Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7974 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bone | 1.3 | ICNA | 14/03/2019 | Bone BH | — | 7.3018054 | 47.5684045 | 362.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3500 | 1000 | 200 | 8000 | — | — | 250.0 | pvc | 8.0 | 60.0 | 12.0 | 8.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 1350.0 | — | 2 | 3 | yes | 15 | 8.0 | Submersible Pump | — | 11.0 | 240.0 | Hybrid - Solar/Generator | Parkins | 45.0 | MS350M-73 | 18.2 | good | — | yes | Colorless and odorless | 35.6 | 7.6 | 1971.0 | 981.0 | — | Communal | yes | 14/03/2019 | 5 | 2 | no | — | no | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank | 1. Pump and riser pipes rehabilitation. 2. Fuel supporting. 3. Operator supporting. 4. Construction of new kiosks bone IDP. | — | — |
7515 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Ceelgerdi 2 | — | Community | 14/03/2014 | Ceelgerdi BH 2 | — | 7.2318127 | 47.5488879 | 344.0 | — | 1 | — | rural | yes | — | Yes | — | 350 | 500 | — | 1500 | 4.0 | — | 190.0 | pvc | 8.0 | 135.0 | 13.3 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 700.0 | 7 | 0 | 2 | yes | 7 | 8.0 | Submersible Pump | Lowara | 11.0 | 145.0 | Generator | Parkins | 45.0 | — | — | fair | Supply needs rehabilitation | yes | Colorless and odorless | 34.1 | 7.81 | 3110.0 | 1550.0 | — | Communal | yes | 14/03/2017 | 2 | 1 | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of koisks 2. Construction of new elevated tank 3. Installation of solar power 4. Rehabilitation of pump and riser pipes | — | — |
7888 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Heema | 0.3 | ADA | 14/03/2004 | Heema BH | — | 7.1430376 | 47.5313058 | 344.0 | — | 1 | — | urban | yes | — | Yes | — | 3100 | — | — | — | — | — | 180.0 | pvc | 8.0 | — | 16.0 | 14.0 | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 130.0 | PVC | 1500.0 | 70 | 2 | 2 | no | — | — | Submersible Pump | — | 11.0 | 162.0 | Generator | Lesory somer | 45.0 | — | — | good | — | yes | Colorless and odorless | 31.8 | 7.85 | 2645.0 | 1318.0 | — | Communal | yes | 15/03/2012 | 3 | 2 | no | — | no | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank | 1. Installation of solar power. 2. Panels. 3. Extension of pipelines. 4. Rehabilitation of pump and riser pipes. | — | — |
7516 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bacaadweyn | 0.8 | Community | 14/03/2022 | Bacaadweyn water company BH | — | 7.21072 | 47.5212386 | 349.0 | — | 2 | — | rural urban | yes | — | Yes | — | 21000 | 800 | — | 1200 | — | — | 235.0 | pvc | 8.0 | 125.0 | 22.0 | 18.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 250.0 | PVC | 4000.0 | 1800 | 5 | 2 | yes | 25 | 8.0 | Submersible Pump | — | 22.0 | 171.0 | Hybrid - Solar/Generator | Parkins | 60.0 | BYD335PK-36 | 33.5 | good | — | yes | Colorless and odorless | 29.2 | 7.81 | 2895.0 | 1435.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | DRC | 14/03/2020 | 1. Installation of solar power. | 1. Installation of generator 2. Extension pipelines 3. Rehabilitation of pipes 4. Rehabilitation of steel tank, because its corrosive. | — | — |
7043 | — | Borehole | FGS Ministry of Energy and Water Resources | March 14, 2022 | Hiraan | beled_weyne | Feerfeer somalia 2 | — | ICRC | 17/02/2021 | Tawakal | — | 5.0455903 | 45.1438813 | 200.0 | — | 5 | — | urban | yes | — | Yes | — | 0 | — | — | — | — | — | 250.0 | pvc | 10.0 | 90.0 | 25.0 | 8.0 | 25.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 250.0 | 0 | 1 | 2 | no | — | — | Submersible Pump | Grondfos submersible pump | 8.0 | 90.0 | Generator | Eveka generator | 30.0 | — | — | good | Ok | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | yes | — | — | — | Community | 18-Dec-21 | Kiosks | Solar system and filter of water because the water 100% salt | — | — |
7217 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Bari | iskushuban | Camaan | 2.0 | Other | 29/01/2020 | Camaaan borehole | — | 10.1725041 | 49.8349062 | 407.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1500 | 4000 | — | 12000 | — | — | 280.0 | pvc | 8.0 | 250.0 | 12.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | — | — | 2 | 2 | yes | 7 | 9.0 | Submersible Pump | Lowara | — | — | Hybrid - Solar/Generator | Perkins | 45.0 | GPS300-300 | 25.8 | good | But the village has no water supply, in addition to that the area is over population | no | — | 24.2 | 7.35 | 1950.0 | 956.0 | — | Communal | yes | 14/06/2007 | 8 | 3 | no | — | yes | — | — | — | — | — | There is no intervention up to its establishment. | 1: Replacement of main raining pipes immediately. 2: Fencing. 3: Construction of another elevated water tank due to increased demand. 4: Construction of another water troughs due increased demand of lvestock. 5: Construction of caretaker room. 6: pipe extention in order to supply the settlement. | — | — |
7691 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Bari | iskushuban | Jeedal | 2.0 | UNICEF | 19/02/2022 | Jeedal borehole | — | 10.2112917 | 49.5234167 | 647.0 | — | 1 | — | rural urban | yes | — | Yes | — | — | — | — | — | — | — | 260.0 | pvc | 8.0 | — | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 25 | 8.0 | Submersible Pump | Lowara | — | 276.0 | Generator | Perkins | 45.0 | — | — | fair | No elevated water tank No animal troughs. No water points. | no | — | 33.0 | 8.2 | 1350.0 | 680.0 | — | Communal | no | — | — | — | yes | 0.015 | — | — | — | — | — | — | No intervention is performed, because the borehole is newer | This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon. Despite that they need the flowing intervention:- 1: Installation of solar power system,due to the increased fuel prices. 2: Water tank for the town supply. 3: Distribution pipes and kiosks for the settlement. | — | — |
7227 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Daarasalaam | — | Community | 13/03/2002 | Daarasalaam BH | — | 7.0814702 | 47.4922321 | 315.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 450 | — | 1500 | 0.0 | — | 170.0 | pvc | 8.0 | 56.0 | 16.6 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1500.0 | 250 | 5 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 108.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS572380M | 16.72 | good | — | yes | Colorless and odorless | 32.6 | 7.71 | 2470.0 | 1225.0 | — | Communal | yes | 13/03/2002 | 3 | 0 | yes | 0.05 | yes | — | — | — | NRC | 13/02/2021 | 1. Construction of new elevated tank 2. Construction of koisks | 1. Extension pipelines 2. Extension of solar power | — | — |
7943 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | Save the children | 13/02/2021 | Cagaraan BH | — | 7.0347377 | 47.4901695 | 284.0 | — | 2 | — | urban rural | yes | — | Yes | — | 700 | — | — | — | — | — | 180.0 | pvc | 8.0 | 95.0 | 25.0 | 12.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2500.0 | — | 4 | 2 | yes | 7 | 8.0 | Submersible Pump | — | 11.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 45.0 | PV800-4T30G | 30.0 | good | — | yes | Colorless and odorless | 35.2 | 8.05 | 2235.0 | 1115.0 | — | Communal | yes | 13/03/2021 | 3 | — | no | — | no | — | — | — | Save the children | 13/01/2021 | 1 . Installation of solar power | Fuel supporting. Rehabilitation pipelines | — | — |
7253 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | WDA | 13/03/1991 | Cagaaran BH 1 | — | 7.0618805 | 47.4853827 | 279.0 | — | 3 | — | rural urban | yes | — | Yes | — | 17500 | 9000 | 100 | 15000 | — | — | 195.0 | pvc | 8.0 | 105.0 | 18.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | Galvanised Steel | 2000.0 | 330 | 7 | 3 | yes | 6 | 8.0 | Submersible Pump | — | 16.0 | 150.0 | Hybrid - Solar/Generator | IM30 | 30.0 | GPS-300-360 | 16.2 | fair | Pipelines rehabilitation | yes | Colorless and odorless | 35.5 | 8.1 | 2543.0 | 1261.0 | — | Communal | yes | 13/03/1990 | 7 | 0 | yes | 0.1 | yes | — | — | — | DRC | 13/02/2021 | 1. Installation of solar power | 1. Rehabilitation of pump and riser pipes. 2. Rehabilitation of pipelines. 3. Extension of pipelines. 4. Rehabilitation and reconstruction of elevated water tank. 5. Construction of new kiosks. 6. Fancing. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France