Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7184 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Kalabayr 0.2 Community 19/03/2011 Kalabayr BH 7.1906848 47.2928613 355.0 1 urban rural yes Yes 980 1650 2500 0.0 230.0 pvc 8.0 11.5 12.0 4.0 Concrete/Masonry tank 56.0 Galvanised Steel 1500.0 20 1 2 yes 7 8.0 Submersible Pump Lowara 15.0 216.0 Hybrid - Solar/Generator Parkins 45.0 GCNS_M36V390W 15.99 good yes Colorless and odorless 29.3 7.62 2550.0 1245.0 Communal yes 19/03/2012 5 0 yes 0.05 yes NRC 12/01/2021 1. Installation of solar power 2. Rehabilitation of koisks 3. Rehabilitation of pump and riser pipes 1. Fancing. 2. Rehabilitation of koisks and construction new koisks. 3. Rehabilitation of animal troughts. 4. Rehabilitation rooms. 5. Fuel supporting.
7189 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Laanmadow Community Laanmadow BH 7.3302253 47.2966161 354.0 1 urban rural yes Yes 950 1800 2200 0.0 pvc 8.0 12.0 Concrete/Masonry tank 20.0 Stainless Steel 2 2 yes 10 8.0 Submersible Pump 11.0 Hybrid - Solar/Generator Parkins 45.0 poor The operator of borehole has no good detail information about tha borehole and supplies. yes Colorless and odorless 29.9 7.61 1940.0 958.0 Communal no yes 0.05 yes 1. Fancing 2. Rehabilitation of kiosks 3. Rehabilitation of animal troughts
7188 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Bursaalax Community 12/03/2001 Ceelcadde bursalaax BH 7.1857728 47.2462594 355.0 7 urban yes Yes 3520 196.0 pvc 8.0 20.0 15.0 2.0 Concrete/Masonry tank 20.0 Galvanised Steel 5000.0 520 5 3 yes 2 8.0 Submersible Pump Lowara 11.0 168.0 Hybrid - Solar/Generator Parkins 35.0 SZYL_M350_36 25.0 good yes Colorless and odorless 29.5 8.21 2145.0 1003.0 Private/Individual yes 0.05 yes ICRC 12/03/2019 Installation of solar power 1. Construction of new elevated tank 2. Extension of pipelines to IDP.
7609 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Carmo 2.0 Horseed water company 22/05/2013 Carmo borehole1 10.5489725 49.0702793 665.0 4 urban yes Yes 3600 248.0 pvc 8.0 12.0 15.0 Galvanised Steel 600 no Submersible Pump Lowara Generator Perkins 45.0 fair All boreholes distribute water to 1 storage water tank. no 31.0 7.6 2400.0 1200.0 Private-Public-Partnership yes 0.026 Horseed water company 20/05/2021 Replacement of main raising pipes Solar Generator Pipes
7575 Borehole FGS Ministry of Energy and Water Resources March 12, 2022 Middle Shabelle jowhar Hanti Wadaag 2.0 Farjano 10/02/2000 Farjano 2.7762449 45.4995161 106.0 urban yes Yes 7855 100.0 gi 8.0 10.0 Concrete/Masonry tank 100.0 Galvanised Steel 50.0 1850 8 0 yes 10 15.0 Submersible Pump Grandfos 18.5 KW 60.0 60.0 Generator ALTERNATUER, LEROY - SOMER 180.0 poor The generator is old the Solar panels are not enough and the submersible pump is poor no Private-Public-Partnership yes 0.05 no GSA 12-Mar-22 Supply of Generator, Installation of submersible pump, Rehabilitation of Generator room and Rehabilitation of Elevated water tank Pipeline Extension
7608 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Carmo 1.0 Horseed water company 20/05/2013 Carmo borehole2 10.553322 49.0704519 670.0 4 urban rural yes Yes 2400 150 250.0 pvc 8.0 190.0 4.0 15.0 Concrete/Masonry tank PVC 600 yes 5 9.0 Submersible Pump Lowara 195.0 Hybrid - Solar/Generator Perkins 45.0 SZYL-M330-36 16.5 good no 32.0 7.3 2500.0 1240.0 Private-Public-Partnership yes 0.026 no Horseed water company 11/06/2021 Replacement of main pipes Replacement of main raising pipes and submersible pump. Construction of animal water troughs.
7932 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Ramaas PWASEN 12/03/2018 Ramaas BH 7.2135578 47.3402197 353.0 1 rural urban yes Yes 910 2000 9000 0.0 220.0 pvc 8.0 12.0 5.0 3.0 Concrete/Masonry tank 30.0 Stainless Steel 1200.0 35 4 2 no Submersible Pump Lowara 15.0 180.0 Generator Parkins 45.0 fair yes Colorless and odorless 29.8 7.51 2335.0 1157.0 Communal yes 12/03/2018 2 2 no no 1. Rehabilitation of pump and riser pipes 2. Installation of solar power 3. Rehabilitation of koisks 4. Construction of new elevated tank.
8308 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug galkayo Hadoodil 21/03/2004 Hadoodil BH 7.2353236 47.4007961 335.0 1 rural urban yes No 1 month, pump problem 2100 2000 8000 0.0 210.0 pvc 8.0 32.0 9.0 0.4 Concrete/Masonry tank 76.0 PVC 5000.0 150 2 3 no Submersible Pump 7.5 180.0 Generator Parkins 45.0 poor Absolutely poor no Communal yes 21/03/2007 3 2 NRC 12/03/2021 1. Construction of new elevated tank. 1. Installation of pump. 2. Installation of solar power. 3. Rehabilitation of animal troughts. 4. Construction of new kiosks. 5. Trucking pipe
7687 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Ceel daahir 1.3 Former Somali Government 08/07/1988 Ceel dahir borehole 1 10.6401232 49.0499791 603.0 2 rural urban yes Yes 1800 200 500 2.0 165.0 gi 8.0 16.0 46.0 14.0 Concrete/Masonry tank 154.0 PVC 1400.0 180 2 yes 10 10.0 Submersible Pump Lowara 90.0 Hybrid - Solar/Generator Perkins 33.0 16.45 good no 26.5 7.7 2120.0 1070.0 Communal no yes 0.016 KAALO Relief and Development 10/03/2021 Extenstion of solar panels 1: Extention of distribution pipe line in order to supply water to the village 2: Submersible pump 3: Construction of caretaker room
7250 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug galkayo Roox Community 12/03/2016 Roox BH 7.2052439 47.4384682 341.0 2 rural urban yes Yes 4200 1500 2500 180.0 pvc 8.0 13.3 15.0 3.0 Concrete/Masonry tank 20.0 Galvanised Steel 1300.0 30 6 2 yes 2 8.0 Submersible Pump Lowara 11.0 150.0 Hybrid - Solar/Generator Doss 30.0 19.6 fair yes Colorless and odorless 34.5 7.61 2350.0 1171.0 Communal yes 12/03/2016 5 2 yes 0.05 yes NRC 12/03/2020 1. Installation of solar power. 2. Rehabilitation of pump. 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors