Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7215 Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Horkac cagaaran 1.3 Community 13/03/2017 Horkac BH 7.0533552 47.5178086 301.0 1 urban rural yes Yes 100 200 800 5.0 226.0 pvc 8.0 12.5 5.0 0.0 Concrete/Masonry tank 18.0 Galvanised Steel 500.0 1 2 no Submersible Pump Lowara 15.0 135.0 Generator Parkins 30.0 fair yes Colorless and odorless 31.5 7.91 2535.0 1257.0 Communal yes 14/03/2017 3 0 no yes World Bank 13/02/2021 1. Construction of animal troughts 2. Construction of one koisk. 3. Rehabilitation of generator room 4. Installation of generator and pump. 1. Installation of solar power. 2. Construction of new kiosks. 3. Construction caretaker room.
7873 Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Fardaharis ICNA 13/03/2021 Fardaharis BH 7.0487097 47.4276759 303.0 1 rural urban yes Yes 500 250 800 160.0 pvc 8.0 15.0 8.0 1.0 Concrete/Masonry tank 30.0 Galvanised Steel 50.0 1 2 no Submersible Pump 11.0 105.0 Hybrid - Solar/Generator Leateck 30.0 AS-60-28W 16.8 fair Shortage of koisks yes Colorless and odorless 30.8 7.8 2831.0 1409.0 Communal yes 13/03/2021 6 0 no no ICNA 13/03/2021 1. Installation of solar power. 1. Construction of koisks 2. Extension of pipelines 4. Rehabilitation generator. 5. Fancing. 6. Construction of animal troughts.
7253 Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Cagaaran WDA 13/03/1991 Cagaaran BH 1 7.0618805 47.4853827 279.0 3 rural urban yes Yes 17500 9000 100 15000 195.0 pvc 8.0 105.0 18.0 12.0 2.0 Concrete/Masonry tank 160.0 Galvanised Steel 2000.0 330 7 3 yes 6 8.0 Submersible Pump 16.0 150.0 Hybrid - Solar/Generator IM30 30.0 GPS-300-360 16.2 fair Pipelines rehabilitation yes Colorless and odorless 35.5 8.1 2543.0 1261.0 Communal yes 13/03/1990 7 0 yes 0.1 yes DRC 13/02/2021 1. Installation of solar power 1. Rehabilitation of pump and riser pipes. 2. Rehabilitation of pipelines. 3. Extension of pipelines. 4. Rehabilitation and reconstruction of elevated water tank. 5. Construction of new kiosks. 6. Fancing.
7190 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Kuwait Kuwait charity 12/03/2014 Kuwait BH 7.3939088 47.2250603 395.0 1 rural urban yes Yes 4200 1000 2000 155.0 pvc 8.0 16.7 18.0 3.0 Concrete/Masonry tank 64.0 PVC 2000.0 100 3 2 yes 20 8.0 Submersible Pump Lowara 11.0 142.0 Hybrid - Solar/Generator Parkins 45.0 DS7230M 17.34 fair yes Colorless and odorless 31.5 8.04 1838.0 912.5 Communal yes 12/03/2014 5 0 yes 0.05 yes NRC 12/03/2021 1. Construction of operator room. 1. Rehabilitation of pump and riser pipes and cables. 2. Fuel supporting. 3. Rehabilitation of animal troughts. 4. Rehabilitation and construction of koisks.
7189 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Laanmadow Community Laanmadow BH 7.3302253 47.2966161 354.0 1 urban rural yes Yes 950 1800 2200 0.0 pvc 8.0 12.0 Concrete/Masonry tank 20.0 Stainless Steel 2 2 yes 10 8.0 Submersible Pump 11.0 Hybrid - Solar/Generator Parkins 45.0 poor The operator of borehole has no good detail information about tha borehole and supplies. yes Colorless and odorless 29.9 7.61 1940.0 958.0 Communal no yes 0.05 yes 1. Fancing 2. Rehabilitation of kiosks 3. Rehabilitation of animal troughts
7204 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Carmo 3.0 Horseed water company 12/07/2019 Carmo borehole 3 10.5711623 49.0842369 644.0 5 rural urban yes Yes 1800 100 700 240.0 pvc 8.0 180.0 10.0 12.0 Concrete/Masonry tank 426.0 PVC 300 no Submersible Pump Lowara 234.0 Generator Perkins 45.0 good But the water is over salt. The borehole distribute water to the village so it is difficult to determine length of pipe line. yes Yellow color. Water is over salt. 26.7 7.28 4050.0 2020.0 Private-Public-Partnership yes 0.02 yes Horseed water company 16/07/2020 Cleaning of the borehole site. Installation of solar power system. Fencing.
7205 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Ceeldahir 1.5 Kuwait Government Ceeldahir borehole 2 10.6125246 49.0492388 623.0 2 rural urban yes Yes 900 150 1500 150.0 pvc 8.0 12.0 8.0 Concrete/Masonry tank 20.0 PVC 500.0 8 yes 3 9.0 Submersible Pump Lowara 132.0 Generator Eveco 30.0 fair The distribution pipe lines are disconnected. The yield of borehole is very low. no 26.3 7.65 3520.0 1770.0 Communal no yes 0.02 yes Community_e 25/11/2021 Replacement of main raising pipes and submersible pump. Solar power installation. Replacement of main raising pipes and submersible pump. Replacement of distribution pipe line.
7097 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Juurile Community_ 01/09/2016 Dhuur borehole 1 10.4176885 49.0949138 656.0 3 rural urban yes Yes 12000 800 4500 180.0 pvc 8.0 80.0 36.0 24.0 Concrete/Masonry tank 171.0 PVC 200.0 1 2 yes 70 9.0 Submersible Pump Lowara 150.0 Hybrid - Solar/Generator 2 generator, both are Perkins 100kva&50kva 150.0 JP-300M-72 YL365D-36b 25.6 good The borehole has a good yield which is equal 36 meter cubic per hour. The consumption of the borehole is water trucking. no 26.8 7.7 1400.0 700.0 Private/Individual yes 0.02 yes Community_e 18/07/2021 Replacement of main raising pipes and submersible pump. Replacement of main raising pipes and submersible pump Construction of caretaker room.
7183 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Laandheere 0.3 Community 12/03/2013 Laandheere BH 7.1810792 47.3584385 350.0 1 urban rural yes Yes 910 300 2500 0.0 180.0 pvc 8.0 10.0 10.0 3.0 Concrete/Masonry tank 13.0 Stainless Steel 500.0 7 4 2 yes 3 8.0 Submersible Pump 15.0 145.0 Hybrid - Solar/Generator IVECO 30.0 GD100_01G_4_PV 18.5 fair yes Colorless and odorless 29.3 7.72 2835.0 1405.0 Communal no yes 0.05 yes NRC 12/02/2021 1. Rehabilitation of pipes, koisks and animal throughts 2. Installation of solar power. 1.Construction of new elevated tank 2. Fancing of borehole.
7218 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Juurile 1.5 Former Somali Government 16/11/1986 Juurile borehole 10.3962938 49.0667047 682.0 2 rural urban yes Yes 1200 1500 5000 0.5 126.0 gi 6.0 117.0 10.0 12.0 Concrete/Masonry tank 120.0 Galvanised Steel 1700.0 8 2 yes 5 8.0 Submersible Pump Grundfos 126.0 Hybrid - Solar/Generator IVECO 32.0 SZYL-P325-36 24.7 poor The borehole has 3 water storage. two elevated water tank in the village and other one is located at the borehole site. The capacity of three tanks is 120 meter cubic. The pipe line connection b/n the village and borehole is been destroyed by floods. And the village has no water supply. Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. no 26.6 8.06 1740.0 865.0 Communal yes 17/09/2016 7 8 no yes NRC 13/11/2018 Installation of solar power system. Replacement of main raising pipes and submersible pump. Construction of two toilets. Widening of animal troughs. 1: Placement of pipe lines which distribute water to the village. 2: Replacement of main raising pipe lines and pump. 3: Construction of another borehole. 4: Construction of one elevated water tank.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors