Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7169 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Ceelbuh | 0.5 | Former Somali Government | 11/05/1980 | Ceelbuh borehole A1 | — | 10.2248119 | 48.3117092 | 1082.0 | — | 5 | — | urban rural | yes | — | No | 20/ 12/ 2021 The problem is pump and main raising pipes. | 6000 | 400 | — | 3000 | — | — | 194.0 | gi | 6.0 | 80.0 | 5.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | PVC | — | — | 2 | 2 | yes | 8 | 8.0 | Submersible Pump | Grundfos | — | 192.0 | Generator | Perkins | 30.0 | — | — | poor | The borehole is not functioning. | no | — | — | — | — | — | — | Communal | yes | 26/08/2015 | 3 | 2 | yes | 0.15 | yes | — | — | — | DRC - Puntland | 22/11/2010 | 1: Supplied pump, pipes, and generator 2: Construction of two water kiosks. 3: Construction of generator room. | 1: Amergency replacement of main raising pipes and submersible pump 2: Generator 3: solar 4: Electric cable | — | — |
8738 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.1 | Hargeisa Water Agents | 08/07/2013 | K10.2 borehole | — | 9.7927707 | 43.999241 | 1041.0 | — | 0 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | gi | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | — | — | — | — | no | — | — | Submersible Pump | — | — | — | Electricity Grid | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7593 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.1 | China | 30/04/1970 | K4 borehole | — | 9.7642106 | 43.9813575 | 1075.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 155.81 | gi | 8.0 | 34.0 | 45.0 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Galvanised Steel | 0.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Grundfos | 45.0 | 59.0 | Electricity Grid | — | — | — | — | fair | Supply system is fair | no | — | 29.2 | 6.9 | 455.0 | 505.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | No intervention | — | — |
7590 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 30.0 | China | 29/10/1982 | K7 borehole | — | 9.7943255 | 43.9631378 | 3811.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 203.0 | gi | 8.0 | 48.0 | 47.7 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Franklin | 47.7 | 58.0 | Electricity Grid | — | — | — | — | fair | The condition of the supply system is fair | no | — | 30.1 | 7.34 | 900.0 | 450.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | No intervention carried out | — | — |
7159 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Ceelbuh | 3.0 | Horn relief | 17/08/1996 | Ceelbuh borehole 2 | — | 10.2362327 | 48.3108071 | 1087.0 | — | 5 | — | urban rural | yes | — | Yes | — | 900 | 800 | — | 2000 | — | — | 252.0 | gi | 8.0 | 226.0 | 12.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 47.0 | Galvanised Steel | — | — | 1 | 4 | yes | 5 | 9.0 | Submersible Pump | — | — | 241.0 | Hybrid - Solar/Generator | Perkins | 50.0 | GPS-300-360 | 17.28 | — | — | no | — | 32.6 | 7.3 | 2230.0 | 1118.0 | — | Communal | yes | 25/09/2006 | 3 | 2 | yes | 0.05 | yes | — | — | — | ACTED | 26/09/2020 | Borehole equipment and installation work. Construction of elevated water tank. Construction of generator house. Construction of two animal water troughs. Solar. Construction of water kiosks. Rehabilitation of two animal water troughs. | 1: Amergency replacement of main raising pipes and submersible pump 2: Replacement of electric cable. 3: Replacement of rusted distribution pipes. 4: Generator 5: Solar power storage ( battery) | — | — |
7483 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.1 | Arab funded | 11/04/2017 | K3.2 borehole | — | 9.7715334 | 43.9704239 | 1013.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 91.0 | gi | 8.0 | 20.0 | 39.7 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | — | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Capriri | 39.0 | 42.0 | Electricity Grid | — | — | — | — | fair | Fair supply system | no | — | 30.5 | 8.2 | 695.0 | 360.0 | — | Communal | no | — | — | — | yes | 0.06 | no | — | — | — | — | 02/04/2022 | — | No intervention required | — | — |
7588 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 30.0 | China | 02/11/1984 | K9 borehole | — | 9.7886208 | 43.994276 | 1051.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 154.0 | gi | 8.0 | 57.7 | 33.8 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Capriri | 33.0 | 69.0 | Electricity Grid | — | — | — | — | fair | The condition of the supply system is fair | no | — | 33.0 | 7.7 | 1250.0 | 560.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | HWA is responsible its intervention | — | — |
8159 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 11, 2022 | Mudug | galkayo | doogle | 0.5 | — | — | ceel doogle | — | 6.7252693 | 47.4720687 | 303.0 | — | 0 | — | urban rural | yes | — | Yes | — | 2000 | 7000 | 280 | — | — | — | 232.0 | pvc | 9.0 | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 320.0 | Galvanised Steel | 125.0 | 32 | 2 | 3 | yes | 2 | — | Submersible Pump | grunfos | — | 114.0 | Hybrid - Solar/Generator | perkin | 45.0 | 260w | 15.0 | poor | 1. not water supply supply system 2. not have enough yield for leaching pump pipes | no | — | 29.5 | 7.95 | 800.0 | 521.0 | — | — | — | — | — | — | — | — | — | — | — | — | IOM | solar | — | 2019-06-09 | — | — |
7162 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Degmo khayr | 6.0 | UNICEF | 23/03/2019 | Dawoco borehole | — | 10.2171625 | 48.0314842 | 1093.0 | — | 1 | — | rural urban | yes | — | Yes | — | 4200 | 150 | — | 6000 | — | — | 330.0 | pvc | 8.0 | 310.0 | 14.0 | 11.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 5652.0 | 1 | 3 | 2 | yes | 3 | 9.0 | Submersible Pump | — | — | 252.0 | Hybrid - Solar/Generator | Perkins | 45.0 | — | — | — | — | no | — | 32.5 | 7.3 | 3570.0 | 1785.0 | — | Communal | yes | 16/02/2021 | 5 | 2 | yes | 0.03 | yes | — | — | — | IRC | 12/02/2021 | Solar | 1: Amergency replacement of main raising pipes and submersible pump. 2: Replacement of distribution pipe lines 3: Construction of another animal water troughs. 4: Construction of generator room. 5: Construction of another borehole due to water demand. 6: Solar power storage( battery) | — | — |
7117 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Ceel buh | 0.5 | Kuwait Government | 11/06/2012 | Biyacase borehole | — | 10.221375 | 48.3119259 | 1069.0 | — | 5 | — | rural urban | yes | — | Yes | — | 6000 | 1200 | 50 | 4000 | — | — | 270.0 | gi | 8.0 | 225.0 | 4.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | — | — | 2 | 3 | yes | 4 | 8.0 | Submersible Pump | — | — | 253.0 | Hybrid - Solar/Generator | Perkins | 30.0 | — | — | fair | The area is over population and there is a high water demand | no | — | 32.8 | 7.1 | 2000.0 | 1000.0 | — | Communal | yes | 13/06/2017 | 5 | 2 | yes | 0.1 | yes | — | — | — | Community_e | 13/04/2018 | Replacement of submersible pump. | 1: Amergency replacement of main raising pipes and submersible 2: Replacement of rusted distrubution pipe lines. 3: Construction of caretaker room. 4: Generator 5: Construction of another borehole due to water demand on the environment | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France