Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8737 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Xerojaalle | 0.5 | — | — | Xerojaalle | — | 6.987134 | 47.1766608 | 320.0 | — | 1 | — | rural urban | no | 8 | No | A months, borehole problems | 2500 | — | — | — | 0.0 | — | — | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | NRC | 07/03/2020 | Construction of elevated water | 1. Emergency 2. Observation of borehole | — | — |
8343 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | galkayo | Madina | — | Private | 07/03/2021 | Madina BH | — | 6.8585902 | 47.3716348 | 277.0 | — | 1 | — | rural | no | 6 | No | There isn't any water supply | — | — | — | — | — | — | 130.0 | pvc | 8.0 | — | 13.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | — | — | — | no | — | — | Submersible Pump | — | 15.0 | 80.0 | Generator | — | — | — | — | poor | This borehole is new, and there is no any water supply. | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | Emergency Construction of elevated water tank Construction of koisks Construction of animal thoughts | — | — |
7511 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Galkacayo | 1.2 | UNHRC | 06/03/2015 | Salaama IDP 2 BH | — | 6.8555099 | 47.4437124 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 210.0 | pvc | 8.0 | 84.0 | 15.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 81.0 | PVC | 4200.0 | — | 9 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Hybrid - Solar/Generator | Parkins | 65.0 | 300_73M | 22.5 | fair | This supply has generator problem, so needs rehabilitation of generator | yes | Colorless and odorless | 29.5 | 7.8 | 3370.0 | 1667.0 | — | Communal | yes | 06/03/2015 | 4 | 2 | yes | 0.05 | no | — | — | — | Agency not specified | 06/03/2018 | Construction of elevated water | 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency). | — | — |
7344 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Raasqabobe | 1.5 | Community | 06/03/2015 | Raasqaboobe BH | — | 6.8593023 | 47.4473214 | 269.0 | — | 20 | — | urban rural | yes | — | Yes | — | 2000 | 14 | — | 100 | 40.0 | — | 160.0 | pvc | 8.0 | — | 24.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 120.0 | Galvanised Steel | 600.0 | — | — | 2 | no | — | — | Submersible Pump | — | 11.0 | 130.0 | Generator | Parkins | 40.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 28.5 | 7.95 | 3240.0 | 1620.0 | — | Communal | yes | 06/03/2015 | 3 | 0 | yes | 0.05 | yes | — | — | — | — | — | — | 1. Rehabilitation of generator 2. Construction of new kiosks. 3. Rehabilitation of pipelines. | — | — |
7643 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Bari | bandar_beyla | Caris | 1.0 | Shilcon | 27/12/2005 | Haashire spring | — | 9.5872416 | 50.8004885 | -32.0 | — | 1 | — | rural urban | yes | — | Yes | — | 720 | — | — | 100 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.0 | — | — | — | — | Concrete/Masonry tank | 6.0 | PVC | 1200.0 | — | 3 | 1 | no | — | — | Submersible Pump | Lowara | — | — | Hybrid - Solar/Generator | KAMA | — | — | — | fair | The power of generator and solar is very low. The yield is very low. | no | — | 29.5 | 7.64 | 1700.0 | 895.0 | — | Communal | yes | 14/09/2021 | 3 | 2 | yes | 0.025 | no | — | — | — | CARE Somalia | 30/12/2021 | 1: Installation of 5 solar panels with all accessories. 2: Rehabilitation of caretaker room. 3: Installation of submersible pump. 4: Construction of RC concrete slab which protect the mouth of spring. 5: Construction of 3 kiosks and one animal troughs. | 1: Diging the deep of the spring in order to increase its yield. 2: Generator and installation of extra solar panels with all accessories. 3: Fuel which acess generator. | — | — |
7892 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Gobsho | — | Community | 06/03/2017 | Gobsho BH | — | 6.9394533 | 47.4819791 | 269.0 | — | 1 | — | rural urban | yes | — | Yes | — | 2800 | 500 | — | 700 | 0.0 | — | 185.0 | pvc | 8.0 | 55.0 | 11.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 8.0 | Galvanised Steel | 600.0 | — | 4 | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 11.0 | 145.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | 17.0 | fair | Shortness of storage or tank | yes | Colorless and odorless | 31.1 | 7.9 | 2610.0 | 1308.0 | — | Communal | yes | 06/03/2017 | 7 | 0 | no | — | no | — | — | — | Save the children | 06/03/2019 | Installation of solar power | 1. Construction of new elevated tank 2. Construction of generator room | — | — |
7429 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Aljaziira/ Galkacayo | — | Private | 06/03/2017 | Aljaziira BH | — | 6.8009848 | 47.4198503 | 258.0 | — | 20 | — | urban | yes | — | Yes | — | 3500 | — | — | — | — | — | 205.0 | pvc | 8.0 | — | 60.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 200.0 | PVC | 6000.0 | 500 | 4 | 0 | yes | 10 | 8.0 | Submersible Pump | Lowara | 18.0 | 150.0 | Generator | Parkins | 160.0 | — | — | good | — | yes | Colorless and odorless | 29.6 | 8.08 | 2540.0 | 1270.0 | — | Private/Individual | — | — | — | — | yes | 0.1 | no | — | — | — | Private | — | Rehabilitation of generator | 1. Installation of solar power | — | — |
7522 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Halabookhad | 5.0 | WDA | 06/03/1974 | Halabookhad BH | — | 6.854273 | 47.4133554 | 278.0 | — | 20 | — | urban | yes | — | Yes | — | 10200 | — | — | — | — | — | 85.0 | pvc | 8.0 | 42.0 | 10.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 2500.0 | 300 | 8 | 2 | no | — | — | Submersible Pump | — | 11.0 | 65.0 | Hybrid - Solar/Generator | Parkins | 30.0 | PN60_365 | 22.79 | fair | This supply poorly functioning | yes | Colorless and odorless | 29.6 | 8.08 | 2540.0 | 1270.0 | — | Communal | yes | 06/03/1974 | 4 | 0 | yes | 0.05 | no | — | — | — | UNICEF | 06/03/2018 | Borehole rehabilitation and installation of solar power | Full rehabilitation: 1. Rehabilitation of generator 2. Rehabilitation of pump and riser pipes 3. Extension and rehabilitation elevated water tank 4. Rehabilitation of generator room 5. Rehabilitation of kiosks and animal thoughts. | — | — |
7513 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | UNICEF | 05/03/2003 | Galkacayo water company BH 2 | — | 6.7940122 | 47.4114582 | 251.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 220.0 | pvc | 12.0 | — | 45.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | PVC | 5000.0 | 1600 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 120.0 | Generator | 350 | 350.0 | — | — | — | — | yes | Colorless and odorless | 27.6 | 7.61 | 3300.0 | 1635.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of elevated water tank | — | — |
7730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2016 | Galkacayo daryeel BH 2 | — | 6.8166163 | 47.4382128 | 262.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 13.3 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 156.0 | Hybrid - Solar/Generator | — | 160.0 | SS360_72 | 32.76 | good | — | yes | Colorless and odorless | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France