Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7067 Borehole Puntland Ministry of Energy Minerals and Water March 22, 2022 Bari iskushuban Moqor 1.0 ICRC 01/01/2013 Moqor borehole 10.6593991 49.9420605 497.0 1 rural urban yes Yes 2000 1000 3000 304.0 pvc 8.0 260.0 3.0 6.0 2.0 Concrete/Masonry tank 18.0 Galvanised Steel 1000.0 4 2 no Submersible Pump 290.0 Generator Perkins 33.0 good The condition of supply system is Good but the yield is very low 1.Due to low yield of the borehole the kiosks don't function 2. Due to the low yield the demand is too much. no 28.3 7.7 888.0 443.0 Communal no yes 0.1 yes Puntland MoEMW 01/01/2018 Changed the submersible pump 1.Solar 2. Large capacity water tank 3.Fencing 4. Replacement of main raising pipes 5. Replacement of submersible pump. 6. More troughs. 7. Care taker room. 8. Currently they Need Water trucking. 9.A high yeild borehole.
8375 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Gafay 0.0 Former Somali Government 10/06/1987 Gafay 2.88381 45.54169 rural yes Yes 2980 100 50 9.0 4.5 8.0 Concrete/Masonry tank 15.0 Galvanised Steel 15.0 387 2 no Submersible Pump 1kw 8.0 Solar good It's in a good condition no Communal yes 18-Oct-21 4 3 no no GSA 10-Mar-22 Rehabilitation of elevated water tank, communal water points, generator room and supply of solar system, submersible pump and GI pipes. Fence and gate and caretaker room
8563 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Magaadley 0.0 16/09/2019 Magaadley 2.8659139 45.5294753 143.0 1 rural yes Yes 580 9.0 7.0 80 Hand Pump poor no Communal yes 5 2 no no Deepening, construction of elevated water tank, communal water point and installation of solar system
7185 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Dhuumoodle 2.0 Community_ 21/03/2015 Dhuumoodle 1 10.4797765 50.4141208 284.0 2 rural urban yes Yes 9000 16000 30000 3.0 120.0 pvc 8.0 40.0 56.0 24.0 Concrete/Masonry tank 40.0 PVC 500.0 1 2 yes 48 8.0 Submersible Pump Luwara 70.0 Hybrid - Solar/Generator Perkins 50.0 21.6 poor 1.Main raising pipes are rusted and leaking 2.the elevated water tank is not enough 3.Generator is malfunctioning 4.solar system are too weak to generate enough power no 28.3 7.75 2370.0 1180.0 Private/Individual yes 0.05 yes CARE Somalia 01/01/2019 Elevated water tank and troughs 1. Immediate change of main raising pipes and the submersible pump before it stops functioning and get cut-off. 2.Solar-power with battery storage and Generator 3. A Larger capacity of water tank 4. 3 more troughs
8607 Dam FGS Ministry of Energy and Water Resources March 21, 2022 Gedo cel_waq Qubawana 10.0 CARE Somalia 21/03/2022 Qubawana dum 2.830119 41.004279 116.0 1 rural no 12 No 3 months ago due to the Drought 2000 125 2855 25485 0.0 100.0 100.0 Other yes ADESO 21-Mar-22 Rehabilitation of the dam To expand the dam and make water havesting
7016 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo garbharey Shabeel 10.0 NCA 21/03/2022 Shakeel water point 3.8031434 42.5506725 128.0 2 rural yes Yes 1020 1500 1000 2000 0.0 10.0 2.0 3.0 4.0 8.0 9.0 Concrete/Masonry tank 20.0 PVC 0.0 0 0 0 no Submersible Pump Germany type 21.0 4.0 Generator China 115.0 poor Very poor yes Communal yes 21-Mar-22 5 2 yes 5 yes AMA 21-Mar-22 Water tank construction Piping solar installation
8433 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Jowhar Somali 0.0 PAH 10/06/2019 Jowhar Somali 2.7807787 45.5185638 104.0 1 rural no 6 No It stopped 1 year ago, due to the hand pump damages 580 0 0 0 0.0 9.0 7.0 Other 25 0 0 no Hand Pump Afridev poor It's not working no Private-Public-Partnership no no Deepening and installation of new hand pump
7007 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo belet_xaawo Malakariyey 15.0 ASEP 21/03/2022 Malkariyey well 3.98234 41.9071 109.0 4 rural yes Yes 10000 100 1500 20000 2.0 14.0 8.0 1.0 24.0 2.0 3.0 Concrete/Masonry tank 20.0 PVC 0.0 0 0 3 yes 8 20.0 Surface mounted Pump 2.0 Generator 115 20.0 fair The engine is poor hence can't supply more water yes Private/Individual yes 5 yes COOPI 21-Mar-22 Renovation Rehabilitation and piping system
8377 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Timiro 0.0 Former Somali Government 17/06/1986 Timiro 2.8093573 45.5366815 107.0 rural yes Yes 2980 9.0 6.0 3.0 Concrete/Masonry tank 5.0 PVC 15.0 70 1 0 no Submersible Pump 1.5 kw 8.0 Solar fair It's in a normal condition no Private-Public-Partnership no no IMC 15-Jun-22 Rehabilitation of shallow well and installation of Solar systems Deepening of the source and Generator room and supply of Generator
7292 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Taageer 4.0 Red Crescent Society for United Arab Emirates 06/06/2007 Taageer Borehole 10.9658347 50.9198765 131.0 1 rural urban yes Yes 6000 400 7000 168.0 gi 8.0 122.0 11.0 10.0 Concrete/Masonry tank 34.0 Galvanised Steel 4000.0 20 5 4 yes 4 6.0 Submersible Pump Lowara 156.0 Hybrid - Solar/Generator 3 Perkins Generator,50+45+45 kva 140.0 17.5 poor 1.Main raising pipes are old and rusted, and need changing immediately. 2. Pipelines are leaking. 3.Generators are not working. 4. no 28.2 7.5 652.0 326.0 Communal no yes 0.1 yes CARE Somalia 02/05/2017 Changed main raising pipes. 1. Immediate Replacement of main raising pipes and the submersible pump. 2. 1Km Pipeline extension and changing of the rusted pipes. 3. Rehabilitation of the generators, 4. Construction of more Kiosks and another elevated water tank due to the settlement expansion.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France

Donors