Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7211 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Bari | qardho | Waciye | 3.0 | Puntland MoEMW | 14/08/2006 | Waciye borehole | — | 10.0226469 | 49.0389998 | 883.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3000 | 1000 | — | 10000 | — | — | 380.0 | pvc | 8.0 | — | 8.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 96.0 | Galvanised Steel | — | 300 | 1 | 2 | no | — | — | Submersible Pump | Lowara | — | 294.0 | Hybrid - Solar/Generator | Perkins | 45.0 | — | — | good | The borehole distributes water on two elevated water tank. One elevated water distributes water to the kiosks and animal troughs. And onother elevated water tank distribute water to waciye city. The city contains around 300 House holds. | no | — | 27.7 | 7.31 | 4150.0 | 2070.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | IOM | 13/08/2018 | Installation of solar power system. Replacement of main raising pipes and submersible pump. | Replacement of all rusted distribution iron pipes. Replacement of main raising pipes and submersible pump. Generator. Construction of one kiosks. | — | — |
7535 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 08/02/2015 | Goldogob water company BH 4 | — | 7.0312549 | 47.0079111 | 362.0 | — | 11 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 225.0 | pvc | 8.0 | 145.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | PVC | 6250.0 | 1200 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Generator | Parkins | 40.0 | — | — | fair | — | yes | Colorless and odorless | 30.3 | 7.58 | 1580.0 | 791.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Installation of solar power 2. Fancing 3. Installation of new generator | — | — |
7534 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 13/03/2017 | Goldogob water company BH 5 | — | 7.0437981 | 47.0129558 | 352.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 2786.0 | 7000 | — | — | — | — | — | Submersible Pump | Grandfoss | 15.0 | 126.0 | Hybrid - Solar/Generator | IVECO | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | — | — | — | — | — | — | — | 1. Fancing of borehole 2. Rehabilitation of generator. | — | — |
7180 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/03/2004 | Goldogob water company BH 2 | — | 7.0297561 | 47.005359 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 42000 | — | — | — | 0.0 | — | 215.0 | pvc | 8.0 | 144.0 | 9.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | 13344.0 | 2224 | 1 | 2 | yes | 15 | 10.0 | Submersible Pump | Lowara | 15.0 | 192.0 | Hybrid - Solar/Generator | Parkins | 60.0 | — | — | fair | — | yes | Colorless and odorless | 30.5 | 7.51 | 2950.0 | 1455.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | UNICEF | 08/01/2021 | 1. Construction of new elevated tank | 1. Installation of solar power | — | — |
7533 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | UNICEF | 08/03/2017 | Goldogob BH 3 | — | 7.0409077 | 47.0329871 | 345.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 218.0 | pvc | 8.0 | — | 12.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 9532.0 | 1590 | — | — | no | — | — | Submersible Pump | Frankilin | 11.0 | 192.0 | Generator | Parkins | 110.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies. | — | — |
7532 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | — | Goldogob BH 1 | — | 7.0428316 | 47.0341475 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 42000 | 1200 | 400 | 5000 | 2.5 | — | 209.0 | pvc | 8.0 | — | 9.0 | 15.0 | — | 3.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 46.0 | PVC | 1500.0 | 250 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 198.0 | Generator | Parkins | 45.0 | — | — | fair | Needs rehabilitation | yes | Colorless and odorless | 30.8 | 7.56 | 1710.0 | 845.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | GSA | 08/03/2012 | Construction of elevated water tank | 1.Installation of solar power 2. Installation of generator 3. Rehabilitation of pump and riser pipes | — | — |
7139 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Bari | qardho | Carmo | 1.0 | IR | 10/05/2017 | Carmo borehole | — | 9.4533435 | 48.8719451 | 850.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1200 | 300 | 10 | 5000 | 0.25 | — | 260.0 | pvc | 8.0 | — | 9.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 750.0 | — | 1 | 3 | yes | 1 | 9.0 | Submersible Pump | — | — | — | Solar | — | — | BR-M250W | 21.5 | fair | The water is over salt. The village has no water kiosks and water supply system. | no | — | 30.3 | 6.9 | 5990.0 | 2990.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Community_e | 17/02/2019 | Construction of one animal troughs | Replacement of main raising pipes and submersible pump. Rehabilitation of some solar panels and its accessories. Generator. Replacement of rusted distribution pipe lines. Water purification. | — | — |
7345 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Tuur dibi | — | Community | 08/03/2020 | Tuur dibi BH | — | 7.0233423 | 46.9627436 | 346.0 | — | 1 | — | rural | yes | — | Yes | — | 1750 | 2500 | — | 3000 | 0.0 | — | 226.0 | pvc | 8.0 | — | 33.0 | 19.0 | — | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 50.0 | 250 | 2 | 2 | yes | 18 | 8.0 | Submersible Pump | — | 15.0 | 172.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 31.8 | 7.51 | 1810.0 | 898.0 | — | Communal | yes | 08/03/2020 | 3 | 1 | yes | 0.05 | yes | — | — | — | GPLZ and PWDA | 08/01/2022 | 1. Construction of new elevated tank ( GPLG). 2. installation of solar power and construction new koisks and animal thoughts ( PWDA). | plumbing tools | — | — |
7523 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Ceel boos Goldogob | — | — | 08/03/2017 | Ceel booc BH goldogob | — | 7.0321616 | 47.022893 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 750 | — | — | — | — | — | 215.0 | pvc | 8.0 | — | 6.7 | 5.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 94.0 | Galvanised Steel | 70.0 | — | 1 | 2 | yes | 3 | 8.0 | Submersible Pump | — | 11.0 | 192.0 | Generator | Parkins | 30.0 | — | — | poor | Absolutely poor supply, this supply needs full rehabilitation | yes | Colorless and odorless | 32.1 | 7.54 | 2530.0 | 1251.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing. | — | — |
7521 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | WDA | 08/03/1943 | Ceel ciilde BH goldogob | — | 7.031098 | 47.020472 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 2100 | — | — | — | — | — | 200.0 | gi | 8.0 | — | 3.7 | 13.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | Galvanised Steel | 4000.0 | 300 | 2 | 2 | yes | 9 | 8.0 | Submersible Pump | Grand foss | 11.0 | 124.0 | Generator | Parkins | 45.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 32.5 | 7.42 | 2556.0 | 1261.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 08/02/2021 | 1. Construction of new elevated tank tank | 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France