Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8159 Borehole Galmudug Ministry of Energy and Water Resources April 11, 2022 Mudug galkayo doogle 0.5 ceel doogle 6.7252693 47.4720687 303.0 0 urban rural yes Yes 2000 7000 280 232.0 pvc 9.0 12.0 Concrete/Masonry tank 320.0 Galvanised Steel 125.0 32 2 3 yes 2 Submersible Pump grunfos 114.0 Hybrid - Solar/Generator perkin 45.0 260w 15.0 poor 1. not water supply supply system 2. not have enough yield for leaching pump pipes no 29.5 7.95 800.0 521.0 IOM solar 2019-06-09
8587 Borehole Somaliland MoWRD April 11, 2022 Sool las_caanood Laascaanood 5.0 Private 01/01/2017 Nugaal borehole 4 8.5073342 47.4059242 619.0 6 urban yes No The is reseve borehole for Nugal water company 70.0 pvc 8.0 63.0 0.0 0.0 Concrete/Masonry tank 3.0 Galvanised Steel no Private/Individual
7157 Borehole Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Ceelbuh 4.0 Community_ 23/07/2021 Qablan borehole 10.2417282 48.3252435 1079.0 5 urban rural yes Yes 4800 600 7000 285.0 pvc 8.0 240.0 14.0 17.0 Concrete/Masonry tank 16.0 Galvanised Steel 2 yes 15 10.0 Submersible Pump Lowara 264.0 Generator Perkins 45.0 fair No sufficient water storage. No water kiosks. no 32.6 7.3 2230.0 1118.0 Communal yes 19/08/2021 3 2 yes 0.3 yes UNICEF 11/04/2022 Construction of elevated water tank Construction of two rooms. Construction of 1 water kiosks 1: Solar power system with battery. 2: Pump and pipe lines 3: Generator. 4: Fencing. 5: Construction of another elevated water tank due capacity of borehole. 6: Construction of animal water troughs.
7588 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 30.0 China 02/11/1984 K9 borehole 9.7886208 43.994276 1051.0 0 urban yes Yes 31200 154.0 gi 8.0 57.7 33.8 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Capriri 33.0 69.0 Electricity Grid fair The condition of the supply system is fair no 33.0 7.7 1250.0 560.0 Communal no yes 0.04 no HWA is responsible its intervention
7162 Borehole Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Degmo khayr 6.0 UNICEF 23/03/2019 Dawoco borehole 10.2171625 48.0314842 1093.0 1 rural urban yes Yes 4200 150 6000 330.0 pvc 8.0 310.0 14.0 11.0 Concrete/Masonry tank 50.0 Galvanised Steel 5652.0 1 3 2 yes 3 9.0 Submersible Pump 252.0 Hybrid - Solar/Generator Perkins 45.0 no 32.5 7.3 3570.0 1785.0 Communal yes 16/02/2021 5 2 yes 0.03 yes IRC 12/02/2021 Solar 1: Amergency replacement of main raising pipes and submersible pump. 2: Replacement of distribution pipe lines 3: Construction of another animal water troughs. 4: Construction of generator room. 5: Construction of another borehole due to water demand. 6: Solar power storage( battery)
8646 Dug Well Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Sibbaayo 1.5 Community_ 01/01/2012 Sibbaayo dugwell 9.9687132 48.1417079 968.0 1 rural urban yes No 15/9/2021 Due to 1: effect of drought 2: pump and main raising pipes are not functioning. 1200 700 3000 10.0 9.0 Concrete/Masonry tank Galvanised Steel 4 fair No distribution pipes. Dug well is not functioning. no Communal yes 24/09/2013 3 4 Puntland MoEMW Construction of elevated water tank. 1: Amergency construction of borehole. 2: Amergency water trucking. 3: Construction of water kiosks.
8775 Borehole Somaliland MoWRD April 11, 2022 Sool las_caanood Laascaanood 6.0 Oxfam GB 11/09/1993 Gooja cade 8.5071852 47.4009598 623.0 2 yes No The borehole is no longer worked last 3 years. During our visit the location everything is destroyed and pipelines are disconnected and no one stayed at location. No fence no protection. no The borehole requires complete rehabilitation from pumps, to generator and the supply system
8647 Dug Well Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Shinbiraale 0.5 Community_ 24/08/2007 Shinbiraale dug well 10.1413467 47.9111032 1072.0 1 urban rural yes No 20/2/2022 The reason is Due to drought effects the dug well become yield less 6000 200 1500 10.0 9.0 no fair No sufficient yield. No distribution pipe lines. No main raising pipes and submersible pump. Now the community uses water trucking from another villages which is far from shinbiraale to 50km. no Communal yes 19/06/2010 3 4 Community_e 26/08/2016 Digged the deep of the well. 1: Amergency construction of new borehole due to water demand of shinbiraale community, now the community uses water trucking from another villages which is far from shinbiraale to 50km. 2: Construction of elevated water tank. 3: Construction of water kiosks in the village 4: Construction of animal water troughs. 5: distrubution pipe line. 6: Construction of generator room and caretaker room 7: Generator and solar with battery
8704 Borehole Somaliland MoWRD April 11, 2022 Sool las_caanood Ahmednasir 5.0 Private 01/01/2017 Nugaal borehole 3 8.5067988 47.4053675 621.0 3 urban yes No Reserve 70.0 pvc 8.0 60.0 no
7483 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.1 Arab funded 11/04/2017 K3.2 borehole 9.7715334 43.9704239 1013.0 0 urban yes Yes 31200 91.0 gi 8.0 20.0 39.7 23.0 0.0 0.0 Concrete/Masonry tank 30000.0 4457 0 0 no Submersible Pump Capriri 39.0 42.0 Electricity Grid fair Fair supply system no 30.5 8.2 695.0 360.0 Communal no yes 0.06 no 02/04/2022 No intervention required

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France

Donors