Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7103 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Gocosaale | — | Community | 28/04/2021 | Gocosaale BH | — | 6.8633508 | 49.0177023 | 26.0 | — | 1 | — | rural | yes | — | Yes | — | 500 | 1000 | 70 | 5000 | 0.0 | — | 180.0 | pvc | 8.0 | — | 8.0 | 24.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 150.0 | — | 2 | 4 | yes | 20 | 8.0 | Submersible Pump | — | 11.0 | 150.0 | Generator | Parkins | 30.0 | — | — | poor | Under construction | yes | Colorless and odorless | 32.0 | 7.41 | 728.0 | 362.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Fancing of borehole 2. Pump rehabilitation 3. Construction of generator room 4. Installation of solar power 5. Water committees training. 6. Operation tools. | — | — |
7785 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Garacad 1 | 0.5 | CARE Somalia | 28/02/2006 | Garacad BH 1 | — | 6.9437939 | 49.3254529 | -22.0 | — | 3 | — | urban | yes | — | Yes | — | 15000 | — | — | — | — | — | 7.0 | pvc | 8.0 | — | 2.0 | 5.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 13.0 | Galvanised Steel | 1500.0 | 134 | 0 | — | no | — | — | Submersible Pump | — | 1.5 | 5.0 | Solar | — | — | — | — | poor | Because of more saline in water, the water supply corrosion than destroyed | yes | Very saline water | 29.1 | 7.8 | 7240.0 | 4850.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1.Drilling new borehole far away for this borehole because this borehole so saline 2. Rehabilitation and reconstruction all water supply. | — | — |
7114 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Towfiiq | 0.8 | Community | 28/02/2016 | Towfiiq BH 1 | — | 6.6146549 | 48.8797355 | 10.0 | — | 2 | — | rural urban | yes | — | Yes | — | 14000 | 3000 | 500 | 15000 | 0.0 | — | 92.0 | pvc | 8.0 | — | 15.3 | 14.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 70.0 | Galvanised Steel | 150.0 | — | 1 | 3 | yes | 15 | 90.0 | Submersible Pump | Lowara | 24.0 | 72.0 | Generator | Dos | 30.0 | — | — | good | — | yes | Colorless and odorless | 29.8 | 7.13 | 1150.0 | 553.0 | — | Communal | yes | 28/02/2016 | 3 | 1 | yes | 0.1 | yes | — | — | — | — | — | — | 1. Installation of solar power. 2. Fuel supporting. 3. Construction of new kiosks. 4. Operation tools. | — | — |
7213 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Bari | qardho | Dhudhub | 0.5 | Minstry of water and energy federal Republic of somalia | 28/02/2014 | Dhudhub borehole | — | 9.2356349 | 49.9205093 | 438.0 | — | 1 | — | rural urban | yes | — | Yes | — | 12000 | 4000 | — | 7000 | — | — | 410.0 | pvc | 8.0 | 140.0 | 10.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 4200.0 | — | 5 | 2 | yes | 5 | 9.0 | Submersible Pump | Lawara | — | 204.0 | Hybrid - Solar/Generator | Perkins | 50.0 | 300-72M | 29.4 | fair | The water demand of the dhudhub is very high. No sufficient water kiosks in the village | no | — | 38.5 | 7.2 | 3830.0 | 1910.0 | — | Communal | yes | 28/06/2015 | 5 | 2 | no | — | yes | — | — | — | Puntland MoEMW | 15/09/2021 | Replacement of main raising pipes. | 1: Water supply system which gives water to village. 2: Replacement of all distribution pipe lines. 3: Fencing. 4: Rehabilitation of elevated water tank in order to stop water leaking. | — | — |
7102 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Towfiiq | 0.3 | — | 28/02/2016 | Towfiq BH 1 | — | 6.6137593 | 48.8710917 | 3.0 | — | 2 | — | rural urban | yes | — | Yes | — | 14000 | 10000 | 800 | 15000 | 0.0 | — | 84.0 | pvc | 8.0 | — | 12.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 1500.0 | 2000 | 8 | 2 | yes | 16 | 96.0 | Submersible Pump | — | 11.0 | 72.0 | Generator | Parkins | 45.0 | — | — | fair | Extension of animal thoughts | yes | Colorless and odorless | 29.8 | 7.13 | 6450.0 | 3130.0 | — | Communal | yes | 28/02/2016 | 3 | 2 | yes | 0.05 | yes | — | — | — | CARE Somalia | 28/12/2021 | 1.Construction of elevated water tank 2. Construction of caretaker room. | 1. Installation of solar power 2. Construction of animal thoughts 3. Construction of new generator room 4. Rehabilitation of elevated water tank. 5. Extension of pipelines systems. | — | — |
8677 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Garacad | 2.8 | Community | 28/10/2021 | Garacad 2 | — | 6.9727697 | 49.2928211 | 2.0 | — | 3 | — | urban | no | 1 | No | The water supply of this borehole still constructing | — | — | — | — | — | — | 43.0 | pvc | 8.0 | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | — | — | — | no | — | — | Surface mounted Pump | — | — | — | Solar | — | — | — | — | poor | Under construction | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Installation of generator 3. Fancing borehole | — | — |
7166 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Qodax | 1.5 | Community_ | 27/02/2020 | Qodax borehole | — | 9.6397862 | 49.8325483 | 560.0 | — | 1 | — | rural urban | yes | — | No | 25/12/2021 The pump doesn't work | 2100 | 1500 | — | 5000 | — | — | 320.0 | pvc | 8.0 | 202.0 | 13.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 6.0 | Galvanised Steel | 1000.0 | — | 4 | 2 | yes | 15 | 6.0 | Submersible Pump | Lowara | — | 300.0 | Hybrid - Solar/Generator | Perkins | 45.0 | JCNS-M36V390W | 23.4 | good | — | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | yes | — | — | — | KAALO Relief and Development | 27/04/2021 | Provision of generator Construction of animal troughs Construction of Solar power installation Construction of kiosks Distribution of water into the village Construction of ground tank which gives water into the village | Construction of elevated water tank Replacement of pump Replacement of main raising pipes Electric cable which connect to the generator and pump Construction of animal troughs Construction of extra solar power installation Construction of toilet and caretaker hause. Cleaning of the solar. | — | — |
7790 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Mudug | jariban | Kulub | 12.0 | — | — | Kutub BH | — | 7.1254653 | 49.3484248 | 10.0 | — | 1 | — | rural | yes | — | No | All water system destroyed | — | — | — | — | 0.0 | — | 70.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | — | — | — | — | — | no | — | — | Submersible Pump | — | — | — | Generator | — | — | — | — | poor | All systems disfunction | yes | Colorless and odorless | 29.2 | 7.51 | 6350.0 | 4254.5 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Drilling new borehole 3. Water supply construction | — | — |
7087 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Rako raaxo | 4.0 | Other | 04/11/2018 | Rako raaxo borehole 2 | — | 9.7517126 | 49.7252112 | 639.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 3500 | 60 | 7000 | — | — | 450.0 | pvc | 8.0 | 360.0 | 12.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | Galvanised Steel | 700.0 | — | — | 2 | yes | 8 | 9.0 | Submersible Pump | Grundforce | — | 360.0 | Hybrid - Solar/Generator | Perkins | 60.0 | S/M- 250W | 36.0 | good | — | no | — | 33.3 | 6.4 | 3300.0 | 1609.0 | — | Communal | yes | 19/09/1998 | 2 | 3 | yes | 0.026 | yes | — | — | — | — | — | — | Replacement of main raising pipe and submersible pump. Generator room Construction elevated water tank for animals. Water supply system for the town. | — | — |
7212 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Xunbays | 1.0 | Community | 27/02/2017 | Xunbays borehole | — | 9.6390728 | 49.892484 | 539.0 | — | 1 | — | rural urban | yes | — | Yes | — | 9000 | 4500 | — | 10000 | — | — | 320.0 | pvc | 8.0 | — | 5.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 122.0 | Galvanised Steel | 4000.0 | 70 | 2 | 3 | yes | 13 | 8.0 | Submersible Pump | Lowara | — | 258.0 | Hybrid - Solar/Generator | Perkins | 45.0 | JCNS-M36V360W | 24.48 | good | The xumbays city has water supply system, despite the yield of borehole is very low, Elevated water tanks, water supply all are donored by the local community. | no | — | 30.3 | 7.3 | 4100.0 | 2100.0 | — | Communal | yes | 27/02/2015 | 6 | 3 | no | — | yes | — | — | — | USAID | 27/06/2020 | Installation of solar power system. | Replacement of main raising pipes. Replacement of pump. Replacent of electric cable which connect pump and generator. Construction of two extra animal troughs Construction water trucking kiosks. Construction of generator house and toilet. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France