Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7999 Spring Puntland Ministry of Energy Minerals and Water April 14, 2022 Sanaag laasqoray Buraan 1.0 Natural spring Kalgaal spring 10.2151925 48.7747194 917.0 5 rural yes Yes 600 8000 yes 8 9.0 fair No distribution pipes. Storage water tank. no 32.4 8.2 1786.0 905.0 Communal yes 25/07/2000 no no Community_e Cleaning. Construction of animal water troughs.
8073 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Adhicadeeye 0.5 IR 14/04/2017 Adhicaderye borehole 1 8.6727538 47.1509817 623.0 3 rural urban yes Yes 6000 1500 0 3000 0.0 70.0 pvc 8.0 60.0 20.0 9.0 0.0 0.0 Concrete/Masonry tank 60.0 PVC 1500.0 500 1 2 yes 12 9.0 Submersible Pump Luwara 11.0 60.0 Hybrid - Solar/Generator Perkins 50.0 PLM_250P 60 250.0 good The pipelines are very weak and need replacement no 32.0 7.4 1300.0 950.0 Communal no no no Somaliland MoWRD 14/04/2021 Replacement of water pump The generator is not working and need maintenance
7814 Dug Well Somaliland MoWRD April 14, 2022 Woqooyi Galbeed hargeisa Ceel Caanood 0.1 Anonymous Ceel Caanood Spring and Dug Well 9.9089369 44.5317974 837.0 0 rural yes No The spring is functional but the dug well has not functioning becouse it has no any infrustructure and the spring dominate its function becouse people prefer the easy access water. 0 0 0 0 0.0 7.0 3.0 0.0 0.0 0.0 0.0 0 0 0 no No supply system at all no 32.0 7.1 4200.0 2900.0 Other no no No intervention required
8314 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Canjiid 1.0 Diaspora 20/09/2021 Canjiid borehole 8.5964443 47.2595059 634.0 1 urban rural yes No The pump is not functioning and not puming the water. It stopped working one day before we visited the borehole 1800 900 0 2400 0.0 180.0 pvc 8.0 160.0 20.0 8.0 0.0 0.0 Concrete/Masonry tank 6.0 Galvanised Steel 40.0 0 1 2 yes 15 8.0 Submersible Pump Luwara 11.0 140.0 Solar BYD400MIK-36 400.0 good The supply system is not working and stopped yesterday. One day before field vist. It Needs urgent intervention no Communal no no no It is required investigation on the system from the pump to the solar system
8139 Dug Well Somaliland MoWRD April 14, 2022 Sool las_caanood Adhicadeeye 0.0 Community 14/04/2022 Adhicadeeye dug well 8.6749213 47.1585749 626.0 1 rural urban yes Yes 2500 300 0 1700 0.0 1.0 0.5 10.0 8.0 Concrete/Masonry tank 8.0 Galvanised Steel 1300.0 40 6 6 yes 8 9.0 Submersible Pump Luwara 7.5 1.0 Solar Photovoltiac 250.0 good Good condition no 30.0 7.0 1000.0 830.0 Communal no no no CARE Somalia 14/04/2016 Extension of pipelines, water tank and poor fence It is required complete innovation of the borehole. The borehole surface water very diry and community fetch this bad water. Therefore it is required reconstruction of the borehole
8048 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Yigoori 8.0 Private 14/04/2017 Ina dirawal borehole 8.7312254 47.032603 623.0 4 rural yes Yes 500 1408 0 4200 3.0 71.0 pvc 8.0 20.0 18.0 10.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 600.0 0 1 3 yes 4 8.0 Submersible Pump Ground fost 5.5 65.0 Solar M2 200.0 good The system is ok no 31.0 7.0 1400.0 1620.0 Private/Individual no no Private 14/04/2021 Pipelines changed from steel to plastic onces Generator is required because solar do not work enough all time. And there are many rural people who depend on this private borehole
8011 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Yigoori 8.0 UNICEF 14/04/2018 Sixawle 5 8.7209838 47.0279152 633.0 4 rural urban yes Yes 5000 600 0 3000 0.0 70.0 pvc 8.0 20.0 24.0 9.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 1200.0 50 1 5 yes 10 Submersible Pump Groundfost 25.0 65.0 Hybrid - Solar/Generator Perkins 45.0 M2 320.0 good Good condition no 30.0 8.2 1650.0 1020.0 Communal yes 14/04/2018 8 0 no no The 4 and 5 boreholes are interconnected so they more strong solar system and pipelines
7889 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo wisil 0.05 former government of somalia 10/12/1985 wisil BH 5.4276117 48.1207721 149.0 0 rural urban yes Yes 1250 580 216.0 pvc 6.0 17.0 Concrete/Masonry tank 30.0 Galvanised Steel 350.0 400 0 0 Submersible Pump kebrari(17HP) 116.0 Generator Doutz 40.0 poor 1. not have solar system 2. not have enough water tanks no 33.0 7.68 2640.0 1840.0 2020-01-13
8002 Borehole Somaliland MoWRD April 13, 2022 Woqooyi Galbeed hargeisa Jaleelo 0.6 SPI 09/06/2011 SPI borehole 9.7512854 44.2690525 1010.0 0 yes Yes 0 0 0 0 0.0 105.0 gi 8.0 38.0 64.0 20.0 0.0 0.0 Concrete/Masonry tank 0.0 PVC 0.0 0 0 0 no Submersible Pump Grundfos 64.0 93.0 Hybrid - Solar/Generator good Good no 31.0 7.07 1730.0 1200.0 Private/Individual no no SPI is responsible for this boreholes and its intervention.
8291 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo Gawan 3.0 gawaan 2 5.3183146 48.3285865 92.0 0 rural no 3 Abandoned it dries out for water shortage 210.0 pvc 6.0 Steel tank 0.0 Galvanised Steel 45.0 0 0 0 No Pump poor no 0.0

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France

Donors