Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7861 — Spring Puntland Ministry of Energy Minerals and Water March 5, 2022 Bari bandar_beyla Il raxma 1.5 — — 2 — 9.4989125 50.8073479 -18.0 — 2 — rural urban yes — Yes — 6000 — — — — — — — — — — — — — — — — — — — — — — — — — 4.0 — — — — Concrete/Masonry tank — Galvanised Steel — — — — yes 7 9.0 Submersible Pump Lowara — — Solar — — DS60250M 13.5 poor The yield of spring is very low Bender bayla district have two spring both they distribute water to elevated water tank, then elevated water tank distribute to households, Il raxmo spring and bayla spring shares pipe lines, house holds, number of water trucking. no — 34.0 7.4 3100.0 1520.0 — Communal yes 05/07/2016 5 0 no — no — — — Other 09/08/2014 Construction of caretaker room Installation if solar power system. Construction solar accessories storage room. Installation of extra solar power panels. Replacent of all rusted pipes. — —
7500 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Galkacayo Water Company 05/03/2019 Galkacayo BH 8 — 6.7865529 47.4299743 255.0 — 20 — urban yes — Yes — 77000 — — — — — 220.0 pvc 12.0 — 45.0 15.0 — 2.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 250.0 Galvanised Steel 2500.0 5000 — — no — — Submersible Pump Franklin 22.0 140.0 Hybrid - Solar/Generator Parkins 70.0 YL365D_36D 30.7 good — yes Colorless and odorless 29.8 7.33 4050.0 2025.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — — — —
7730 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Private 05/03/2016 Galkacayo daryeel BH 2 — 6.8166163 47.4382128 262.0 — 20 — urban yes — Yes — 10000 — — — — — 230.0 pvc 8.0 — 13.3 18.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 160.0 PVC 10000.0 700 — — no — — Submersible Pump Lowara 22.0 156.0 Hybrid - Solar/Generator — 160.0 SS360_72 32.76 good — yes Colorless and odorless — — — — — Utility/Local Authority — — — — yes 0.01 no — — — — — — 1. Extension of pipelines — —
7197 — Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Mudug galkayo Jillable 0.8 Community 02/03/2013 Jillable BH — 7.0892246 48.1525466 233.0 — 3 — rural urban yes — No 11 months, pump and pipes problems and Generator. 800 2500 — 5500 0.0 — 180.0 pvc 8.0 — 8.5 12.0 — 4.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 20.0 PVC 1200.0 350 0 2 no — — Submersible Pump Granfoss 11.0 160.0 Hybrid - Solar/Generator Parkins 45.0 — — poor — no — — — — — — Private/Individual — — — — yes 0.05 yes — — — Charity 21/03/2014 Installation of solar power 1. Rehabilitation of pump and riser pipes 2. Rehabilitation of generator. — —
7978 — Dug Well Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Dhuur 0.5 Community_ 22/08/2016 Dhuur dug well — 9.245295 50.6040833 95.0 — 4 — rural yes — Yes — 1800 900 — 3000 — — — — — — — — — — 9.0 5.0 — — — — — — — — — — — — — — — — — — — — — — yes 26 10.0 — — — — — — — — — — — no — 30.3 7.2 1920.0 965.0 — — — — — — — — — — — — Community_e 23/08/2020 Cleaning of the dug well 1: Construction of storage water tank 2: Raising pipes and submersible pump. 3: Animal water troughs 4: Distribution pipe lines 5: Solar and generator. 6: extension of of distribution pipe lines in to the village 7: Construction of cover protection of the dug well — —
7225 — Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Mudug galkayo Guuco 0.5 Community 02/03/2011 Guuco BH — 7.10234 47.9937396 261.0 — 1 — rural urban yes — Yes — 2520 500 — 2000 0.0 — 243.0 pvc 8.0 — 22.0 10.0 — 1.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 144.0 Galvanised Steel 750.0 — 3 4 yes 1 6.0 Submersible Pump — 11.0 138.0 Generator Parkins 45.0 — — good — yes Colorless and odorless 30.5 7.57 3720.0 1820.0 — Communal yes 02/03/2018 3 2 yes 0.05 yes — — — CARE Somalia 02/02/2022 1. Construction of new elevated tank 1. Installation of solar power 2. Fuel supporting 3. Fancing. 4. Rehabilitation of animal thoughts 5. Operator support. — —
7168 — Spring Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Ceel dhidar 1.0 — — Ceel dhidar spring — 9.2725433 50.704176 35.0 — 1 — rural urban yes — Yes — 1200 1000 — 15000 — — — — — — — — — — — — — — — — — — — — — — 6.0 — — — — Concrete/Masonry tank 40.0 Galvanised Steel 1000.0 — 2 3 yes 10 10.0 Submersible Pump Lawara — — Generator Perkins 33.0 — — — — no — 34.5 7.1 3050.0 1500.0 — Communal no — — — yes 0.15 yes — — — IR 02/01/2021 Construction of elevated water tank fencing Replacement of pump. Replacement of all distribution pipes. Installation of solar power system. — —
7131 — Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Mudug galkayo Gacmofale 0.6 DRC - Puntland 02/10/2021 Gacmofale BH 2 — 7.0354983 47.768711 282.0 — 2 — rural urban yes — Yes — 1750 2500 — 8000 0.0 — 250.0 pvc 8.0 — 20.0 10.0 — 1.5 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 50.0 Galvanised Steel 500.0 200 5 4 yes 7 8.0 Submersible Pump Franklin 20.0 120.0 Generator CEOLMO 30.0 — — good — yes Colorless and odorless 29.0 7.61 3050.0 1495.0 — Communal yes 02/12/2021 3 2 yes 0.05 yes — — — — — — 1. Installation of solar power. — —
7709 — Dug Well Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Dhuur 1.0 Community_ 22/08/2015 Dhuur dug well 3 — 9.2454713 50.6056739 93.0 — 4 — urban yes — Yes — 3600 — — — — — — — — — — — — — 10.0 7.0 12.0 12.0 — — — — — — — — — — — — — Steel tank — Galvanised Steel — — 3 — — — — Submersible Pump Lowara — — Hybrid - Solar/Generator — — — — — — no — 35.0 7.5 1950.0 990.0 — Communal no — — — yes 0.01 — — — — Community_e 22/08/2019 Extension of distribution pipe line to village 1: Extension of distribution pipe line to village 2: Construction of another water kiosks 4: Replacement of submersible pump and raising pipes. 4: Generator — —
7650 — Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Dhuur 0.5 Community_ 23/10/2016 Dhuur borehole — 9.2445017 50.6021417 93.0 — 4 — rural urban yes — Yes — 600 200 — 1500 2.0 — 120.0 pvc 8.0 100.0 15.0 7.0 — — — — — — — — — — — — — — — — — — — — — Galvanised Steel — — — — yes 6 10.0 — — — — — — — — — — — no — 33.0 7.1 2150.0 1030.0 — Private/Individual — — — — yes 0.02 — — — — CARE Somalia 22/10/2020 Replacement of main raising pipes and submersible pump. 1: Solar 2: storage water tank. 3: Generator 4: pipes — —

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, The World Bank, FCDO, AICS, SDC, Canada, Sweden and GCF

              ;