Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7749 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 11, 2022 | Mudug | galkayo | howl wadaag | 2.0 | Abdul Jamac | 09/05/2011 | Carafaat 3 | — | 6.737805 | 47.4532033 | 303.0 | — | 2 | — | rural urban | yes | — | Yes | — | 40000 | — | — | — | — | — | 240.0 | pvc | 8.0 | — | 66.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 380.0 | Galvanised Steel | 458.0 | 39000 | — | — | yes | — | — | Submersible Pump | lowara | — | 150.0 | Hybrid - Solar/Generator | EVECO | 200.0 | — | — | — | — | no | — | 30.6 | 7.65 | 4500.0 | 2230.0 | — | Private/Individual | — | — | — | — | yes | 0.002 | — | — | — | — | Agency not specified | tank | SDRO | — | — | — |
7098 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Xubeera | 3.0 | Kuwait Government | 25/08/2014 | Xubeera borehole 2 | — | 10.669785 | 48.4850717 | 901.0 | — | 2 | — | urban rural | yes | — | No | 1/14/2022 The reason is generator has stopped functioning. | 3600 | 300 | 100 | 1500 | — | — | 370.0 | gi | 8.0 | 130.0 | 12.0 | 10.0 | — | 0.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | — | — | 1 | 4 | yes | 2 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 30/12/2015 | 6 | 2 | yes | 0.02 | yes | — | — | — | ADESO | 26/06/2017 | Replacement of main raising and submersible pump. Construction of 1 water kiosks. Construction of toilet. | 1: Amergency replacement of main raising pipes and submersible pump 2: Solar with battery. 3: Construction of top roof of storage water tank. 4: fuel | — | — |
7351 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Qarqora | 0.4 | GSA | 07/11/2009 | Qarqora | — | 6.740379 | 47.7011535 | 274.0 | — | 0 | — | rural | yes | — | Yes | — | 15000 | 700 | — | 60000 | — | — | 240.0 | pvc | 10.0 | — | 18.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 187.0 | 180 | 1 | 3 | yes | 6 | 9.0 | Submersible Pump | not specified | — | 138.0 | Hybrid - Solar/Generator | perkin | 30.0 | 300 | 24.0 | poor | — | no | — | 26.7 | 7.86 | 3760.0 | 1875.0 | — | — | — | — | — | — | yes | 0.0045 | yes | — | — | — | Agency not specified | store house | MFA | — | — | — |
8015 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Rasan | 2.5 | Direct Aid | 10/04/2021 | Rasan | — | 6.6224461 | 47.6490178 | 250.0 | — | 0 | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 235.0 | pvc | 8.0 | — | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 245.0 | 0 | 1 | 3 | yes | 25 | 12.0 | Submersible Pump | lowara | — | 180.0 | Hybrid - Solar/Generator | perkin | 30.0 | 400w | 30.0 | poor | — | no | — | 33.7 | 7.5 | 1600.0 | 1120.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7106 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Baran | — | SRCS | 26/08/2014 | Qorof borehole | — | 10.7053494 | 48.4147012 | 978.0 | — | 2 | — | rural urban | yes | — | No | 17/ 9/ 2021 The reason is pump has stopped the functioning. | 9000 | 600 | — | 1500 | — | — | 352.0 | pvc | 8.0 | — | 20.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 48.0 | Galvanised Steel | — | — | 1 | 2 | yes | 20 | 9.0 | Submersible Pump | — | — | 300.0 | Hybrid - Solar/Generator | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | no | — | — | — | yes | 0.026 | yes | — | — | — | — | 26/06/2020 | Solar. Replacement of submersible pump. | 1: Amergency replacement of main raising pipes and submersible pump. 2: Amergency construction of another boreholes due to lack of water in baran district 3: Replacement of electric cable 4: Construction of caretaker room. 5: Solar power storage ( battery) | — | — |
8019 | — | Dug Well | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Dhoobocade | 1.0 | Community | — | dhobocade sw | — | 6.6320073 | 47.6070084 | 245.0 | — | 0 | — | rural | yes | — | Yes | — | 900 | 3500 | — | 36000 | — | — | — | — | — | — | — | — | — | — | 20.0 | 8.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.0 | Galvanised Steel | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | no | no | — | 32.6 | 8.19 | 1590.0 | 1110.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — |
7995 | — | Borehole | Somaliland MoWRD | April 10, 2022 | Sool | las_caanood | Xidhxidh | 2.0 | EKIM TURKEY | 10/02/2020 | Xidhxidh | — | 8.3548402 | 46.9725159 | 758.0 | — | 1 | — | rural urban | yes | — | Yes | — | 40000 | 14000 | 100 | 20000 | 0.0 | — | 510.0 | pvc | 8.0 | 420.0 | 9.6 | 20.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 60.0 | 8000 | 1 | 5 | yes | 35 | 8.0 | Submersible Pump | Liwara | 18.0 | 420.0 | Hybrid - Solar/Generator | Perkins | 60.0 | Photovoltiac | 390.0 | good | The supply system is good | no | — | 37.0 | 7.5 | 1800.0 | 870.0 | — | Communal | yes | 10/04/2020 | 4 | 0 | no | — | no | — | — | — | USAID | 04/01/2022 | Solar integration, construction of animal troughs and fencing | The borehole requires sports for the generator and pipelines.if one pipe breaks no spare part available there. | — | — |
8013 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Bitaale | 0.1 | former government of somalia | 06/09/1986 | Bitaale | — | 6.705377 | 47.8340365 | 190.0 | — | 0 | — | rural | yes | — | Yes | — | 3800 | 8000 | — | — | 1.5 | — | 230.0 | pvc | 10.0 | — | — | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 380.0 | 300 | 1 | 2 | yes | 7 | 9.0 | Submersible Pump | lowara | — | 130.0 | Generator | Doutz | 30.0 | — | — | poor | — | no | — | 35.3 | 7.57 | 1620.0 | 820.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | IOM | small water tank | — | — | — | — |
7066 | — | Borehole | FGS Ministry of Energy and Water Resources | April 10, 2022 | Lower Juba | afmadow | DOBLEY | 5.0 | Agency not specified | 10/12/2016 | Ceel solar (Danwadag( | — | 0.422263 | 41.0244212 | 34.0 | — | 1 | — | rural urban | yes | — | Yes | — | 5000 | 20 | 50 | 30 | 0.0 | — | 240.0 | pvc | 8.0 | 55.0 | 60.0 | 12.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 20.0 | 4994 | 1 | 0 | yes | 25 | 75.0 | Submersible Pump | — | 60.0 | 50.0 | Generator | — | — | — | — | good | Needs rehabilitation of the tanks and solar needs ti be empower | no | — | — | — | — | — | — | Communal | yes | 10-Feb-17 | 4 | 0 | yes | 5 | yes | — | — | — | CARE Somalia | — | Tanks | Tanks, currently uses generator but need to empower the solar system to reduce fuel consumption | — | — |
7536 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Hadaftimo | 4.0 | Al manhal charitable organization | 17/07/2009 | Hadaaftimo borehole 1 | — | 10.7433336 | 48.110193 | 1286.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 1000 | 500 | 6000 | 1.0 | — | 357.0 | pvc | 8.0 | 220.0 | 12.0 | 16.0 | — | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 62.0 | Galvanised Steel | 150.0 | — | 2 | 3 | yes | 6 | 8.0 | Submersible Pump | Lowara | — | 315.0 | Hybrid - Solar/Generator | Perkins | 60.0 | GPS-300-360 | 25.92 | fair | The borehole needs amergency replacement of pump and main raising pipes. The storage water tanks are old and makes water leaking. | no | — | 32.1 | 7.4 | 1419.0 | 707.0 | — | Communal | yes | 22/09/2018 | 3 | 2 | yes | 0.05 | no | — | — | — | NRC | 16/04/2020 | 1: Solar power system. 2: Rehabilitation of elevated water tank. 3: Construction of animal water troughs. 4: Replacement of main raising pipes and submersible pump. | 1: Amergrncy construction of another borehole due to water demand 2: Amergency replacement of main raising pipes and submersible pump. 3: Replacement of electric cable. 4: Replacement of solar inverter. 5: Assessment of borehole yield in order to get problem related borehole yield reduction. 6: Construction of elevated water tank. 7: Generator and solar power storage ( battery) | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France