Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7231 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Farah geedi | 1.0 | DIRRCTAID | 09/02/2016 | ceelfarah geedi | — | 6.69753 | 47.521045 | 226.0 | — | 0 | — | rural | yes | — | Yes | — | 10000 | 700 | 250 | 2500 | 1.5 | — | 240.0 | pvc | 8.0 | — | 28.0 | 11.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 160.0 | 200 | 1 | 3 | yes | 20 | 11.0 | Submersible Pump | granfos | — | 130.0 | Solar | — | — | gps | 24.0 | poor | 1. the Motor is stoped 2. the water tank is very small. | no | — | 32.8 | 7.7 | 1600.0 | 830.0 | — | Communal | yes | — | 3 | 2 | yes | 0.0045 | yes | — | — | — | IRC | solar | — | — | — | — |
7098 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Xubeera | 3.0 | Kuwait Government | 25/08/2014 | Xubeera borehole 2 | — | 10.669785 | 48.4850717 | 901.0 | — | 2 | — | urban rural | yes | — | No | 1/14/2022 The reason is generator has stopped functioning. | 3600 | 300 | 100 | 1500 | — | — | 370.0 | gi | 8.0 | 130.0 | 12.0 | 10.0 | — | 0.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | — | — | 1 | 4 | yes | 2 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 30/12/2015 | 6 | 2 | yes | 0.02 | yes | — | — | — | ADESO | 26/06/2017 | Replacement of main raising and submersible pump. Construction of 1 water kiosks. Construction of toilet. | 1: Amergency replacement of main raising pipes and submersible pump 2: Solar with battery. 3: Construction of top roof of storage water tank. 4: fuel | — | — |
7994 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | bandarqali | 1.0 | — | — | Bandarqali | — | 6.6250625 | 47.851633 | 231.0 | — | 0 | — | rural urban | yes | — | Yes | — | 2400 | — | — | — | — | — | 250.0 | pvc | 9.0 | — | 20.0 | 9.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 52.0 | Galvanised Steel | 230.0 | 300 | 1 | 3 | yes | 6 | 10.0 | Submersible Pump | franglin | — | 180.0 | Solar | — | — | gps 330 | 24.0 | poor | poor water supply system | no | — | 30.8 | 7.66 | 1800.0 | 910.0 | — | Communal | yes | — | — | — | — | — | — | — | — | — | IRC | solar | — | — | — | — |
7536 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Hadaftimo | 4.0 | Al manhal charitable organization | 17/07/2009 | Hadaaftimo borehole 1 | — | 10.7433336 | 48.110193 | 1286.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 1000 | 500 | 6000 | 1.0 | — | 357.0 | pvc | 8.0 | 220.0 | 12.0 | 16.0 | — | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 62.0 | Galvanised Steel | 150.0 | — | 2 | 3 | yes | 6 | 8.0 | Submersible Pump | Lowara | — | 315.0 | Hybrid - Solar/Generator | Perkins | 60.0 | GPS-300-360 | 25.92 | fair | The borehole needs amergency replacement of pump and main raising pipes. The storage water tanks are old and makes water leaking. | no | — | 32.1 | 7.4 | 1419.0 | 707.0 | — | Communal | yes | 22/09/2018 | 3 | 2 | yes | 0.05 | no | — | — | — | NRC | 16/04/2020 | 1: Solar power system. 2: Rehabilitation of elevated water tank. 3: Construction of animal water troughs. 4: Replacement of main raising pipes and submersible pump. | 1: Amergrncy construction of another borehole due to water demand 2: Amergency replacement of main raising pipes and submersible pump. 3: Replacement of electric cable. 4: Replacement of solar inverter. 5: Assessment of borehole yield in order to get problem related borehole yield reduction. 6: Construction of elevated water tank. 7: Generator and solar power storage ( battery) | — | — |
7106 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Baran | — | SRCS | 26/08/2014 | Qorof borehole | — | 10.7053494 | 48.4147012 | 978.0 | — | 2 | — | rural urban | yes | — | No | 17/ 9/ 2021 The reason is pump has stopped the functioning. | 9000 | 600 | — | 1500 | — | — | 352.0 | pvc | 8.0 | — | 20.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 48.0 | Galvanised Steel | — | — | 1 | 2 | yes | 20 | 9.0 | Submersible Pump | — | — | 300.0 | Hybrid - Solar/Generator | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | no | — | — | — | yes | 0.026 | yes | — | — | — | — | 26/06/2020 | Solar. Replacement of submersible pump. | 1: Amergency replacement of main raising pipes and submersible pump. 2: Amergency construction of another boreholes due to lack of water in baran district 3: Replacement of electric cable 4: Construction of caretaker room. 5: Solar power storage ( battery) | — | — |
7993 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | bilaale | 0.5 | ICRC | 09/02/2011 | bitaale 2 | — | 6.7053621 | 47.8377885 | 229.0 | — | 0 | — | rural | yes | — | Yes | — | 1200 | 7800 | 3550 | 55000 | — | — | 206.0 | pvc | 9.0 | — | 16.0 | 19.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 200.0 | 150 | 1 | 3 | yes | 8 | 12.0 | Submersible Pump | granfos | — | 180.0 | Hybrid - Solar/Generator | perkin | 30.0 | 300w | 21.0 | poor | — | no | — | 36.7 | 7.28 | 1800.0 | 930.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | IMC | water tank | — | 2021-02-08 | — | — |
8015 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Rasan | 2.5 | Direct Aid | 10/04/2021 | Rasan | — | 6.6224461 | 47.6490178 | 250.0 | — | 0 | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 235.0 | pvc | 8.0 | — | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 245.0 | 0 | 1 | 3 | yes | 25 | 12.0 | Submersible Pump | lowara | — | 180.0 | Hybrid - Solar/Generator | perkin | 30.0 | 400w | 30.0 | poor | — | no | — | 33.7 | 7.5 | 1600.0 | 1120.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8013 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Bitaale | 0.1 | former government of somalia | 06/09/1986 | Bitaale | — | 6.705377 | 47.8340365 | 190.0 | — | 0 | — | rural | yes | — | Yes | — | 3800 | 8000 | — | — | 1.5 | — | 230.0 | pvc | 10.0 | — | — | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 380.0 | 300 | 1 | 2 | yes | 7 | 9.0 | Submersible Pump | lowara | — | 130.0 | Generator | Doutz | 30.0 | — | — | poor | — | no | — | 35.3 | 7.57 | 1620.0 | 820.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | IOM | small water tank | — | — | — | — |
7968 | — | Spring | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Baran | 0.7 | Natural well | — | Baran well | — | 10.7085372 | 48.3352056 | 1026.0 | — | 2 | — | rural urban | yes | — | Yes | — | 24000 | 2000 | — | 4000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 20 | 9.0 | — | — | — | — | — | — | — | — | — | fair | No water kiosks. No distribution pipe lines. No storage tank. During the drought seasons the water of the well become very low and has no water trucking. | no | — | 32.2 | 7.5 | 2000.0 | 1004.0 | — | — | — | — | — | — | no | — | no | — | — | — | Community_e | 22/08/2021 | Cleaning. | 1: Animal water troughs. 2: Amergency construction of another boreholes, now the community uses water trucking from another city which far from baran to 50KM | — | — |
7813 | — | Dug Well | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | ceelweyne | 0.4 | Community | — | ceelweyne | — | 6.6219878 | 47.6377517 | 248.0 | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 18.0 | 11.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Galvanised Steel | — | 0 | 0 | 0 | — | — | — | No Pump | — | — | — | — | — | — | — | — | poor | no | no | — | 35.4 | 8.12 | 4250.0 | 2100.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France