Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7139 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Bari | qardho | Carmo | 1.0 | IR | 10/05/2017 | Carmo borehole | — | 9.4533435 | 48.8719451 | 850.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1200 | 300 | 10 | 5000 | 0.25 | — | 260.0 | pvc | 8.0 | — | 9.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 750.0 | — | 1 | 3 | yes | 1 | 9.0 | Submersible Pump | — | — | — | Solar | — | — | BR-M250W | 21.5 | fair | The water is over salt. The village has no water kiosks and water supply system. | no | — | 30.3 | 6.9 | 5990.0 | 2990.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Community_e | 17/02/2019 | Construction of one animal troughs | Replacement of main raising pipes and submersible pump. Rehabilitation of some solar panels and its accessories. Generator. Replacement of rusted distribution pipe lines. Water purification. | — | — |
7532 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | — | Goldogob BH 1 | — | 7.0428316 | 47.0341475 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 42000 | 1200 | 400 | 5000 | 2.5 | — | 209.0 | pvc | 8.0 | — | 9.0 | 15.0 | — | 3.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 46.0 | PVC | 1500.0 | 250 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 198.0 | Generator | Parkins | 45.0 | — | — | fair | Needs rehabilitation | yes | Colorless and odorless | 30.8 | 7.56 | 1710.0 | 845.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | GSA | 08/03/2012 | Construction of elevated water tank | 1.Installation of solar power 2. Installation of generator 3. Rehabilitation of pump and riser pipes | — | — |
7533 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | UNICEF | 08/03/2017 | Goldogob BH 3 | — | 7.0409077 | 47.0329871 | 345.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 218.0 | pvc | 8.0 | — | 12.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 9532.0 | 1590 | — | — | no | — | — | Submersible Pump | Frankilin | 11.0 | 192.0 | Generator | Parkins | 110.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies. | — | — |
7534 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 13/03/2017 | Goldogob water company BH 5 | — | 7.0437981 | 47.0129558 | 352.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 2786.0 | 7000 | — | — | — | — | — | Submersible Pump | Grandfoss | 15.0 | 126.0 | Hybrid - Solar/Generator | IVECO | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | — | — | — | — | — | — | — | 1. Fancing of borehole 2. Rehabilitation of generator. | — | — |
7345 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Tuur dibi | — | Community | 08/03/2020 | Tuur dibi BH | — | 7.0233423 | 46.9627436 | 346.0 | — | 1 | — | rural | yes | — | Yes | — | 1750 | 2500 | — | 3000 | 0.0 | — | 226.0 | pvc | 8.0 | — | 33.0 | 19.0 | — | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 50.0 | 250 | 2 | 2 | yes | 18 | 8.0 | Submersible Pump | — | 15.0 | 172.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 31.8 | 7.51 | 1810.0 | 898.0 | — | Communal | yes | 08/03/2020 | 3 | 1 | yes | 0.05 | yes | — | — | — | GPLZ and PWDA | 08/01/2022 | 1. Construction of new elevated tank ( GPLG). 2. installation of solar power and construction new koisks and animal thoughts ( PWDA). | plumbing tools | — | — |
7523 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Ceel boos Goldogob | — | — | 08/03/2017 | Ceel booc BH goldogob | — | 7.0321616 | 47.022893 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 750 | — | — | — | — | — | 215.0 | pvc | 8.0 | — | 6.7 | 5.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 94.0 | Galvanised Steel | 70.0 | — | 1 | 2 | yes | 3 | 8.0 | Submersible Pump | — | 11.0 | 192.0 | Generator | Parkins | 30.0 | — | — | poor | Absolutely poor supply, this supply needs full rehabilitation | yes | Colorless and odorless | 32.1 | 7.54 | 2530.0 | 1251.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing. | — | — |
7180 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/03/2004 | Goldogob water company BH 2 | — | 7.0297561 | 47.005359 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 42000 | — | — | — | 0.0 | — | 215.0 | pvc | 8.0 | 144.0 | 9.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | 13344.0 | 2224 | 1 | 2 | yes | 15 | 10.0 | Submersible Pump | Lowara | 15.0 | 192.0 | Hybrid - Solar/Generator | Parkins | 60.0 | — | — | fair | — | yes | Colorless and odorless | 30.5 | 7.51 | 2950.0 | 1455.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | UNICEF | 08/01/2021 | 1. Construction of new elevated tank | 1. Installation of solar power | — | — |
7244 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Community | 08/03/2018 | Mareegaale BH | — | 7.045631 | 47.0177575 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 2800 | 500 | 150 | 1500 | — | — | 250.0 | gi | 8.0 | — | 12.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 96.0 | PVC | 4000.0 | 360 | — | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 15.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 60.0 | PYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 33.7 | 7.67 | 1610.0 | 789.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | Community | 08/03/2020 | 1. Construction of elevated water tank | 1. Extension pipelines. 2.caretaker and Generator rooms construction. | — | — |
7521 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | WDA | 08/03/1943 | Ceel ciilde BH goldogob | — | 7.031098 | 47.020472 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 2100 | — | — | — | — | — | 200.0 | gi | 8.0 | — | 3.7 | 13.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | Galvanised Steel | 4000.0 | 300 | 2 | 2 | yes | 9 | 8.0 | Submersible Pump | Grand foss | 11.0 | 124.0 | Generator | Parkins | 45.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 32.5 | 7.42 | 2556.0 | 1261.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 08/02/2021 | 1. Construction of new elevated tank tank | 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms | — | — |
7530 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 11/03/2019 | Goldogob water company BH 6 | — | 7.0428029 | 47.0339146 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 8000 | — | — | — | — | — | 240.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 200.0 | PVC | 2786.0 | 2500 | — | — | no | — | — | Submersible Pump | Grandfoss | 15.0 | 168.0 | Generator | Parkins | 45.0 | — | — | — | — | yes | Colorless and odorless | 30.7 | 7.67 | 1821.0 | 913.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of new elevated tank. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France