Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7347 Borehole Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag ceerigaabo Buraan 0.5 Kanoko 01/01/1988 Buraan borehole 1 10.2111741 48.7745235 942.0 5 rural urban yes Yes 4500 300 500 36.0 pvc 8.0 7.0 4.0 8.0 1.0 Galvanised Steel 300 1 4 yes 8 8.0 Submersible Pump 34.0 Hybrid - Solar/Generator Perkins 33.0 DS60250W 9.0 fair Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes Both boreholes works same hours which is equal 8+8 = 16 hours. no 31.9 7.4 1581.0 775.0 Communal yes 25/05/1989 4 2 yes 0.03 yes ACTED 26/08/2020 Construction of 1 room Generator Rehabilitation of 3 solar panels. Construction of storage water tank. Replacement of main raising pipes and submersible pump. 1: Amergency replacement of main raising pipes and submersible pump 2: Generator. 3: Replacement of rusted distribution pipes 4: Construction of 1 elevated water tank. 5: Solar power storage (battery).
7898 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug galkayo wisil 1.4 Community wisil 2 5.4189303 48.1236662 157.0 0 rural urban yes Yes 1400 600 17000 130.0 pvc 8.0 Concrete/Masonry tank 16.0 Galvanised Steel 650 2 3 Submersible Pump ATX(7.5HP) 95.0 Generator perkin 30.0 no 31.0 7.56 2570.0 1280.0 no
7897 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo wargalo 0.5 GSA 10/12/2017 wargalo BH 6.267016 47.5167909 208.0 1 rural yes Yes 7500 4800 71000 200.0 pvc 8.0 17.5 16.0 Concrete/Masonry tank 70.0 Galvanised Steel 360.0 230 1 2 yes 8 9.0 Submersible Pump frangin 165.0 Hybrid - Solar/Generator perkin 30.0 380w 24.0 fair no 27.7 7.6 2570.0 1790.0 Communal IRC solar 2017-07-14
7902 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo wisil 0.5 ICRC 10/12/2007 wisil 3 5.4455081 48.1367017 147.0 0 rural urban yes Yes 3650 300 15000 212.0 pvc 8.0 16.0 Concrete/Masonry tank 36.0 Galvanised Steel 145.0 250 1 3 yes 4 10.0 Submersible Pump grunfos 195.0 Hybrid - Solar/Generator perkin 40.0 300w 21.0 no 33.2 7.39 2540.0 1760.0 Communal yes 4 1 GSA store house & water tank 2020-05-12
8009 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug galkayo Docol 0.1 DIRECTIAD 08/09/2019 Docol BH 6.4326117 47.4920417 238.0 0 rural yes Yes 8100 1400 52000 200.0 pvc 8.0 50.0 14.0 Concrete/Masonry tank 38.0 Galvanised Steel 360.0 506 1 3 yes 20 11.0 Submersible Pump ATX 118.0 Generator perkin 45.0 poor no 30.4 7.86 1650.0 1130.0 Communal yes 2 1 IMC solar
7828 Borehole Somaliland MoWRD April 13, 2022 Sool las_caanood Laascaanood 5.0 Somaliland MoWRD 01/01/2017 Nugal borehole 2 8.5056211 47.4056216 626.0 6 urban yes Yes 25000 70.0 pvc 8.0 40.0 70.0 12.0 0.0 0.0 Concrete/Masonry tank 300.0 Galvanised Steel 6000.0 3000 0 0 yes 70 9.0 Submersible Pump Grounnfunds 7.5 30.0 Generator Unknown good Very complicated supply system no 30.0 7.2 3800.0 1500.0 Private/Individual
8046 Dug Well Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo Hadiile 0.2 Community Hadiile sw 5.9543931 47.9980379 133.0 3 rural yes Yes 400 5000 19000 20.0 17.4 9.0 Other 0.0 Other 0.0 0 0 1 no No Pump poor this source is not protected , dogs drink water after human being left at night timem no 29.8 8.3 1410.0 1000.0 Communal 0
8000 Spring Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag ceerigaabo Buraan 0.2 Natutal spring. buraan spring 10.2156437 48.7741451 915.0 5 urban rural yes Yes 6000 1000 1 yes 3 8.0 fair No water kiosks No distribution pipes no 32.4 7.2 1786.0 905.0 no no Community_e 17/04/2016 Cleaning of the spring site 1: Rehabilitation of animal water troughs.
7831 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo CEELGULA 0.15 GSA 11/12/2011 Ccelgula BH 6.0131567 47.857295 134.0 0 rural urban yes Yes 3700 35000 230.0 pvc 8.0 20.0 16.0 Concrete/Masonry tank 16.0 Galvanised Steel 850.0 700 1 3 yes 6 14.0 Submersible Pump ATX 190.0 Generator perkin 45.0 no 32.3 7.46 3750.0 2600.0 IMC store house
8779 Borehole Somaliland MoWRD April 13, 2022 Woqooyi Galbeed hargeisa Jaleelo 1.5 European union 12/11/2009 Jaleelo dug well 9.766099 44.2920881 971.0 0 yes Yes no

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors