Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7184 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Kalabayr | 0.2 | Community | 19/03/2011 | Kalabayr BH | — | 7.1906848 | 47.2928613 | 355.0 | — | 1 | — | urban rural | yes | — | Yes | — | 980 | 1650 | — | 2500 | 0.0 | — | 230.0 | pvc | 8.0 | — | 11.5 | 12.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 56.0 | Galvanised Steel | 1500.0 | 20 | 1 | 2 | yes | 7 | 8.0 | Submersible Pump | Lowara | 15.0 | 216.0 | Hybrid - Solar/Generator | Parkins | 45.0 | GCNS_M36V390W | 15.99 | good | — | yes | Colorless and odorless | 29.3 | 7.62 | 2550.0 | 1245.0 | — | Communal | yes | 19/03/2012 | 5 | 0 | yes | 0.05 | yes | — | — | — | NRC | 12/01/2021 | 1. Installation of solar power 2. Rehabilitation of koisks 3. Rehabilitation of pump and riser pipes | 1. Fancing. 2. Rehabilitation of koisks and construction new koisks. 3. Rehabilitation of animal troughts. 4. Rehabilitation rooms. 5. Fuel supporting. | — | — |
7218 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | qardho | Juurile | 1.5 | Former Somali Government | 16/11/1986 | Juurile borehole | — | 10.3962938 | 49.0667047 | 682.0 | — | 2 | — | rural urban | yes | — | Yes | — | 1200 | 1500 | — | 5000 | 0.5 | — | 126.0 | gi | 6.0 | 117.0 | 10.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 120.0 | Galvanised Steel | 1700.0 | — | 8 | 2 | yes | 5 | 8.0 | Submersible Pump | Grundfos | — | 126.0 | Hybrid - Solar/Generator | IVECO | 32.0 | SZYL-P325-36 | 24.7 | poor | The borehole has 3 water storage. two elevated water tank in the village and other one is located at the borehole site. The capacity of three tanks is 120 meter cubic. The pipe line connection b/n the village and borehole is been destroyed by floods. And the village has no water supply. Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. | no | — | 26.6 | 8.06 | 1740.0 | 865.0 | — | Communal | yes | 17/09/2016 | 7 | 8 | no | — | yes | — | — | — | NRC | 13/11/2018 | Installation of solar power system. Replacement of main raising pipes and submersible pump. Construction of two toilets. Widening of animal troughs. | 1: Placement of pipe lines which distribute water to the village. 2: Replacement of main raising pipe lines and pump. 3: Construction of another borehole. 4: Construction of one elevated water tank. | — | — |
7205 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | bossaso | Ceeldahir | 1.5 | Kuwait Government | — | Ceeldahir borehole 2 | — | 10.6125246 | 49.0492388 | 623.0 | — | 2 | — | rural urban | yes | — | Yes | — | 900 | 150 | — | 1500 | — | — | 150.0 | pvc | 8.0 | — | 12.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 500.0 | — | 8 | — | yes | 3 | 9.0 | Submersible Pump | Lowara | — | 132.0 | Generator | Eveco | 30.0 | — | — | fair | The distribution pipe lines are disconnected. The yield of borehole is very low. | no | — | 26.3 | 7.65 | 3520.0 | 1770.0 | — | Communal | no | — | — | — | yes | 0.02 | yes | — | — | — | Community_e | 25/11/2021 | Replacement of main raising pipes and submersible pump. | Solar power installation. Replacement of main raising pipes and submersible pump. Replacement of distribution pipe line. | — | — |
7183 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Laandheere | 0.3 | Community | 12/03/2013 | Laandheere BH | — | 7.1810792 | 47.3584385 | 350.0 | — | 1 | — | urban rural | yes | — | Yes | — | 910 | 300 | — | 2500 | 0.0 | — | 180.0 | pvc | 8.0 | — | 10.0 | 10.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 13.0 | Stainless Steel | 500.0 | 7 | 4 | 2 | yes | 3 | 8.0 | Submersible Pump | — | 15.0 | 145.0 | Hybrid - Solar/Generator | IVECO | 30.0 | GD100_01G_4_PV | 18.5 | fair | — | yes | Colorless and odorless | 29.3 | 7.72 | 2835.0 | 1405.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | NRC | 12/02/2021 | 1. Rehabilitation of pipes, koisks and animal throughts 2. Installation of solar power. | 1.Construction of new elevated tank 2. Fancing of borehole. | — | — |
7250 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | galkayo | Roox | — | Community | 12/03/2016 | Roox BH | — | 7.2052439 | 47.4384682 | 341.0 | — | 2 | — | rural urban | yes | — | Yes | — | 4200 | 1500 | — | 2500 | — | — | 180.0 | pvc | 8.0 | — | 13.3 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 1300.0 | 30 | 6 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 150.0 | Hybrid - Solar/Generator | Doss | 30.0 | — | 19.6 | fair | — | yes | Colorless and odorless | 34.5 | 7.61 | 2350.0 | 1171.0 | — | Communal | yes | 12/03/2016 | 5 | 2 | yes | 0.05 | yes | — | — | — | NRC | 12/03/2020 | 1. Installation of solar power. 2. Rehabilitation of pump. | 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room. | — | — |
7976 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | 0.7 | Community | 10/10/2021 | Rouble BH bursaalax | — | 7.164917 | 47.2376117 | 355.0 | — | 7 | — | urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 20.0 | 5.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 80.0 | — | — | 2 | yes | 4 | 8.0 | Submersible Pump | — | 15.0 | 185.0 | Generator | Parkins | 45.0 | — | — | poor | There is no any water supply | yes | Colorless and odorless | 32.3 | 7.8 | 1946.0 | 1303.0 | — | Communal | yes | 10/10/2021 | 4 | 0 | no | — | no | — | — | — | — | — | — | 1. Installation of solar power 2. Construction of new elevated tank 3. Water supply pipes 5. Construction of koisks and animal troughts | — | — |
7160 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursalax | — | Community | 10/03/2010 | Bursalax water company BH 3 | — | 7.1834657 | 47.2280446 | 373.0 | — | 3 | — | urban rural | yes | — | Yes | — | 14000 | 50 | 20 | 500 | 0.0 | — | 236.0 | pvc | 8.0 | — | 28.5 | 16.0 | — | 2.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 600.0 | — | 1 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 186.0 | Generator | Parkins | 45.0 | — | — | fair | Something rehabilitation needed | yes | Colorless and odorless | 31.0 | 8.1 | 1811.0 | 1213.3 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 10/02/2021 | 1. Fancing 3. Construction of koisk. | 1. Installation of solar power 2. Rehabilitation of generator. | — | — |
7528 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursalaax | — | CARE Somalia | 10/01/1994 | Bursaalax BH, ceel weyne | — | 7.1802309 | 47.242755 | 355.0 | — | 4 | — | urban | yes | — | Yes | — | 3000 | — | — | — | — | — | 210.0 | gi | 6.0 | — | 17.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 68.0 | PVC | 4000.0 | 350 | 4 | 2 | yes | 9 | 8.0 | Submersible Pump | Lowara | 11.0 | 170.0 | Hybrid - Solar/Generator | Parkins | 20.0 | YL365D-36b | 12.77 | fair | — | yes | Colorless and odorless | 31.6 | 7.6 | 1940.0 | 1299.8 | — | Communal | no | — | — | — | yes | 0.05 | no | — | — | — | IRC | 10/03/2019 | 1. Installation of solar power | 1. Construction of new elevated tank 2. Rehabilitation of generator 3. Fancing. 4. Caretaker rooms construction. 5. Rehabilitation of pump and riser pipes 6. Extension of pipelines. | — | — |
7980 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | 0.5 | Community | 10/02/2021 | Mahiigaan BH | — | 7.1654211 | 47.2408643 | 355.0 | — | 5 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 24.0 | — | — | 0.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | PVC | 120.0 | — | — | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | There is no supply for this borehole | yes | Colorless and odorless | 33.1 | 7.6 | 1902.0 | 1274.3 | — | Communal | yes | 10/02/2021 | 3 | 2 | yes | — | no | — | — | — | Community | 10/03/2022 | 1. Construction of elevated water tank | Construction of new elevated tank. Installation of solar power. Construction of koisks and animal troughts. 5. Installation of generator. | — | — |
7423 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalah | — | Community | 10/03/2006 | Bursaalax water company BH 1 | — | 7.1847943 | 47.2331085 | 364.0 | — | 7 | — | urban | yes | — | Yes | — | 14000 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 12.5 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 138.0 | Galvanised Steel | 4000.0 | 2000 | 3 | — | no | — | — | Submersible Pump | Lowara | 15.0 | 190.0 | Hybrid - Solar/Generator | Parkins | 90.0 | BR-M300 | 31.5 | good | — | yes | Colorless and odorless | 30.0 | 8.25 | 1925.0 | 1289.75 | — | Utility/Local Authority | — | — | — | — | yes | 0.15 | no | — | — | — | Community | 10/03/2021 | 1. Rehabilitation of pump and riser pipes 2. Flashing. | 1. Fancing. 2. Rehabilitation of generator. 3. Construction of new elevated tank. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France