 8.5796919 | 46.4102163 | 804.0 | — | 1 | — | urban rural | yes | — | Abandoned | Needed deeply observation about the borehole problem | — | — | — | — | — | — | — | pvc | 8.0 | — | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 1200.0 | — | 4 | 4 | no | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole 2. Deeply observation of borehole problem 3. Pipelines rehabilitation | — | — |
7288 | — | Borehole | FGS Ministry of Energy and Water Resources | April 1, 2022 | Lower Shabelle | wanla_weyn | Nasteexo | 1.0 | Private | 01/04/2016 | Tawakal | — | 2.6068924 | 44.8969806 | 74.0 | — | 0 | — | urban | yes | — | Yes | — | 300 | — | — | — | — | — | 158.0 | pvc | 10.0 | 70.0 | 5.0 | 6.0 | 3.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 15.0 | PVC | 1500.0 | 300 | 2 | 150 | yes | 2 | 10.0 | Submersible Pump | Germany | 5.0 | 3.0 | Generator | Doss | 25.0 | — | — | good | We provide four displacement kaam without money | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.01 | yes | — | — | — | SOYVGA | 1-Apr-21 | Solar | New pump and new generator and building tank | — | — |
7313 | — | Borehole | FGS Ministry of Energy and Water Resources | April 1, 2022 | Lower Shabelle | wanla_weyn | Towfiiq | 1.0 | Private | 01/01/2011 | Towfiiq | — | 2.6080125 | 44.881132 | 78.0 | — | 1 | — | urban | yes | — | Yes | — | 300 | — | — | — | — | — | 156.0 | pvc | 5.0 | 70.0 | 10.0 | 5.0 | 3.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 2000.0 | 400 | 2 | 3 | yes | 2 | 5.0 | Submersible Pump | Germany | 3.0 | 3.0 | Generator | Jengafire | 20.0 | — | — | good | Good but there are some difficulties during supply syste such as the generator is a small generator. No good tank. | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.01 | yes | — | — | — | Private | 1-Apr-21 | Maintenance tank water and generator. | New solar, new generator new tank water. | — | — |
8125 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Sool | caynabo | Caynabo | 8.0 | Somaliland MoWRD | 01/03/2022 | Caynab borehole2 | — | 9.0172064 | 46.3884904 | 798.0 | — | 2 | — | rural urban | yes | — | Yes | — | 50000 | 10000 | 0 | 20000 | 0.0 | — | 200.0 | pvc | 8.0 | 160.0 | 7.0 | 8.0 | 180.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 150.0 | 5000 | 1 | 0 | yes | 5 | 8.0 | Submersible Pump | Laura | 5.0 | 90.0 | Generator | NEF45SM1A.S500 Italy | 60.0 | — | — | good | The supply system is under construction | no | — | 36.0 | 7.9 | 1057.0 | 740.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | UNICEF | 01/03/2022 | Construction of new borehole and Construction of Water reservoir and installation of pipelines | Solar system and construction of caretaker room | — | — |
7362 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 31, 2022 | Lower Juba | kismayo | Dalhiska | 12.0 | Private | 04/12/2020 | Dalhiska | — | -0.3401867 | 42.5689301 | -28.0 | — | — | — | rural urban | yes | — | Yes | — | 35200 | 650 | 400 | 2500 | 0.0 | — | — | — | — | — | — | — | — | — | 16.0 | 4.0 | 2.0 | 12.0 | 12.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 4200 | 0 | 0 | yes | 2 | 10.0 | No Pump | — | — | — | — | — | — | — | — | good | Shading and long pipes | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 5 | no | — | — | — | — | 27-Mar-22 | Shading and more pipes | Pipe, big shade , | — | — |
8124 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Sool | caynabo | Canabo3 | 8.0 | Somaliland MoWRD | 11/02/2022 | Cannabo3 | — | 9.0144131 | 46.3876899 | 787.0 | — | 2 | — | rural urban | yes | — | Yes | — | 50000 | 10000 | 0 | 20000 | 0.0 | — | 180.0 | pvc | 8.0 | 70.0 | 6.0 | 5.0 | 130.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | 150.0 | 50000 | 0 | 0 | yes | 5 | 40.0 | Submersible Pump | Shared with other canabo2 borehole | 6.0 | 70.0 | Generator | Same as the canabo borehole2 | 60.0 | — | — | good | The borehole is under construction | no | — | 36.0 | 7.9 | 1058.0 | 740.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | UNICEF | 01/03/2022 | Construction of new borehole | Construction of kiosks animal troughs and Construction of machine room and borehole caretaker room and fence | — | — |
7073 | — | Berkad | FGS Ministry of Energy and Water Resources | March 31, 2022 | Lower Juba | kismayo | Juba water Supply | 10.0 | Private | 31/03/2020 | Juba water supply | — | -0.3845852 | 42.4929913 | -25.0 | — | 11 | — | rural urban | yes | — | Yes | — | — | 5000 | 8000 | 12000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 15.0 | 7.0 | — | — | — | — | — | Steel tank | 2.5 | PVC | 3000.0 | 12500 | 15 | 0 | yes | 10 | — | No Pump | — | — | — | — | — | — | — | — | good | Barkaad sources most populatiin in kismayo, and most of the houses in the kismayo town has tap water.and families uses for drinking water, washing and cooking | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | Private | — | Continue rehabilitation | Repairing continues lying pipeline systems | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France