Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7773 Borehole FGS Ministry of Energy and Water Resources April 9, 2022 Lower Juba afmadow Mowlid laqay borehole 5.0 Towfiqwelfare 09/04/2018 Miwlidkaqay 0.4050787 41.0249018 51.0 4 rural urban yes Yes 80000 7000 2000 2500 0.0 180.0 gi 11.0 30.0 75.0 24.0 130.0 3.0 Concrete/Masonry tank 25.0 PVC 15.0 15000 4 3 yes 5 50.0 Submersible Pump No 11 30.0 Generator Enfeca, doze, parking 40.0 good Water is fresh and drinkable no Communal yes 9-Apr-19 4 2 yes 0 no IOM 9-Mar-21 Tanka, watwr kiosk 2 Solor key is not working, engineer needs, reha of the water trough, fencing,need additional tanks
8045 Dug Well Somaliland MoWRD April 9, 2022 Togdheer owdweyne Ceel same 0.3 Privately established 09/04/1975 Ceelsame Dug well 9.3832834 45.1614301 1019.0 19 urban rural yes Yes 500 1000 30 1500 0.0 20.0 18.0 1.0 8.0 Other 0.0 Other 0.0 10 0 0 yes 7 9.0 No Pump poor Poor yes Brown with suspensions 27.2 7.44 1424.0 905.0 Private/Individual no no No intervention is carried out No intervention is required
7238 Borehole Somaliland MoWRD April 9, 2022 Togdheer owdweyne Ceel same 0.3 IR 08/06/2016 Ceel same borehole 9.3787741 45.1641666 1030.0 0 urban rural yes Yes 1400 4000 20 10000 0.0 280.0 gi 8.0 230.0 6.0 8.0 0.0 0.0 Concrete/Masonry tank 58.0 Galvanised Steel 300.0 200 3 4 no Submersible Pump Grundfoz 11.0 230.0 Hybrid - Solar/Generator Perkins 45.0 19.0 good Very good no 28.7 7.22 3270.0 1870.0 Communal no no yes CARE Somalia 13/11/2021 Pump and rise pipe replacement
7881 Borehole Somaliland MoWRD April 9, 2022 Sool las_caanood Karin gorfood 0.8 IR 01/01/2014 Karin Garfood borehole 8.1271413 47.7511336 702.0 1 rural urban yes Yes 560 160 0 8000 0.0 290.0 pvc 8.0 246.0 40.0 12.0 4.0 2.0 Concrete/Masonry tank 48.0 Galvanised Steel 8000.0 250 0 2 yes 12 18.0 Submersible Pump Luwara 7.0 240.0 Hybrid - Solar/Generator Perkins 60.0 Photovoltiac module 300.0 good The supply is working good though the solar system is not functioning due to electrical shock that damage the entire soil panels. no 27.0 7.9 2700.0 1900.0 Communal no no no IR 09/04/2020 Installed new pump and and make maintenance to the pipelines Solar panels are not working and require either replacement or repairing
7887 Borehole Somaliland MoWRD April 8, 2022 Togdheer burco Qoryaale 0.7 IR 05/04/2014 Qoryaale borehole 9.0826542 45.9736882 866.0 0 rural urban yes Yes 2100 12000 0 3000 2.0 gi 8.0 8.0 Concrete/Masonry tank 47.0 Galvanised Steel 400.0 300 2 7 no Submersible Pump Grundfos Hybrid - Solar/Generator Marapco 65.0 Raw power 25.2 good The borehole supply system was fair yes Mud color, and a little bit of smell. 32.8 7.74 2660.0 1830.0 Communal no no no Somaliland MoWRD 12/02/2022 Rehabilitation pump replacement Switch rehabilitation, animal troughs, and kiosk rehabilitation
7293 Borehole Somaliland MoWRD April 8, 2022 Togdheer burco Xood 0.1 UAE Redcresent 05/06/2017 Xood borehole 9.3505241 46.1792329 710.0 0 rural yes Yes 0 1000 0 10000 0.0 280.0 gi 8.0 60.0 40.0 3.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 300.0 0 0 8 no Submersible Pump Grundfos 11.0 178.0 Generator Perkins 45.0 good Very good no 32.7 7.75 6553.0 4650.0 Communal no no yes NRC 04/05/2021 Rehabilitation Disalination system, Tank replacement, generator and and caretaker room rehabilitaion,fast moving parts, animal trough rehabilitaion.
7637 Borehole Somaliland MoWRD April 7, 2022 Togdheer burco Burco 0.1 Direct Aid 07/06/2021 Saylada borehole 19 9.5019548 45.5145849 1025.0 0 urban yes Yes 21000 181.0 pvc 8.0 104.0 21.0 17.0 0.0 0.0 Other 0.0 PVC 500.0 3000 0 0 yes 15 9.0 Submersible Pump Saha 20.0 177.0 Generator Perkins 60.0 good Each and every household has connection and access botable water for their water demand. no 27.6 6.77 2300.0 1360.0 Communal no yes 0.025 no 07/04/2021 No intervention carried out No intervention is required
8740 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Oodogooye 7.0 Somaliland Development Fund-SDF 07/01/2022 Oodogooye borehole 1 8.4942285 47.4203142 616.0 2 rural yes No The borehole is new and not installed the supply system, the pump and the generator all are missing. 0 0 0 0 0.0 310.0 other Only the borehole drilled by the project. All supply system are not delivered yet. no Communal All the supply system are missing. The pump, pipelinrs and generator should be connected to the borehole
8111 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 1.5 Private 07/04/2015 Geel caseeye 8.5646566 47.6841849 539.0 2 rural yes Yes 0 40 0 0 3.0 65.0 pvc 8.0 40.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 48.0 Galvanised Steel 100.0 0 0 0 yes 2 8.0 Submersible Pump Luwara 13.0 30.0 Solar Szyl-p300- 36 300.0 good Two solar panels damaged and need to be changed no 32.0 6.8 1150.0 810.0 Communal no no no Oxfam GB 07/04/2019 Constructed water tank of capacity 48 qubic meter Supply system disconnected due to pipes damage and Water cannot go to water tanks. 2 solar panels also not working
7638 Borehole Somaliland MoWRD April 7, 2022 Togdheer burco Burco 0.1 IR Islamic Relief borehole 13 9.5209148 45.5578734 1021.0 0 urban yes Yes 21000 140.0 gi 8.0 96.8 32.0 17.0 0.0 0.0 Other 0.0 PVC 500.0 3000 0 0 no Submersible Pump Grundfos 30.0 119.0 Generator Perkins 80.0 good Each and every household has connection and access botable water for their water demand. no 27.1 6.87 1923.0 1170.0 Communal no yes 0.025 no Machine replacement No intervention is required

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors