Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7519 Borehole Somaliland MoWRD March 29, 2022 Awdal zeylac Zaylac borehole 12.0 International Fund for Agricultural Development 15/09/2013 Zeylac borehole 11.32589 43.37519 urban rural yes Yes 10000 2500 0 10000 0.0 39.0 pvc 8.0 13.0 5.0 20.0 0.0 0.0 Concrete/Masonry tank 104.0 Other 1400.0 220 4 3 yes 4 9.0 Submersible Pump Granfoz 3.7 29.0 Hybrid - Solar/Generator Perkins 40.0 S10 spp 5250.0 fair The water supply system operates whole the year around starting from the espalishment up to now. no 37.2 7.5 2800.0 1960.0 Private/Individual yes 0.05 no Safe the childreen international (SCI) 29/03/2022 Contruction of rcc tank, and generator room. Provision of 11 KW submersible pump, and replacement of solar panels.
8008 Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Coodanle 1.0 Somaliland MoWRD 14/11/2017 Coodanle borehole 8.33505537360907 46.042332071811 675.0 1 urban rural yes Yes 12000 6000 0 45000 0.0 350.0 pvc 8.0 32.0 8.0 5.0 Concrete/Masonry tank 36.0 PVC 1500.0 2000 9 6 no Submersible Pump Laura 15.0 327.0 Generator JP45 45.0 good The supply system is good and functioning no 36.0 7.0 1666.0 1100.0 Communal yes 24/11/2017 4 2 no no CARE Somalia 10/03/2021 Borehole rehabilitation Currently the generators needs to be changed and also rehabilitation of the solar system is needed.
7061 Dug Well FGS Ministry of Energy and Water Resources March 29, 2022 Hiraan bulo_barde Idhaceel buulo burte 1.0 Community 27/11/2015 Kuloow water supply 3.8573186 45.5667647 108.0 2 urban yes Yes 10500 19.0 10.0 10.0 12.0 5.0 1.0 Concrete/Masonry tank 35.0 PVC 3000.0 1500 1 1 no Hand Pump Dynamos 8.0 good They need solar system no Private/Individual yes 0.1 yes Community 30-Mar-21 Generator Solar and rehabilitation
7116 Dug Well FGS Ministry of Energy and Water Resources March 29, 2022 Lower Shabelle afgooye Taraafiko 2.0 Mercy USA 29/03/2022 Nuunow water supply 2.1435173 45.1252383 58.0 4 rural yes Yes 150 0 400 300 15.0 19.0 4.0 4.0 6.0 2.0 2.0 Steel tank 6.0 PVC 2000.0 150 0 1 yes 10 5.0 Submersible Pump Italy 10.0 3.0 Generator Gancava 150 100.0 good Irrigation land yes Good 0.0 Communal yes 29-Jan-18 5 2 no yes Private 29-Mar-20 Maintain the water tank Increase the depth of the well, new generator , new water tank, water kiosks and provision of water supply system
7453 Dug Well FGS Ministry of Energy and Water Resources March 29, 2022 Lower Shabelle afgooye Waanjeele 2.0 Private 29/03/2006 Alxkima water supply 2.1500983 45.1204953 54.0 3 rural yes Yes 2700 0 0 0 3.0 25.0 8.0 32.0 24.0 4.0 4.0 Concrete/Masonry tank 1.8 PVC 3.0 450 1 0 no Submersible Pump 32.0 2.0 Generator Gacava 125 25.0 good Mosques, schools, madrasha and families no 0.0 Private/Individual yes 0.08 no Private 20-Mar-22 Remove the soil and Maintaian pipeline and additional pump Rehabilitation, provision of solar system and diesel and medical provision and additional pipeline, new generator and pump solar
7454 Dug Well FGS Ministry of Energy and Water Resources March 29, 2022 Lower Shabelle afgooye Waanjeele 2.5 Private 29/03/2009 Al furqaan Water supply 2.1530451 45.1195002 54.0 4 rural yes Yes 3415 0 0 0 0.0 21.0 6.0 4.0 24.0 2.0 24.0 Plastic tank 3.0 PVC 2000.0 683 0 0 yes 15 5.0 Submersible Pump 5.0 2.0 Generator Gacava 115 15.0 good Mosques for free, madrasah free no 0.0 Private/Individual yes 0.08 no Private 30-Jan-22 Maintain water tanka, pipeline replacement for 400M Rehabilitation of water tank, new water tank, new generator, solar system, provide pipeline, construction of two home for the generator
8060 Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Qori-lugud 1.0 Save the children 18/10/2020 Qori lugud Startegic borehole 8.56011182069778 46.2379563041031 741.0 1 rural urban yes Yes 12000 7000 0 15000 0.0 354.0 pvc 8.0 176.0 16.0 12.0 Concrete/Masonry tank 24.0 PVC 15000.0 24000 6 6 yes 20 8.0 Submersible Pump Laura 16.0 310.0 Hybrid - Solar/Generator JP45 45.0 DS72300W 300.0 good The system is well functioning no 38.0 7.0 1360.0 2500.0 Communal yes 06/08/2016 4 3 no no Somaliland MoWRD 11/11/2021 The MowRD changed and rehabilitated the pump of the borehole to new one in 2022 Currently the pipeline connecting to the reservoir needs change and to be replaced to new ones, also water extension to the animal troughs is necessary as the most animal troughs connected in this system aren't functioning.
8095 Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Shasha cade 1.0 Somaliland MoWRD 02/03/2022 Shasha cade 8.64965225569904 45.9524304606021 761.0 1 rural urban yes Yes 12000 5000 0 20000 0.0 396.0 pvc 8.0 180.0 10.0 12.0 1.5 2.0 Other Other 24000 0 0 yes 12 8.0 Submersible Pump Laura 10.0 297.0 Generator NGT66 66.0 good The supply is currently under construction as the borehole is recently established by the MoWRD. water reservoirs, animal troughs and pipeline extension is currently under construction. no 34.7 7.0 1200.0 1600.0 Communal yes 03/03/2022 4 3 no no Somaliland MoWRD 29/03/2022 Construction and establishment of this Borehole Construction of Reservoirs,fence, piple extension and animal troughs.
7808 Dam Puntland Ministry of Energy Minerals and Water March 29, 2022 Nugaal garowe Rabaable 2.0 World Bank 29/03/2021 Rabaable dam 8.2945877 48.3185965 522.0 1 rural yes Yes 500 1500 500 2500 20.0 4.0 9.0 80.0 Concrete/Masonry tank 50.0 PVC 150.0 1 2 no Submersible Pump 4.0 5.0 Solar good yes Colorless and odorless 30.5 7.9 4690.0 3142.3 Communal yes 19/12/2021 3 2 no no World Bank 19/12/2021 1. Construction of ground water tank 2. Construction of animal troughts 3. Installation of solar power
8298 Borehole FGS Ministry of Energy and Water Resources March 29, 2022 Lower Shabelle afgooye Balabaleey 5.0 European Union 29/03/1982 Abaaleey 2.143491 45.1272776 51.0 3 urban no 0 Abandoned Not completed well 0 120.0 gi 12.0 0.0 0.0 0.0 0.0 0.0 Other 0.0 Stainless Steel 0.0 0 0 0 no No Pump poor This borehole was stabilished 1982 so it wasn't completed well no 0.0 Other no no Agency not specified No 0

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors