Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7182 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Ceelbardaale | — | — | 02/03/2010 | Ceelbardaale BH | — | 7.0662259 | 47.8745802 | 267.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1750 | 2000 | — | 5000 | 0.0 | — | 180.0 | pvc | 8.0 | — | 15.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | Galvanised Steel | 120.0 | — | 1 | 4 | yes | 3 | 10.0 | Submersible Pump | — | 11.0 | 90.0 | Generator | Parkins | 45.0 | — | — | fair | Shortness of koisks | yes | Colorless and odorless | 29.6 | 7.91 | 2900.0 | 1430.0 | — | Communal | yes | 02/03/2010 | 5 | 3 | yes | 0.05 | yes | — | — | — | — | — | — | 1. Full rehabilitation. 2. Rehabilitation of pipes 3. Installation of solar power 4. Rehabilitation of pump and river pipes | — | — |
7225 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Guuco | 0.5 | Community | 02/03/2011 | Guuco BH | — | 7.10234 | 47.9937396 | 261.0 | — | 1 | — | rural urban | yes | — | Yes | — | 2520 | 500 | — | 2000 | 0.0 | — | 243.0 | pvc | 8.0 | — | 22.0 | 10.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 144.0 | Galvanised Steel | 750.0 | — | 3 | 4 | yes | 1 | 6.0 | Submersible Pump | — | 11.0 | 138.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.57 | 3720.0 | 1820.0 | — | Communal | yes | 02/03/2018 | 3 | 2 | yes | 0.05 | yes | — | — | — | CARE Somalia | 02/02/2022 | 1. Construction of new elevated tank | 1. Installation of solar power 2. Fuel supporting 3. Fancing. 4. Rehabilitation of animal thoughts 5. Operator support. | — | — |
7507 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Jeexdin | — | — | — | Jeexdin BH | — | 6.863615 | 47.5331415 | 287.0 | — | 1 | — | rural urban | yes | — | Yes | — | 7000 | 3000 | — | 4000 | 0.0 | — | 220.0 | pvc | 8.0 | — | 8.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 500.0 | 20 | 8 | 2 | yes | 5 | 30.0 | Submersible Pump | — | 11.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 50.0 | YL320P_35b | 12.8 | fair | Needs rehabilitation of supplies | yes | Colorless and odorless | 28.8 | 7.76 | 3560.0 | 1690.0 | — | Communal | yes | 02/03/2015 | 5 | 2 | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 02/03/2018 | Construction of elevated tank | 1. Rehabilitation of pump and riser pipes 2. Extension of pipelines. 3. Rehabilitation of kiosks and animal thoughts | — | — |
8730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Gacmo fale | — | DRC - Puntland | 05/01/2021 | Gacmofale BH | — | 7.0381939 | 47.7817081 | 267.0 | — | 2 | — | — | no | 4 | No | Unknown problem | — | — | — | — | — | — | 222.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1. Emergency to study for problems this borehole. | — | — |
7300 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Ballibusle | 0.0 | Community | 02/03/2007 | Ballibusle | — | 7.0960348 | 48.1616904 | 229.0 | — | 3 | — | rural urban | yes | — | Yes | — | 22400 | 10000 | 0 | 12000 | 0.0 | — | 176.0 | pvc | 8.0 | — | 14.6 | 20.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 88.0 | Galvanised Steel | 1500.0 | 900 | 2 | 4 | yes | 52 | 8.0 | Submersible Pump | Franklin | 11.0 | 146.0 | Hybrid - Solar/Generator | Parkins | 45.0 | 200-72M | 22.4 | fair | Water supply rehabilitation | yes | Colorless and odorless | 28.6 | 7.83 | 3430.0 | 1705.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 02/03/2019 | 1. Construction of elevated water tank | 1. One extra pump. 2. Fancing of solar system. 2. Rehabilitation of kiosks. 3. Rehabilitation of animal thoughts | — | — |
7168 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Bari | bandar_beyla | Ceel dhidar | 1.0 | — | — | Ceel dhidar spring | — | 9.2725433 | 50.704176 | 35.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1200 | 1000 | — | 15000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 1000.0 | — | 2 | 3 | yes | 10 | 10.0 | Submersible Pump | Lawara | — | — | Generator | Perkins | 33.0 | — | — | — | — | no | — | 34.5 | 7.1 | 3050.0 | 1500.0 | — | Communal | no | — | — | — | yes | 0.15 | yes | — | — | — | IR | 02/01/2021 | Construction of elevated water tank fencing | Replacement of pump. Replacement of all distribution pipes. Installation of solar power system. | — | — |
7506 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Ballibusle | — | GTZ | 02/03/1986 | Ballibusle BH 1 | — | 7.0982223 | 48.1592113 | 244.0 | — | 3 | — | rural urban | yes | — | Yes | — | 22400 | — | — | — | 0.0 | — | 180.0 | pvc | 8.0 | — | 12.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 1500.0 | 1500 | 1 | 2 | yes | — | — | Submersible Pump | Lowara | 15.0 | 125.0 | Generator | Parkins | 45.0 | — | — | poor | Needs rehabilitation of kiosks and animal thoughts | yes | Colorless and odorless | 29.2 | 7.9 | 3760.0 | 1850.0 | — | Communal | yes | 02/03/2005 | 3 | 0 | yes | 0.05 | no | — | — | — | — | — | — | 1. (Emergence) rehibilatation of pump and riser pipes 2. Full rehabilitation( kiosks, elevated tank, and animal thoughts). 2. Installation of solar power. 3. Pipelines rehabilitation 4. Fuel supporting. 5. Fancing. | — | — |
7333 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Jariiban BH 2 | — | 7.2139241 | 48.8476088 | 149.0 | — | 3 | — | rural urban | yes | — | Yes | — | 21000 | — | — | — | 0.0 | — | 182.0 | pvc | 8.0 | — | 14.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 200.0 | — | 1 | 2 | yes | 40 | 8.0 | Submersible Pump | Green fos | 11.0 | 126.0 | Generator | Parkins | 45.0 | — | — | poor | This supply needs extension pipelines, new kiosks, and solar power | yes | Colorless and odorless | 27.6 | 7.43 | 1205.0 | 603.0 | — | Communal | yes | 01/03/2016 | 3 | 2 | yes | 0 | yes | — | — | — | CARE Somalia | 01/11/2021 | 1. Construction of elevated water tank 2. Construction Caretaker rooms 3. Pipe rehabilitation | 1. Emergency 2. Installation of solar power 3. Fancing 4. operator support 5. Emergency of supporting of fuel. | — | — |
7151 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 1.2 | Community | 01/03/2018 | Sallax BH | — | 7.2893979 | 48.3183991 | 174.0 | — | 1 | — | rural urban | yes | — | Yes | — | 2800 | 2500 | 100 | 8000 | 0.0 | — | 303.0 | pvc | 8.0 | — | 13.3 | 18.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 250.0 | — | 1 | 2 | yes | 30 | 36.0 | Submersible Pump | Lowara | 18.0 | 180.0 | Generator | Parkins | 50.0 | — | — | good | — | yes | Colorless and odorless | 34.6 | 7.2 | 825.0 | 410.0 | — | Communal | yes | 01/03/2018 | 2 | 2 | yes | 0.1 | yes | — | — | — | CARE Somalia | 01/03/2019 | 1. Construction of elevated water tank 2. Construction of animal thoughts and kiosk | 1. Installation of solar power 2. Support of fuel. | — | — |
7172 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Seemade BH 1 | — | 7.1558815 | 48.6113718 | 186.0 | — | 2 | — | rural urban | yes | — | Yes | — | 3500 | 5000 | 0 | 10000 | 0.0 | — | 200.0 | pvc | 8.0 | — | 14.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 250.0 | — | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | — | 15.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 32.0 | 340Wp | 15.0 | fair | The koisks of this water supply needs rehabilitation | yes | Colorless and odorless | 31.5 | 7.26 | 5460.0 | 2670.0 | — | Communal | yes | 01/03/1990 | 3 | 1 | yes | 0.05 | yes | — | — | — | Agency not specified | 01/02/2017 | Construction of elevated water tank | 1. Construction of new elevated tank. 2. Construction of new kiosks. 3. Rehabilitation and reconstruction of animal thoughts. 4. Construction of new generator room 5. Extension and rehabilitation of pipelines. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France