Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8737 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug goldogob Xerojaalle 0.5 Xerojaalle 6.987134 47.1766608 320.0 1 rural urban no 8 No A months, borehole problems 2500 0.0 pvc 8.0 yes Communal no NRC 07/03/2020 Construction of elevated water 1. Emergency 2. Observation of borehole
8343 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Madina Private 07/03/2021 Madina BH 6.8585902 47.3716348 277.0 1 rural no 6 No There isn't any water supply 130.0 pvc 8.0 13.0 Other no Submersible Pump 15.0 80.0 Generator poor This borehole is new, and there is no any water supply. no Private/Individual no no Emergency Construction of elevated water tank Construction of koisks Construction of animal thoughts
7511 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Galkacayo 1.2 UNHRC 06/03/2015 Salaama IDP 2 BH 6.8555099 47.4437124 268.0 20 urban yes Yes 31200 210.0 pvc 8.0 84.0 15.0 16.0 3.0 Concrete/Masonry tank 81.0 PVC 4200.0 9 2 no Submersible Pump Lowara 15.0 126.0 Hybrid - Solar/Generator Parkins 65.0 300_73M 22.5 fair This supply has generator problem, so needs rehabilitation of generator yes Colorless and odorless 29.5 7.8 3370.0 1667.0 Communal yes 06/03/2015 4 2 yes 0.05 no Agency not specified 06/03/2018 Construction of elevated water 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency).
7344 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Raasqabobe 1.5 Community 06/03/2015 Raasqaboobe BH 6.8593023 47.4473214 269.0 20 urban rural yes Yes 2000 14 100 40.0 160.0 pvc 8.0 24.0 8.0 3.0 Concrete/Masonry tank 120.0 Galvanised Steel 600.0 2 no Submersible Pump 11.0 130.0 Generator Parkins 40.0 poor Needs full rehabilitation yes Colorless and odorless 28.5 7.95 3240.0 1620.0 Communal yes 06/03/2015 3 0 yes 0.05 yes 1. Rehabilitation of generator 2. Construction of new kiosks. 3. Rehabilitation of pipelines.
7643 Spring Puntland Ministry of Energy Minerals and Water March 6, 2022 Bari bandar_beyla Caris 1.0 Shilcon 27/12/2005 Haashire spring 9.5872416 50.8004885 -32.0 1 rural urban yes Yes 720 100 7.0 Concrete/Masonry tank 6.0 PVC 1200.0 3 1 no Submersible Pump Lowara Hybrid - Solar/Generator KAMA fair The power of generator and solar is very low. The yield is very low. no 29.5 7.64 1700.0 895.0 Communal yes 14/09/2021 3 2 yes 0.025 no CARE Somalia 30/12/2021 1: Installation of 5 solar panels with all accessories. 2: Rehabilitation of caretaker room. 3: Installation of submersible pump. 4: Construction of RC concrete slab which protect the mouth of spring. 5: Construction of 3 kiosks and one animal troughs. 1: Diging the deep of the spring in order to increase its yield. 2: Generator and installation of extra solar panels with all accessories. 3: Fuel which acess generator.
7892 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Gobsho Community 06/03/2017 Gobsho BH 6.9394533 47.4819791 269.0 1 rural urban yes Yes 2800 500 700 0.0 185.0 pvc 8.0 55.0 11.0 16.0 3.0 Concrete/Masonry tank 8.0 Galvanised Steel 600.0 4 3 yes 10 8.0 Submersible Pump Lowara 11.0 145.0 Hybrid - Solar/Generator Parkins 45.0 17.0 fair Shortness of storage or tank yes Colorless and odorless 31.1 7.9 2610.0 1308.0 Communal yes 06/03/2017 7 0 no no Save the children 06/03/2019 Installation of solar power 1. Construction of new elevated tank 2. Construction of generator room
7429 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Aljaziira/ Galkacayo Private 06/03/2017 Aljaziira BH 6.8009848 47.4198503 258.0 20 urban yes Yes 3500 205.0 pvc 8.0 60.0 15.0 2.0 Concrete/Masonry tank 200.0 PVC 6000.0 500 4 0 yes 10 8.0 Submersible Pump Lowara 18.0 150.0 Generator Parkins 160.0 good yes Colorless and odorless 29.6 8.08 2540.0 1270.0 Private/Individual yes 0.1 no Private Rehabilitation of generator 1. Installation of solar power
7522 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Halabookhad 5.0 WDA 06/03/1974 Halabookhad BH 6.854273 47.4133554 278.0 20 urban yes Yes 10200 85.0 pvc 8.0 42.0 10.0 8.0 3.0 Concrete/Masonry tank 20.0 Galvanised Steel 2500.0 300 8 2 no Submersible Pump 11.0 65.0 Hybrid - Solar/Generator Parkins 30.0 PN60_365 22.79 fair This supply poorly functioning yes Colorless and odorless 29.6 8.08 2540.0 1270.0 Communal yes 06/03/1974 4 0 yes 0.05 no UNICEF 06/03/2018 Borehole rehabilitation and installation of solar power Full rehabilitation: 1. Rehabilitation of generator 2. Rehabilitation of pump and riser pipes 3. Extension and rehabilitation elevated water tank 4. Rehabilitation of generator room 5. Rehabilitation of kiosks and animal thoughts.
7513 Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo UNICEF 05/03/2003 Galkacayo water company BH 2 6.7940122 47.4114582 251.0 20 urban yes Yes 77000 220.0 pvc 12.0 45.0 15.0 3.0 Steel tank 750.0 PVC 5000.0 1600 no Submersible Pump Lowara 22.0 120.0 Generator 350 350.0 yes Colorless and odorless 27.6 7.61 3300.0 1635.0 Private-Public-Partnership yes 0.05 no 1. Rehabilitation of elevated water tank
7730 Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo Private 05/03/2016 Galkacayo daryeel BH 2 6.8166163 47.4382128 262.0 20 urban yes Yes 10000 230.0 pvc 8.0 13.3 18.0 3.0 Concrete/Masonry tank 160.0 PVC 10000.0 700 no Submersible Pump Lowara 22.0 156.0 Hybrid - Solar/Generator 160.0 SS360_72 32.76 good yes Colorless and odorless Utility/Local Authority yes 0.01 no 1. Extension of pipelines

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors