Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8363 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar WaqWaqley 0.0 Former Somali Government 07/06/1985 WaqWaqley 2.77601 45.50312 urban yes Yes 3680 14.0 5.8 8.0 Plastic tank 5.0 Galvanised Steel 20.0 380 1 no Submersible Pump 1kw 13.0 Solar good It's in a good condition no Communal yes 20-Oct-21 4 3 no no GSA 20-Feb-22 Deepening of the source, Rehabilitation of elevated water tank, communal water points,well apron, construction of Generator room, mounting structure, supply and installation of solar system and submersible pump Elevated water tank
8364 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Barow Weyne 0.0 Former Somali Government 13/07/2013 Barow Weyne 2.8686348 45.5277866 117.0 1 rural yes Yes 1480 14.0 8.0 2.0 Concrete/Masonry tank 5.0 PVC 20.0 180 1 no Submersible Pump 1.5kw 13.0 Solar fair It's in a normal condition no Private-Public-Partnership no no IMC 13-Jul-19 Rehabilitation and installation of Solar system Elevated water tank and supply of Generator
8607 Dam FGS Ministry of Energy and Water Resources March 21, 2022 Gedo cel_waq Qubawana 10.0 CARE Somalia 21/03/2022 Qubawana dum 2.830119 41.004279 116.0 1 rural no 12 No 3 months ago due to the Drought 2000 125 2855 25485 0.0 100.0 100.0 Other yes ADESO 21-Mar-22 Rehabilitation of the dam To expand the dam and make water havesting
7292 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Taageer 4.0 Red Crescent Society for United Arab Emirates 06/06/2007 Taageer Borehole 10.9658347 50.9198765 131.0 1 rural urban yes Yes 6000 400 7000 168.0 gi 8.0 122.0 11.0 10.0 Concrete/Masonry tank 34.0 Galvanised Steel 4000.0 20 5 4 yes 4 6.0 Submersible Pump Lowara 156.0 Hybrid - Solar/Generator 3 Perkins Generator,50+45+45 kva 140.0 17.5 poor 1.Main raising pipes are old and rusted, and need changing immediately. 2. Pipelines are leaking. 3.Generators are not working. 4. no 28.2 7.5 652.0 326.0 Communal no yes 0.1 yes CARE Somalia 02/05/2017 Changed main raising pipes. 1. Immediate Replacement of main raising pipes and the submersible pump. 2. 1Km Pipeline extension and changing of the rusted pipes. 3. Rehabilitation of the generators, 4. Construction of more Kiosks and another elevated water tank due to the settlement expansion.
7007 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo belet_xaawo Malakariyey 15.0 ASEP 21/03/2022 Malkariyey well 3.98234 41.9071 109.0 4 rural yes Yes 10000 100 1500 20000 2.0 14.0 8.0 1.0 24.0 2.0 3.0 Concrete/Masonry tank 20.0 PVC 0.0 0 0 3 yes 8 20.0 Surface mounted Pump 2.0 Generator 115 20.0 fair The engine is poor hence can't supply more water yes Private/Individual yes 5 yes COOPI 21-Mar-22 Renovation Rehabilitation and piping system
8375 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Gafay 0.0 Former Somali Government 10/06/1987 Gafay 2.88381 45.54169 rural yes Yes 2980 100 50 9.0 4.5 8.0 Concrete/Masonry tank 15.0 Galvanised Steel 15.0 387 2 no Submersible Pump 1kw 8.0 Solar good It's in a good condition no Communal yes 18-Oct-21 4 3 no no GSA 10-Mar-22 Rehabilitation of elevated water tank, communal water points, generator room and supply of solar system, submersible pump and GI pipes. Fence and gate and caretaker room
8430 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Timiro 0.0 Former Somali Government 16/11/2002 Cabdi galadi 2.8090774 45.537392 103.0 rural yes Yes 1890 8.0 30 no Hand Pump Afridev poor no Other no no Deepening, construction of water tank, pipeline extension, solar system, generator room fence and gate and supply submersible pump
8663 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Tuulo ciise 0.6 Community_ 15/02/2022 Tuulo ciise borehole 10.4278199 50.1535221 335.0 1 yes No The source has a potential high yield and its a new borehole and doesn't have the equipment to function and also there is no water tank. 127.0 8.0 50.0 64.0 poor No storage no pipelines no Communal 1. Immediate complete equipment. A. GI pipes, submersible pump, power source and elevated water tank and caretaker room and storage room.
7363 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo garbharey Tuulodhumod 5.0 Private 21/03/2022 Ceel garuun 3.8031535 42.5507034 134.0 1 urban yes Yes 2450 16.0 7.0 2.0 12.0 1.0 3.0 Plastic tank 10.0 PVC 0.0 0 0 no Surface mounted Pump Generator Gengafa 115.0 poor Poor supply yes Communal yes 21-Mar-22 2 3 yes 5 no Community 21-Mar-22 Extended Pipeline and engine
8565 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Middle Shabelle jowhar Barow 0.0 Former Somali Government 14/07/2019 Barow 2.8688984 45.5268223 114.0 1 rural no 4 No 1 year ago, it become dry 650 9.0 65 no No Pump poor no Other no no Deepening and solar system

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors