Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7187 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Dhamuuke Community 09/03/2019 Dhamuuke BH 7.2394967 47.1243666 384.0 2 rural urban yes Yes 420 130 250 180.0 pvc 8.0 10.7 6.0 3.0 Concrete/Masonry tank 32.0 PVC 1200.0 30 1 1 yes 1 8.0 Submersible Pump Lowara 11.0 120.0 Hybrid - Solar/Generator Parkins 30.0 JCNS-M36V360W 20.16 good yes Colorless and odorless 33.5 7.68 2220.0 1103.0 Communal no yes 0.05 yes NRC 09/05/2020 1. Construction of operator 1. Construction of animal throughts 2. Installation of generator 3. Rehabilitation of generator
7191 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Taaloole Kuwait charity 09/03/2019 Taaloole BH 7.0519069 47.0863116 346.0 1 rural urban yes Yes 600 500 1500 10.0 245.0 pvc 8.0 35.0 6.0 1.0 Concrete/Masonry tank 18.0 PVC 1000.0 13 1 2 yes 5 8.0 Submersible Pump Lowara 15.0 185.0 Solar AS-P60-270W 17.28 good yes Colorless and odorless 28.6 8.28 1708.0 843.0 Communal yes 09/03/2019 3 2 yes 0.05 yes 1. Installation of generator. 2. Rehabilitation of pump and riser pipes 3. Construction of new elevated tank 4. Construction of koisks. 5. Extension of pipelines.
7143 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Daarasalaam Community 09/03/2011 Daarasalaam BH 7.2566882 47.1067542 367.0 1 rural urban yes Yes 10500 2500 200 2000 12.0 168.0 pvc 8.0 16.0 15.0 2.0 Concrete/Masonry tank 62.0 PVC 3500.0 700 8 4 yes 10 8.0 Submersible Pump Grand fos 15.0 162.0 Hybrid - Solar/Generator Parkins 45.0 DS734OM 23.12 fair Needs rehabilitation yes Colorless and odorless 32.6 7.71 2470.0 1654.4 Communal yes 09/03/2011 4 2 yes 0.05 yes IRC 09/03/2017 Installation of solar power Full rehabilitation: 1. Rehabilitation of pipes 2. Rehabilitation of pump and riser pipes 3. Rehabilitation of and construction of animal throughts 4. Construction of elevated tank
7220 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Xida 0.2 12/05/2013 Xida borehole 9.9550299 49.0565495 909.0 1 rural urban yes No The source stopped 24/04/2019 Unknown problem. 9000 2500 6000 370.0 pvc 8.0 10.0 13.0 Concrete/Masonry tank 25.0 Galvanised Steel 300.0 1 2 yes 5 10.0 Submersible Pump Lowara 348.0 Generator Perkin 44.0 fair There is no water supply system in the village and kiosks. no Communal yes 10/09/2013 4 2 no yes DRC - Puntland 16/08/2018 Replacement of main raising pipes and submersible pump. 1: Assessments of the borehole problem in order to start borehole functioning. 2: Installation of solar power system.
7252 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Ring oomane TASS 09/03/2019 Ring oomane BH 2 7.2101855 47.1912994 373.0 2 rural urban yes Yes 3500 200 400 200.0 pvc 8.0 4.0 4.0 5.0 Concrete/Masonry tank 26.0 Galvanised Steel 100.0 1 2 yes 5 8.0 Submersible Pump Lowara 11.0 169.0 Generator Parkins 33.0 poor Needs construction water supplies ( koisks, animal throughts) yes Colorless and odorless 39.5 7.6 2100.0 1035.0 Communal no no yes 1. Drilling new borehole because of depletion of yield. 2. Installation of generator 4. Installation of solar power 4. Rehabilitation of animal throughts 5. Construction of new kiosks and rehabilitation koisks
7093 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Sheerbi 3.0 IR 12/07/2019 Sheerbi borehole 9.8439133 49.1074936 810.0 1 rural urban yes Yes 18000 4500 15000 400.0 pvc 8.0 5.0 13.0 Concrete/Masonry tank 40.0 Galvanised Steel 450.0 1 2 no Submersible Pump Lowara 380.0 Hybrid - Solar/Generator Perkins 60.0 SZYL-P300-36 25.5 poor The yield of borehole is very low. The village has no water supply system. There is no water trucking because the yield of borehole is very low. no 27.9 7.48 4000.0 2000.0 Communal yes 09/04/2000 3 4 no yes Puntland MoEMW 18/05/2021 Replacement of main raising pipes and submersible pump. Replacement some of the solar equipment accessories. Digging the deep of the borehole in order to increase borehole yield Construction of toilet Construction of caretaker room Construction of one animal water troughs. Complete water supply system. Construction of another borehole.
7210 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Kala dhac 7.0 IR 26/05/2019 Kaladhac borehole 10.0486823 48.9363469 966.0 1 rural urban yes Yes 6000 500 10000 350.0 pvc 8.0 212.0 11.0 13.0 Concrete/Masonry tank 40.0 Galvanised Steel 270.0 1 3 yes 8 9.0 Submersible Pump Lowara 318.0 Hybrid - Solar/Generator Perkins 60.0 SZYL-M330-36 24.75 fair no 27.7 7.28 4350.0 2150.0 Communal no no yes Puntland MoEMW 09/05/2021 Replacement of main raising pipes and submersible pump. 1: Generator. 2: Replacement of 5 solar panels. 3: Replacement of main raising pipes and submersible pump. 4: Replacement of rusted distribution pipe lines.
7144 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Qansaxle Community 09/03/2016 Qansaxle BH 7.1188594 47.0943949 368.0 1 rural urban yes Yes 3000 800 150 500 0.0 176.0 pvc 8.0 6.6 15.0 5.0 Concrete/Masonry tank 60.0 PVC 2000.0 70 4 3 yes 10 8.0 Submersible Pump Lowara 15.0 170.0 Hybrid - Solar/Generator Parkins 60.0 YL365-36b 23.36 fair Koisks of this supply needs strong rehabilitation yes Colorless and odorless 32.8 7.3 1863.0 1240.0 Communal yes 09/03/2016 4 0 yes 0.1 yes Agency not specified 09/03/2018 1. Construction of new elevated tank 1. Construction new animal throughts 2. Extension of pipelines 3. Rehabilitation of pump and riser pipes 4. Rehabilitation of generator.
7211 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Waciye 3.0 Puntland MoEMW 14/08/2006 Waciye borehole 10.0226469 49.0389998 883.0 1 rural urban yes Yes 3000 1000 10000 380.0 pvc 8.0 8.0 10.0 Concrete/Masonry tank 96.0 Galvanised Steel 300 1 2 no Submersible Pump Lowara 294.0 Hybrid - Solar/Generator Perkins 45.0 good The borehole distributes water on two elevated water tank. One elevated water distributes water to the kiosks and animal troughs. And onother elevated water tank distribute water to waciye city. The city contains around 300 House holds. no 27.7 7.31 4150.0 2070.0 Communal no no yes IOM 13/08/2018 Installation of solar power system. Replacement of main raising pipes and submersible pump. Replacement of all rusted distribution iron pipes. Replacement of main raising pipes and submersible pump. Generator. Construction of one kiosks.
7533 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob UNICEF 08/03/2017 Goldogob BH 3 7.0409077 47.0329871 345.0 11 urban yes Yes 42000 218.0 pvc 8.0 12.0 15.0 3.0 Concrete/Masonry tank 240.0 PVC 9532.0 1590 no Submersible Pump Frankilin 11.0 192.0 Generator Parkins 110.0 good yes Colorless and odorless 30.5 7.6 1650.0 818.0 Private-Public-Partnership yes 0.05 no 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors