Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7691 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Bari | iskushuban | Jeedal | 2.0 | UNICEF | 19/02/2022 | Jeedal borehole | — | 10.2112917 | 49.5234167 | 647.0 | — | 1 | — | rural urban | yes | — | Yes | — | — | — | — | — | — | — | 260.0 | pvc | 8.0 | — | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 25 | 8.0 | Submersible Pump | Lowara | — | 276.0 | Generator | Perkins | 45.0 | — | — | fair | No elevated water tank No animal troughs. No water points. | no | — | 33.0 | 8.2 | 1350.0 | 680.0 | — | Communal | no | — | — | — | yes | 0.015 | — | — | — | — | — | — | No intervention is performed, because the borehole is newer | This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon. Despite that they need the flowing intervention:- 1: Installation of solar power system,due to the increased fuel prices. 2: Water tank for the town supply. 3: Distribution pipes and kiosks for the settlement. | — | — |
7227 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Daarasalaam | — | Community | 13/03/2002 | Daarasalaam BH | — | 7.0814702 | 47.4922321 | 315.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 450 | — | 1500 | 0.0 | — | 170.0 | pvc | 8.0 | 56.0 | 16.6 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1500.0 | 250 | 5 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 108.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS572380M | 16.72 | good | — | yes | Colorless and odorless | 32.6 | 7.71 | 2470.0 | 1225.0 | — | Communal | yes | 13/03/2002 | 3 | 0 | yes | 0.05 | yes | — | — | — | NRC | 13/02/2021 | 1. Construction of new elevated tank 2. Construction of koisks | 1. Extension pipelines 2. Extension of solar power | — | — |
7873 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Fardaharis | — | ICNA | 13/03/2021 | Fardaharis BH | — | 7.0487097 | 47.4276759 | 303.0 | — | 1 | — | rural urban | yes | — | Yes | — | 500 | 250 | — | 800 | — | — | 160.0 | pvc | 8.0 | — | 15.0 | 8.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 50.0 | — | 1 | 2 | no | — | — | Submersible Pump | — | 11.0 | 105.0 | Hybrid - Solar/Generator | Leateck | 30.0 | AS-60-28W | 16.8 | fair | Shortage of koisks | yes | Colorless and odorless | 30.8 | 7.8 | 2831.0 | 1409.0 | — | Communal | yes | 13/03/2021 | 6 | 0 | no | — | no | — | — | — | ICNA | 13/03/2021 | 1. Installation of solar power. | 1. Construction of koisks 2. Extension of pipelines 4. Rehabilitation generator. 5. Fancing. 6. Construction of animal troughts. | — | — |
7943 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | Save the children | 13/02/2021 | Cagaraan BH | — | 7.0347377 | 47.4901695 | 284.0 | — | 2 | — | urban rural | yes | — | Yes | — | 700 | — | — | — | — | — | 180.0 | pvc | 8.0 | 95.0 | 25.0 | 12.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2500.0 | — | 4 | 2 | yes | 7 | 8.0 | Submersible Pump | — | 11.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 45.0 | PV800-4T30G | 30.0 | good | — | yes | Colorless and odorless | 35.2 | 8.05 | 2235.0 | 1115.0 | — | Communal | yes | 13/03/2021 | 3 | — | no | — | no | — | — | — | Save the children | 13/01/2021 | 1 . Installation of solar power | Fuel supporting. Rehabilitation pipelines | — | — |
8315 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Afar iridood | — | UNICEF | 13/02/2021 | Afar iridood BH | — | 6.9935791 | 47.3739121 | 312.0 | — | 1 | — | rural urban | yes | — | No | 1 month not functioning, needs observation of borehole | 1260 | — | — | — | — | — | 180.0 | pvc | 8.0 | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 50.0 | — | 2 | 2 | no | — | — | Submersible Pump | Lowara | 11.0 | 135.0 | Generator | CEOLMO | 30.0 | — | — | poor | Shortage of water supply. And borehole problemed. | no | — | — | — | — | — | — | Communal | yes | 13/02/2021 | 4 | 2 | no | — | no | — | — | — | — | — | — | 1. Emergency to solve this problem 2. Needs camera to observation borehole problem. | — | — |
7985 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Tuulo-xanan | 1.5 | Charity | 12/03/2020 | Tuulo xanan BH | — | 7.4177271 | 47.2246497 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | 92.0 | 7.5 | 10.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 1700.0 | 1 | 3 | 2 | no | — | — | Submersible Pump | — | 11.0 | 195.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 32.2 | 8.0 | 1870.0 | 928.0 | — | Communal | yes | 12/03/2021 | 5 | 0 | no | — | no | — | — | — | NRC | 12/03/2021 | 1. Construction of new elevated tank. | 1. Fuel supporting. 3. Installation of solar power. 4. Fancing. | — | — |
7608 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | bossaso | Carmo | 1.0 | Horseed water company | 20/05/2013 | Carmo borehole2 | — | 10.553322 | 49.0704519 | 670.0 | — | 4 | — | urban rural | yes | — | Yes | — | 2400 | 150 | — | — | — | — | 250.0 | pvc | 8.0 | 190.0 | 4.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | 600 | — | — | yes | 5 | 9.0 | Submersible Pump | Lowara | — | 195.0 | Hybrid - Solar/Generator | Perkins | 45.0 | SZYL-M330-36 | 16.5 | good | — | no | — | 32.0 | 7.3 | 2500.0 | 1240.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | no | — | — | — | Horseed water company | 11/06/2021 | Replacement of main pipes | Replacement of main raising pipes and submersible pump. Construction of animal water troughs. | — | — |
7097 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | qardho | Juurile | — | Community_ | 01/09/2016 | Dhuur borehole 1 | — | 10.4176885 | 49.0949138 | 656.0 | — | 3 | — | rural urban | yes | — | Yes | — | 12000 | 800 | — | 4500 | — | — | 180.0 | pvc | 8.0 | 80.0 | 36.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 171.0 | PVC | 200.0 | — | 1 | 2 | yes | 70 | 9.0 | Submersible Pump | Lowara | — | 150.0 | Hybrid - Solar/Generator | 2 generator, both are Perkins 100kva&50kva | 150.0 | JP-300M-72 YL365D-36b | 25.6 | good | The borehole has a good yield which is equal 36 meter cubic per hour. The consumption of the borehole is water trucking. | no | — | 26.8 | 7.7 | 1400.0 | 700.0 | — | Private/Individual | — | — | — | — | yes | 0.02 | yes | — | — | — | Community_e | 18/07/2021 | Replacement of main raising pipes and submersible pump. | Replacement of main raising pipes and submersible pump Construction of caretaker room. | — | — |
7188 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Bursaalax | — | Community | 12/03/2001 | Ceelcadde bursalaax BH | — | 7.1857728 | 47.2462594 | 355.0 | — | 7 | — | urban | yes | — | Yes | — | 3520 | — | — | — | — | — | 196.0 | pvc | 8.0 | — | 20.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 5000.0 | 520 | 5 | 3 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 168.0 | Hybrid - Solar/Generator | Parkins | 35.0 | SZYL_M350_36 | 25.0 | good | — | yes | Colorless and odorless | 29.5 | 8.21 | 2145.0 | 1003.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | ICRC | 12/03/2019 | Installation of solar power | 1. Construction of new elevated tank 2. Extension of pipelines to IDP. | — | — |
7250 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | galkayo | Roox | — | Community | 12/03/2016 | Roox BH | — | 7.2052439 | 47.4384682 | 341.0 | — | 2 | — | rural urban | yes | — | Yes | — | 4200 | 1500 | — | 2500 | — | — | 180.0 | pvc | 8.0 | — | 13.3 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 1300.0 | 30 | 6 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 150.0 | Hybrid - Solar/Generator | Doss | 30.0 | — | 19.6 | fair | — | yes | Colorless and odorless | 34.5 | 7.61 | 2350.0 | 1171.0 | — | Communal | yes | 12/03/2016 | 5 | 2 | yes | 0.05 | yes | — | — | — | NRC | 12/03/2020 | 1. Installation of solar power. 2. Rehabilitation of pump. | 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France