Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7533 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob UNICEF 08/03/2017 Goldogob BH 3 7.0409077 47.0329871 345.0 11 urban yes Yes 42000 218.0 pvc 8.0 12.0 15.0 3.0 Concrete/Masonry tank 240.0 PVC 9532.0 1590 no Submersible Pump Frankilin 11.0 192.0 Generator Parkins 110.0 good yes Colorless and odorless 30.5 7.6 1650.0 818.0 Private-Public-Partnership yes 0.05 no 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies.
7224 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Bayra CEFA 07/03/2010 Bayra BH 1 6.9555135 47.3198792 300.0 1 urban rural yes Yes 8400 1000 50 2500 0.0 200.0 pvc 8.0 70.0 12.0 20.0 3.0 Concrete/Masonry tank 60.0 PVC 4000.0 250 6 2 yes 10 8.0 Submersible Pump Lowara 11.0 137.0 Hybrid - Solar/Generator Parkins 30.0 SG600-022GB 22.0 fair Needs construction of elevated water tank yes Colorless and odorless 29.7 7.41 3985.0 1935.0 Communal yes 07/03/1974 5 2 yes 0.05 yes USAID 07/03/2020 Installation of solar power 1. Rehabilitation of elevated water tank. 3. Rehabilitation of Groundwater monitoring equipment in the borehole. 4. Rehabilitation of animal thoughts. 5. Rehabilitation of caretaker room.
7916 Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.5 Community_ 13/05/1900 Qoton dug well 1 9.5949967 50.471645 242.0 2 rural urban yes Yes 600 1000 5000 5.0 4.0 15.0 2 yes 20 8.0 poor There is no pump and main raising pipes. No generator. No solar power system. no 27.3 8.0 2400.0 1200.0 Communal yes 5 no no Community_e 07/08/2021 Cleaning the deep of the well 1: Installation of submersible pump and raising pipes. 2: Construction of another animal troughs. 3: Construction of elevated water tank. generator.
8343 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Madina Private 07/03/2021 Madina BH 6.8585902 47.3716348 277.0 1 rural no 6 No There isn't any water supply 130.0 pvc 8.0 13.0 Other no Submersible Pump 15.0 80.0 Generator poor This borehole is new, and there is no any water supply. no Private/Individual no no Emergency Construction of elevated water tank Construction of koisks Construction of animal thoughts
8737 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug goldogob Xerojaalle 0.5 Xerojaalle 6.987134 47.1766608 320.0 1 rural urban no 8 No A months, borehole problems 2500 0.0 pvc 8.0 yes Communal no NRC 07/03/2020 Construction of elevated water 1. Emergency 2. Observation of borehole
8742 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Dhagxanyo cadde PWDA 07/03/2014 Dhagxanyo cade BH 1 6.8853691 47.3511965 273.0 2 no No Unknown problem 210.0 Other no No Pump poor yes Communal yes 07/03/2014 4 2 no no Emergency for observation borehole problem. 1. Rehabilitation of borehole .
7740 Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.4 Community_ 16/03/2004 Qoton dug well 2 9.594538 50.4708793 241.0 2 rural urban yes Yes 1200 4.5 3.5 1.0 3.0 Concrete/Masonry tank 5.0 Galvanised Steel 1 8 no Submersible Pump Lowara 3.0 Hybrid - Solar/Generator Diesel generator DS72310W 1.8 poor The yield of a dug well is very low. The solar power system of qoton is 6 panels only. no 31.0 8.0 2220.0 1115.0 Communal yes 20/09/2005 5 0 yes 0.005 CARE Somalia 07/08/2020 1:Supplied of diesel generator 2: Construction generator room. 3: Installation of solar power system which contain 6 panels. 4: Replacement of submersible pump. 1: Digging deep of the well in order to increase its yield. 2: Replecement of all rusted distribution pipe lines. 3: Installation of extra solar panels. 4: Construction of caretaker room.
8397 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug goldogob Godgaashaan 07/03/2019 Godgaashaan BH 6.978967 47.2497849 320.0 1 rural urban yes No A months ago, borehole needs observation of the problem stopped. 1500 1200 1200 0.0 130.0 pvc 8.0 Concrete/Masonry tank 36.0 Other 150 2 yes Submersible Pump 11.0 Generator Parkins 30.0 poor Needs rehabilitation of supplies no Communal no no NRC 07/03/2021 1. Construction of new elevated tank 1. Emergency 2. Observation of borehole 3. Construction of koisks 4. Construction of generator room and caretaker room
7836 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Wajadir Galkacayo 0.7 UNICEF 07/03/2018 Wadajir BH 6.7886291 47.3891503 346.0 1 urban yes Yes 1610 210.0 pvc 8.0 21.4 8.0 2.0 Concrete/Masonry tank 30.0 Galvanised Steel 1000.0 19 4 0 no Submersible Pump Lowara 11.0 149.0 Hybrid - Solar/Generator Parkins 20.0 YL375D_36b 28.125 poor There is no animal thoughts yes Colorless and odorless 30.6 7.76 3570.0 1725.0 Communal no no no UNICEF 08/01/2021 Installation of solar power 1. Construction of animal thoughts. 3. Rehabilitation of kiosks 4. Operator supporting.
7178 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Barwaaqo Community 07/03/2019 Barwaaqo BH 6.9693155 47.272905 301.0 1 rural urban yes Yes 1050 600 1200 0.0 201.0 pvc 8.0 17.3 10.0 2.0 Concrete/Masonry tank 26.0 PVC 200.0 35 2 2 yes 4 8.0 Submersible Pump 11.0 151.0 Generator Parkins 30.0 poor Absolutely needs full rehabilitation yes 29.7 7.5 3100.0 1565.0 Communal yes 07/03/2019 5 2 yes 0.05 yes CARE Somalia 07/01/2021 1. Construction of new elevated tank. 2. Construction of koisks and animal thoughts. 1. Emergency for Installation of solar power 2.. Construction of koisks 3. Fancing borehole 4. Pump spare. 5. Operator supporting.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors